ML20056C883
| ML20056C883 | |
| Person / Time | |
|---|---|
| Issue date: | 07/20/1993 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | |
| Shared Package | |
| ML20056C880 | List: |
| References | |
| REF-QA-99990003-930720 NUDOCS 9307260083 | |
| Download: ML20056C883 (1) | |
Text
-
Evart Products Company License No General License (10 CFR 31.5)
Evart, Michigan Docket No. 99990003 n
During an NRC inspection conducted from June 10 through 21, 1993, a violation of NRC requirements was identified.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C, the violation is listed below:
10 CFR 31.5(c)(8) requires, in part, that any person who acquires, receives, possesses, uses, or transfers byproduct material in a device pursuant to'the-general license shall, except as provided for in 10 CFR 31.5(c)(9), transfer or dispose of the device containing byproduct material only by transfer to persons holding a specific license pursuant to 10 CFR Parts 39 and 32 or from an Agreement State to receive the device.
Contrary to the above, on or about January 12, 1993, the licensee transferred (lost) a static elimination device containing byproduct material consisting of nominally 10 millicuries (370 negabecquerels) of polonium-210, and. this-transfer was not made to a person holding a specific license pursuant to
- 0 CFR Parts 30 and 32 or from an Agreement State to receive the device.
This is a Severity Level IV violation (Supplement VI).
Pursuant to the provisions of 10 CFR 2.201, Evart Products Company is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, Region III, 799 Roosevelt Road, Glen Ellyn, Illinois, 60137, within 30 days of the date of the letter transmitting this Notice of-Violation (Notice). This reply should be clearly marked as a " Reply to a Hotice of Violation" and should include for' each violation:
(1) the reason 4
for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further violations,.and (4) the date when full compliance will be achieved.
If an adequate reply is not received within the time specified in this Notice, an order ~or a demand for information may be issued as to why the license should not be modified, suspended, or revoked, or why such other action as may be'prope'r should not be taken. Where good cause is shown, consideration will be'given to extendir.g-the response time, f
.J Sin 9%
i s
Dated charles E. Nore ius, Dire'ctor Division of Radiation Safety.
and Safeguards 4
5 9307260083 930720 PDR GA999 ENVEVART.
99990003 PDR:
.. _.