ML20055J193

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec 4.5.2 Re ECCS Subsystems,Modes 1,2 & 3
ML20055J193
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/25/1990
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20055J192 List:
References
NUDOCS 9008010177
Download: ML20055J193 (4)


Text

. . . . . . _ . . . . . . . . . . . . . . . . . . . . . . .

1 i.

-i I

i 2

i 4

I i

. NPF-38-108 ATTACletENT A a

-2

'e;;

o0725 90000101.. AD' ;- [-7)500038,2 PDF FDC P

, _ _ _ _ ~ , . . . - , . , , , , , , .,.:,,

, //

-(MERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS 4.5.2 Each ECCS subsystem shall be descastrated OPERA 8LE:

a.

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the following v61ves are in the indicated po'sitions with the valves key-locked shut:

Valve Number- Valve Function Valve Position '

a. 2SI-V1556 a. Hot Leg Injection a. SHUT

($1-506A)

b. 2SI-V1557 b. Hot Leg Injection b.
  • SHUT

($1-502A)  ;

c. 2SI-V1558 c. Hot Leg Injection I
c. SHUT (SI-5028)
d. 2SI-V1559 d. Hot Log Injection

~

d. SHUT (51-5068) i At least once per 31 days by verifying that each valve (manual, power-operated. or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position, c.

By a visual inspection which verifies that no loose debris (rags, trash, clothing, etc.) is present in the containment which could be -j transported to the safety injection system sump and cause restriction of the pump suctions during LOCA conditions. This visual inspection shall be performed:

1.

For all accessible areas of the containment prior to '

establishing CONTAINMENT INTEGRITY, and 2.

Of the areas affected within containment at the completion.of containment entry when CONTAINMENT INTEGRITY is established.

d. At,least once per 18 months by:

1.

Verifying automatic isolation and interlock action of the '

shutdown cooling system from the keactor Cocient System when the Reactor 700 Coolant Systere pressure (actual or siculeted) is 1 20 psia.

WATERFORD - UNIT 3 3/4 5-4

m p- em.- 75q Yl '

9 a

.e  ;

t t

I b

?

4 b

i t i

s r

b 3

I

+

V f.

).

l-i i

Y:

NPF-38-108 i ATTAClIMENT-B l, -es

['

t y

I- ,a

! t-cc i

i-C-

)E, i

i

s. .

f e

l' I

f

,5 i ..

L-v- a: , - L, , -. . . - - - - . - :- .- , , ~ _ - . . . , , - - . - - .-.....m,,,~-~-~ .-n .,, e _ n,- n n arc, m merwm,, we am-

EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS

. j 4.5.2 Each ECCS subsystem shall be demonstrated OPERABLE: '

a.

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying that the following valves.

are in the indicated po'sitions with the valves _ key-locked shut:

Valve Number Valve Function Valve Position '

a. 2SI-V1556 a. Hot Leg Injection a. SHUT (SI-506A)
b. 251-V1557 b. Hot Leg Injection b.
  • SHUT (SI-502A)

- c. 2SI-V1558 c. Hot Leg ~ Injection c. SHUT (SI-5028) -

d. - 2SI-V155fp d. Not-Leg Injection d. SHUT (SI-5068) i b.

At least once per 31 days by verifying-that each valve (aanval,  !

power uperated, or automatic) in the flow path that is not locked, I sealed, or otherwise secured in position, is in its correct position.

c.

By. a visual inspection which verifies that no loose debris (rags. -

trash, clothing, etc.) is present in the containaant which could be 3 transported to the safety injection system aump and cause restriction [

of the pump suctions during LOCA conditior2. This visual inspection shall be performed:

1.

For all accessible areas of the containment prior to establishing CONTAINMENT INTEGRITY, and 2.

Of the areas affected within containment at the completion of containment entry when CONTAINMENT _ INTEGRITY is established.

d. At least once per 18 months by:

I l.

Verifyihutomatic isolation and interlock action of' the rshutdown~ cooling system from the Reactor Coolant System when  ;

J00 the Reactor 2 20 psia. Coolant I System pressure (actual or simulated) is; i

i

'Aop: t,k odion d 6he open Permissive interlock (OPI) and ,

isdotion valve pcd:Uon cilarms of the shutdown Co I'9 system when the reactoc coolant system pnessvee

(.oc.tval or simqlqfecQ is between 392 psio and 422 psiq.

WATERFORD - UNIT 3 3/4 5-4