Proposed Tech Specs Re Electrical Power Sys
ML20055H945
Person / Time
Site: Millstone 
Issue date: 07/24/1990
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20055H944 List:
References
NUDOCS 9007310186
Download: ML20055H945 (1)


Text

.-

ff[ p,

(( ' ?;i.*

ELECTRICAL POWER SYSTEMS, L

-o IMITING CONDITION FOR OPERATION ACTION (continued).

c.-

With' one offsite circuit and one diesel generator inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by.

Lperforming Surveillance Requirement 4.8.1.1.1.a within one hour and a

at least once )er 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter;vand-if the diesel generator became inopera)le due to any cause other than preplanned

preventative maintenance or testing, demonstrate the OPERABILITY of m

'the remaining OPERABLE diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.5 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> *; restore one of the' inoperable sources to OP' RABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in' at =

J

~.least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and'in COLD SHUTDOWN within toe following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Restcre~ the other A.L. power: source

-(offsite circuit or dieel generator) to:0PERABLE status in-

~

accordance with the provisiens of_ Section 3.8.1.1 Action Statement a or b, as a?propriate with-the time requirement of that Action Statement )ased on the time of initial loss of the remaining-inoperable 'A.C. - power source. A successful test of diosel generator OPERABILITY per Surveillance Requirement 4.8.1.1.2.a.5 performed under this Action Statement for an OPERABLE diesc'. Jenerator or'a restored-to OPERABLE diesel generator satisfies the dieselagenerator

(

' test requirement of Action Statement a or b.

-d, With one diesel generator inoperable, in addition to ACTION b or c l'

above, verify'that:

1.

All required systems subsystems, trains, components, and

' devices that' depend on the remaining OPERABLE diesel generator as a source 'of emergency power areL also ' OPERABLE, and 2.

When ln MODE 1, 2, or 3, the steam-driven auxiliary feedwater

-pump s OPERABLE.

~

If these conditions are not satisfied within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />,1be in at.least HOT STANDBY-within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the f

following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

l e.

With two of the required offsite A.C. circuits ino'perable, demon-strate'the OPERABILITY of t+ diesel generators by sequentially P'7 performing Surveillance Requirement 4.8.1.1.2.a.5' on both diesel I

generators within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, unless the diesel generators are already operating; restore one of'the' inoperable =offsite sources to OPERABLE 1

5 bo-status withrn L4 hours or be in at least HOT STANDBY within,the next

%CM 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. - Following re.itoration of one offsite source, follow Action j

Statement >a with the time requirement of that Action Statement. based o{k

.on the time of initial loss of the remaining inoperable offsite A.C.

o circuit. A successful test (s) of diesel generator OPERABILITY per Surveillance' Requirement 4.8.1.1.2.a.5 performed under this Action

'*o' Statement-for the OPERABLE diesel gc erators satisfies the diesel

'[

generator test requirement of Action Statement a.

h.Ediesel!generatorisrestoredtoOPERABILITY.

  • This test is required to be completed regardless of when the inoperable 1

~

an.a

{

NILLSTONE-UNIT 3 3/4 8-2 1

%y i

es

~

p g es