Person / Time
Issue date: 07/16/1990
From: Calvo J
Office of Nuclear Reactor Regulation
To: Hall W
NUCLEAR ENERGY INSTITUTE (FORMERLY NUCLEAR MGMT &
References
NUDOCS 9007310089
Download: ML20055H884 (6)


Text

,

July 16,1990 i

o Mr. Warren J. Hall, Manager Operations, Management and Support Services Division Nuclear Management and Cesources Council 1776 Eye Street, Suite 300 Washington, DC 20006-2490

Dear Mr. Hall:

Enclosed is a sample Pressure and Temperature Limits Report which represents the staff's current position on the most recent consients received from the Owners Groups during the RCS chapter meetings on May 7-10, 1990. Prior to that meeting, the staff had provided connents on the original sample report submitted by the Westinghouse Owners Group.

Due to time constraints, this report was not able to be discussed at the RCS chapter meeting.

We will be happy to answer any questions you may have on this sample report.

Sincerely, ORIGINAL SIGNED BY JOSE A. CALVO Jose A. Calvo, Chief 4

Technical Specifications Branch Division of Operational Events Assessment, NRR As stated cc:

C. DeDeaux, CEOG Chairman DISTRIBUTION: w/o Enclosurc J. Hinds, WOG Chairwoman TIMurley CHBerlinger P. North, B&WOG Chairman FJMiraglia PWBaranowsity J. Robertson, BWROG Chairman WTRussell.

FGillespie E. Lozito, VEPC0 CERossi JLieberman B. Woods, SCE JGPartlow-ELJordan K. Wilson, FPC nHcrutchfield rwr.ennedy J. Fowler, SERI SAvarga NGMalsch M. Bryan, TVA GMHolahan OTSB Members R. Baker, GPC ACThadani OTSB R/F BKGrimes DOEA R/F JWRoe FJCongel JHConran PDR w/ Enclosure l

' Central; Files w/ Enclosure; 4

DOCUMENT NAME:

LTR WJHALL GILLES i

Ob N

hvh OTSD:00EA:NRR OTSB:D0EA:t OTSB:D0EA:NRR C:0TSB:DOEA:HRR NYGilles FMReinhar RMLobel JACalvo /7M I/

~1/6/90 7 //)/90 1/ g/90 7 //g /90 h/ll"/

ytpMW 900751'0099 900716 PDR REVGP ERONUMRC hh PDC L

e

[NAME) UNIT [X) l.

RCS PRESSURE AND TEMPERATURE LIMITS REPORT (PTLR)

[DA"E) l

. % t to be'used for operation.

For' illustration only.:

'l 1

1 t

i

,...___....__.,,..__,....,_._m.._,.

. - _.....,. ~.

I

-j i

l RCS PRESSURE AND TEMPERATURE LIMITS REPORT for (NAME] UNIT [Xj 1.0 RCS Dressure and Temperature limits Reoort (PTLR)

This PTLR for [NAME] UNIT [X] has been prepared in accordance with the requirements of Technical Specification 5.9.1.7.

. g The Technical Specifications affected by this report are listed below:

LC0 3.4.3 RCS Pressure and Temperature Limits.

LC0 3.4.12 Low Temperature Overpressure Protection System 2.0 RCS Pressure and Temperature Limits The limits for LCO 1.4.3 are presented in the subsection which follows.

These limits have been oeveloped using the NRC-approved methodologies specified in the Bases for Technical Specification-3.4.3.

2.1 RCS Pressure and Temoerature (P/T) Limits (LC0 3.4.3) 2.1.1 The RCS temperature rate-of-change limits are:

a.

A maximum heatup of [100]'F in an) 1-hour period.

b.

A maximum cooldown of [100]'F in any 1-hour period, A maximum temperature change of s [10]'F in any 1-hour period during c.

inservice hydrostatic and leak testing operations-above the heatup and cooldown limit curves.

2.1.2 The RCS P/T limits for heatup, cooldown, inservice hydrostatic and leak testing,- and criticality are specified by Figures 2.1-1 and 2.1-2.

3.0 Low Temoerature Overoressure Protection System (LCO 3.4.12)

The lift setting. limits for the pressurizer Power Operated Relief Valves

/

(PORVs) are presented in the subsection which follows. These lift setting limits have been developed using the'NRC-approved methodologies specified in the Bases for Technical Specification 3.4.12, 3.1 Pressurizer PORV Lift Settina limits The pressurizer PORV lift setting limits are specified by Figure 3.1-1.

Page 2 of h Revision [A]

3

.c-

l RCSPRESSURE/TEMPERATURELIMITSREPORTfor[NAME) UNIT [x]

Curves include allowances of [ l'F and [ ] psi for possible instrument error.

3000.0 THIS FIGURE FOR ILLUSTRATION ONLY.

l DO NOT USE FOR OPERATION.

l

\\

L

///

Leak Test limit

? 2000.0 E

l l,l b

Heatup Rates Up To i

[

J'F/HR OMACGPTABLE

/

/

oi RE Cn ictd

/

/

.u

< ! riticality Limit C

2000.0

/

Based on inservice hydrostatic test-temperature of r

[ ] degrees F for the service period

__^

ACCEMkSt.E up to [ ] EFPY.

RZ6loN j

0.0 O.0 100.0 200.0 300.0-400.0 500.0 HINGAEGG TEMPERATURE (Degrees F)

RCS 8

figure 2.1-1

~

REACTOR COOLANT SYSTEM Heatup Limitations pplicable Up to ( ) EFPY Page 3 of 4 (Revision [A))

I

-l

RCSPRES$URE/TEMPERATURELIMITSREPORTfor(NAME) UNIT [x]

Curves include allowances of ( )*Fand[

) psi for possible instrument error.

3000.0 THis FIGURE FOR ILLUSTRATION ONLY.

DO NOT USE FOR OPERATION, l

/

I 8"

UN& cCEPTABLE

/

I 12EGION

/

1

/

a

/

to

- 2000.0 f

A Coaldown Rates Deg. F/HR

[

Ws

e:

p;f//

acc semes -

y g g6l0 y

- 100 O.0 200.0

'200.0 300.0 400.0 500.0 INB M 45Et TEMPERATURE (Oegrees F)

Figure 2.1-2

.p REACTOR COOLANT SYSTEM

',[

Cooldown Limitations Applicable Up to [ ] EFPY Page 4 of 4 (Revision [A))

+

M 3000 THIS FIGURE FOR ILLUSTRATION ONLY.

j DO NOT USE FOR OPERATION.

g,, 2500 7

I S

f y

J

}

2000 a

(*F)

(psig) 1500 70 530 133 530 163-530 213-575 263 785.

5 313

=1335 2

j 1000 363 2440 1%

G

\\

500 0

0 100 200 300 400 (Auctioneered Low Measured] RCS Temperature, ('F) 3.1-1 Figure 9

  • 46=t (Page 1 of 1)

PORY Setpoint Versus RCS Temperature Unit Name 3.3 51 Amendment WOG-MERITS Rev. A

.