ML20056D654

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jul 1993 for Naps,Units 1 & 2.W/
ML20056D654
Person / Time
Site: North Anna  
Issue date: 07/31/1993
From: Bowling M, Kane G
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
93-504, NUDOCS 9308170272
Download: ML20056D654 (12)


Text

-

~

VIRGINIA 151,1:CTifIC AND t'OWI:lt COMi%NY H ICIIM ONIs, Vilf GINI A 23 2 61 August 10. 1993 U. S. Nuclear Regulatory Commission Serial No.93-504 Attention: Document Control Desk NL&P/JMJ:jmj Washington, D.C. 20555 Docket Nos.

50-338 50-339 License Nos. NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of July 1993.

Very truly yours, As A Ly M. L. Bowling, Manager Nuclear L.icensing and Programs Enclosure cc:

U.S. Nuclear Regulatory Commission 101 Marietta Street, NW l

Suite 2900 i

f Atlanta, GA 30323 l.

l NRC Senior Resident inspector I

North Anna Power Station j

l f

/y/

1 9308170272 930731 PDR ADOCK 0500o333 h

l R

PDR g

t 4

6 VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH:

Julv YEAR:

3993 Approved:

I

' Station Manager

OPERATING DATA REPO2T DOCKET No.:

50 338 DATE: August 2,1993 CONTACT: G. E. Kane r

PHONE: (703) 894-2101 OPERATING STATUS I

l 1.

Uni t N ame :................................ N or t h Anna 1

.j i

2.

Report ing Peri od:......................... July 1993 3.

Licensed Thermal Power (MWt):.............

2,893 4.'

Nameplate Rating (Gross MWe):.............

947

'5.

Design Electrical Rating (Net MWe):.......

907 6.

Maxirmsn Dependable capacity (Gross MWe):..

959 l

7.

Maximum Dependable Capacity (Net MWe):....

911 i

)

8. If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons:_ N/A l

t 1

9.

Power level to which restricted, if any (Net MWe): _ N/A

.10. Reasons for restrictions, if any:

N/A i

?

i i

This Month Y-t-D Cumulative l

I

11. Hours in Reporting Period................................

744.0 5,087.0 132,443.0

12. Number of Hours Reactor was Critical.....................

744.0 2,801.9 96,732.7

j
13. Reactor Reserve Shutdown Hours...........................

0.0 68.8 6,826.8

.j

14. Hours Generator On-Line..................................

744.0 2,771.2 93,767.9 i

1

15. Unit Reserve Shutdown M rs..............................

0.0 0.0 0.0 l

l

16. Gros s T herma l Energy Ger.er at ed (MWH )..................... 2,150,650.2 7,654,618.4 247,830,805.3
17. Gross E l ect r i ca l E nergy Generat ed (MWH)..................

699,966.0 2,505,563.0 81,432,468.0 i

i

'18. Net Electrical Energy Generated (MVH)....................

664,910.0 2,380,152.0 77,094,092.0-

-i

.l

19. Uni t Servi ce F act or.....................................

100.0%

54.5%

70.8%

20. Unit Availability Factor................................

100.0%

54.5%

70.8%

j

21. Unit Capacity Factor (using MDC Net).....................

98.1%

53.5%

65.2%

22. Unit Capacity Factor (using DER Net)...

98.5%

51.6%

64.2%

23. Forced Outage Rate.......................................

0.0%

0.0%

-11.1%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)_N/A
25. If Shutdown at end of Report Period, estimated time of Startup:_N/A
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved

.l IW1TIAL CRITICALTTY INITIAL ELECTRICITY COMMERCIAL DPERATION

~

AVERAGE DAILY UNIT POWER LEVEL i

Docket No.:

50-338-Unit:

NA-1 i

Date:

Aucust 2.

1993-i

Contact:

G.

E. Kane l

Phone:-

(703) 894-2101 l

MONTH:

July 1993 l

DAY AVERAGE DAILY POWER DAY AVERAGE LAILY POWER LEVEL (MWe-Net)

LEVEL (MWe-Net) i 1

899 17 871 2

900 18 896

.[

3 899 19 896 4

899 20 895 5

897 21 895 6

896 22 894 7

896 23 889 8

895 24 880 9

895 25 895 10 895 26 896 11 894 27 896 12 893 28 895 13 892 29 895 f

14 893 30 895 15 893 31 896 16 884 i

i

-i

. Instructions:

l On this format, list the average daily unit power level in MWe-

]

Net for.each day in the reporting month.

Compute to the nearest whole. megawatt..

I d

'I

l NORTH ANNA POWER STATION 4

UNIT NO.:

1 MONTH:

July i

SUMMARY

OF OPERATING EXPERIENCE Page 1 of 1 Listed below in chronological sequence is a

summary ;of operating i

experiences for this month which required load reductions or resulted '. in significant non-load related incidents.

i i

Date

'?ime Data l

July 01, 1993 0000 Began month with unit at 100% power, 950 MWe.

July 16, 1993 0857 Commenced unit ramp-down for TVFT.

l t

0936 Unit stable at approximately 90% power, 880 MWe j

for TVFT.

i 1145 TVFT completed satisfactorily.

t 1150 Commenced unit ramp-up to 100% power.

1200 Unit stable at 100% power, 943 MWe.

July 31, 1993 2400 Ended month with unit at 100% power, 941 MWe.

j i

f 1

3 I

5

-?

?

i 6

4 h

i 1

t i

9

+

t 1

t l

Page 1

of 1

e UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.:

50-338 Report Month Julv Unit Name: __ %A-1 Year:

1993 Date: August 2,

1993

Contact:

G.

E.

Kane

  • No entry this month f

a L

1 i

s a

k i

i I

l I

1

?

i I

3 h

i P

a l

' 1

-UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

50-338-UNIT NAME:

NA-1 DATE: August 2, 1993 REPORT MONTH: July 1993 CONTACT: G.

E.

Kane PHONE: (703) 894-2101 l

1 2

3 4

5

,. No. -

Date Type Duration Reason Method of Licensee System component Cause & Corrective-(hrs)

Shutting Event Code Code Action to Down Reactor Report #

Prevent Recurrence oNo entry this month.

1 4

1: Type

- 2: Reason 3: Method 4:

F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for^ Licensee D= Regulatory Restriction 4= Continuations

' Event Report (LER) File -

E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)

F= Administrative 9=Other G= Operational Error 5:

H=Other (explain)

Exhibit H - Same Source T

i

?

4t ow n =- m v+ w e rgw w-e' e e%9w'ti-+-=

->9 y - w w, tr w ~== ve e e* *t " ww W W we'ver -i w-M" O uv -

T-w--w*****N-7***

(-ter-5

-f*

P**'+++e-WW-*-*verD-' T* w v v

  • Pi t w wr,ewww-P *' wt

'--T we l

'm7=v-W ' w o r' - wW w-

+*w

  • e**wwird-*'evi-e'e**5-7**'evr w'iwe-4e - ww - - i w in wt r+-

er-s-.--

m. m j

OPERATING DATA REPORT f

f DOCKET No.:

50-339 DATE: August 2, 1993 CONTACT:

G. E. Kane PHONE: (703) 894-2101 OPERATING STATUS

?

i 1.

Uni t N ame:................................ North Anna 2 j

f 2.

R eport i ng Per i od:.......................... Jul y 1993

't 3.

Licensed Thereet Power (MWt):.............

2893 4.

Nameplate Rating (Gross MWe):.............

947

- 5.

Design Electrical Rating (Net MWe).......

907

. ~

t 6.

Maximum Dependable Capacity (Gross MWe):

957 7.

Maximum Dependable Capacity (Net MWe):....

909 t

8.

If changes occur in Capacity Ratings (3tems No. 3 thru 7) since last report, give reasons:

l N/A f

i

9. - Power level to which restricted, if any (Wet MWe):,__N/A
10. Reasons for restrictions, if any:

N/A i

1 f

-}

This Month Y-t-D Cumulative l

t

11. Hours i n Repor t i ng Per i od................................

744.0 5,087.0 110,711.0 j

a

-12. Number of Hours Reactor was Critical.....................

744.0 4,855.5 91,899.7

13. R eact or R eserve Shut down Hours...........................

0.0 120.8 6,365.2

}

14. Hours Generat or On-Line.................................

744.0 4,B45.4 90,858.5l l

15. Unit Reserve Shutdown Hours............................

0.0 0.0 0.0

' 16. Gross Therral Energy Generated (MWH).................. 2,063,189.4 13,731,051.2 245,855,815.7 9

17. Gross Electrical Energy Generated (MWH)...

671,157.0 4,4E8,197.0 80,524,913.0

- 18. Net E l ect r i cal Energy Generat ed (MWH )....................

636,073.0 4,265,041.0 77,089,522.0 l

{

19. Uni t Serv i ce F ac t or.....................................

100.0%

95.3%

B2.1%

20. Unit Availability Factor..................

100.0%

95.3%

B2.1%

21. Uni t Capaci ty Factor (usi ng MDC Net ).....................

94.1%

92.2%

77.3%

l'

- 22., Uni t -Capaci ty F actor (using DER Net )....................

94.3%

92.4%

76.8%

23. Forced Outage Rate.......................................

0.0%

4.7%

5.5%

b

24. Shutdowns Scheduled Over Next 6 Months (T ype, Date, and Duration of Each): Refueling outage, September 4,

'1993, 60 days.

)

i

.g

- 25. If Shutdown at end of Report Period, estimated t me cf Startup:

N/A.

8

26. Units in Test. Status (Prior to Commercial Operation):

)

i

. Forecast Achieved INITIAL CRITICAL 17Y ll

' INITIAL ELECTRICITY COMMERCI AL DPERATION

[

i r

w

+-,

I

+

i AVERAGE DAILY UNIT POWER LEVEL Docket No.:

50-339 Unit:

NA-2 Date:

August 2.

1993

Contact:

G.

E.

Kane Phone:

(703) 894-2101 MONTE:

July 1993 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER.

LEVEL (MWe-Net)

LEVEL (MWe-Net) 1 896 17 859 2

892 18 857 3

896 19 849 4

896 20 844 5

895 21 841 6

895 22 836 7

893 23 823-8 892 24 822 9

892 25 818 10 891 26 812 11 889 12 7.

792 12 886 28 792 13 884 29 789 i

14 877 30-787 l

15 863 31 785 16 861 i

i 1

'I Instructions:

On this format, list the average daily unit power level in MWe-Net for each day-in the reporting month.

Compute to the nearest.

whole' megawatt.

l t

1 t

)

l l

NORTH ANNA POWER STRTION i

UNIT NO.:

2 r

MONTH:

July i

)

SUMMARY

OF OPERATING EXPERIENCE i

i Page 1 of.1 l

Listed below in chronological sequence is a

summary of-operating experiences for this month which required load reductions i

or resulted in significant non-load related incidents.

i Date Time Data July 01, 1993 0000 Began month with unit at 100% power, 945 MWe.

i'i July 02, 1993 0855 Commenced unit ramp-down for TVFT.

j 0928 Unit stable at approximately 90%

power, 880 MWe, i

1030 TVFT completed satisfactorily.

I 1032 Commenced unit ramp-up to 100%

i power.

l July 12, 1993 0400 Commenced power coast-down in i

preparation for refueling outage.

July 31, 1993 2400 Ended month with unit at 88% power, 833 MWe in a power coastdown.

i i

t

[

I i

i h

l 1

r:

.i i

r Page 1

of 1

t UNIT SHUTDOWN AND POWER REDUCTIONS

.l Explanation Sheet i

t Docket No.:

50-339 i

'f Report Month Julv Unit Name:

NA-2 Year:

1993 Date: August 2, 1993 t

Contact:

G.

E.

Kane

  • No entry this month.

t b

r I

h 6

i t

t I

s I

4 h

'i

.i l

l 5

-i f

I'l

e UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

50-339+

UNIT NAME:

NA-2 DATE: August 2, 1993 REPORT MONTH: July 1993 CONTACT: G..E.

Kane PHONE: (703) 894-2101 1:

2 3

4 5

No.

.Date-

. Type Duration Reason Method of L.icensee System component Cause & Corrective (hrs)

Shutting Event Code Code Action to Down Reactor Report #

Prevent Recurrence ONo entry this-month.

3: Method-4:

1: Type 2: Reason (explain) 1= Manual Exhibit F - Instructions F= Forced

'A= Equipment Failure S= Scheduled-B= Maintenance or Test 2= Manual Scram for preparation of_ Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory : Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)

F= Administrative 9=Other G= Operational ~ Error 5:

H=Other (explain)

Exhibit H - Same Source u