Forwards Safety Insp Rept 50-293/90-14 on 900620-22.No Violations Noted.Util Performance During Exercise Demonstrated Ability to Implement Emergency Plan & EPIPs in Manner That Would Provide Adequate Protective Measures
ML20055F627
Person / Time
Site: Pilgrim
Issue date: 06/28/1990
From: Ronald Bellamy
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
Shared Package
ML20055F628 List:
References
NUDOCS 9007180219
Download: ML20055F627 (2)


See also: IR 05000293/1990014

Text

n.

a

.,

<.

-

.

'

i

'

JUN2t.im

.

)

\\

'

Docket No. 50 293

License No. DPR 35

I

Boston Edison Company.

ATrN:

Mr. Ralph G. Bird

j

Senior Vice President Nuclear

"

Pi!crim Nuclear Power Station -

i

RFD ,:'1 Rocky Hill Road

Plymouth, Massachusetts 02360

<

i

. Gentlemen:

Subject: Inspection No. 50 293/90 14

1

A routine safety inspection of your annual emergency preparedness exercise was conducted

j

by Mr. C. Conklin of this office on June 20 22,1990 at your Pilgrim Nuclear Power Station,

_

Plymouth, Massachusetts. Discussions of our findings were presented by Mr. Conklin to

-]

you and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection consisted of.

selected examination of procedures and representative records, interviews with personnel,

3

and observation of the emergency exercise by the team members.

'

1

Within the scope of this inspection, no violations were identified. Boston Edison Company's

J

_ performance during the exercise demonstrated the ability to implement the Emergency Plan

,

and Emergency Plan Implementing Procedures in a manner that would provide adequate

. protective measures for the health and safety of the public.

j

No reply to this letter is required. Your cooperation with us in this matter is appreciated.

Sincerely,

Original Signed By:

)

Walter J, Pasciah

]

U

Ronald R. Beilamy, Chief

Facilities Radiological Safety

.

and Safeguards Branch

Division of Radiation Safety

L

and Safeguards

'

.

Enclosure:

g\\

4

1

1. NRC Region 1 Inspection Report No. 50-293/90-14

""

d' E

8

9007180219 900628

PDR

ADOCK 05000293

]

rs

'

,*

p

Q

PDC

1, i

g

~

n r*m

. * _ .

11 8

"g+,,M,., . rgM (0 L P 'i .

3-'

,,

+

,

... t M

. - -

-

"

c w

q

-

.

.

Boston Edison Company

2

JUN 2 8 1990

cc w/ encl:

K. Highfill, Station Director

)

R, Anderson, Plant Manager

J. Keyes, Licensing Division Manager

E. Robinson, Nuclear Information Manager

R. Swanson, Nuclear Engineering Department Manager

I

The Honorable Edward J. Markey

The Honorable Edward P. Kirby

The Hono7able Peter V. Forman

B. McIntyre, Chairman, Department of Public Utilities

Chairman, Plymouth Board of Selectmen

Chairman, Duxbury Board of Selectmen

Plymouth Civil Defense Director

P. Agnes, Assistant Secretary of Public Safety, Commonwealth of Massachusetts

S. Pollard, Massachusetts Secretary of Energy Resources

R. Shimshak, MASSPIRG

Public Document Room (PDR)

' Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

'

NRC Residelit Inspector

Commonwealth of Massachusetts (2)

bec w/ encl:

Region'I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

J. Johnson, DRP

D, Mcdonald, NRR

PAO (15)

J. Wiggins, DRP

.

J. MacDonald, SRI

Pilgrim

i

lahy

Co

'n

[,

u

r

.

6p90

6/g/90

90'

OFFICIAL RECORD COPY

c

E