ML20055E818

From kanterella
Jump to navigation Jump to search
Advises of Increased Indemnity Fee for Facility
ML20055E818
Person / Time
Site: Dresden Constellation icon.png
Issue date: 04/05/1971
From: Saltzman J
US ATOMIC ENERGY COMMISSION (AEC)
To: Price E
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20049A268 List:
References
FOIA-90-161 NUDOCS 9007120374
Download: ML20055E818 (1)


Text

.f.. r.

l t

{-

l 4-l 1

l Ber R. Prtee. Director, MWeten of State & Licensee talations l

i i

INCREASED IBMMRITY PER POR 00NtolefBALTH EDESON COWANT (DRESDEN LWIT-j NO. 3) LECEMBE WO. WR-15--80KEf 50-849 Ca March 31,:19711a reviewsag the Aativities Digest put ' st by the e

Divistem of Roseter Liesasies.- I diseevered that-Ansadmeat No.1 t's

-i DPR-15 isound to ca-manwealth scimen esapany was teemed _ autborisint -

l operation of the-Dresden twit 3 reactor at steady State power levelm

-4 not in exeems-of 2.527 messwatto. (thermal).. However, operation of l

power levels in'.eseess of 5 megewatta (thermal) is subject to the i

satisfactory completion of modifications and final testing (an verificc by the Commission in writint.) of certain components and systems.

I have obtained from Central Files' a copy of Amendmint No. I to D1'Tc03.

In view of the 'antherity in Amendmeat No.,1 for the reactor to bc

~

operated at 2,527 morawatts (and even with the exceptio

.o t'ie satisfactory completion of modifications and testing);I believe that of fective on the date that keendment 1 was issuod-. March 2, 19 71. -' t he i

Office of the Controller should. bill nn-m,= wealth Edison for indennity fee based on $31 for thessal meswatt and a power level of 2.527 -

monawatts (thermal) for a total fee of $75.810lper year.

Inc Office of the controller is being motified of the new indeinity foc' by. copy of this namorandum. The offies of the Osntroller is remindert 1

of C-ameealth Ediaan's letter of Plebruary 9.1973 and our reply of-1 j'

March 11,1970 in which we agreed to the commonwealth's sustention for-q modification of billing procedures with regard to indemnity fees _ for:

Dresden Unita 1 and 2 so as to provide < for a single billing-period-for both mits. The billing period for Unit 3 should be similarly coordinated.

Diettibetion Pile (Doeket No. 50-249)

D-SIA R/F 8 6 R/F 3erome Saltsaan

'"EitF File -

Chief Iedammtty sad Emport I

'7 Osattet Brameh i

.Divietoa of State and Liseasee s

Relations

(

. ee Office of the controllar

'bl SLR:I&ECB 1

JSaltzman:en i

4/5/71 td 9007120374 900612

[-

PDR FDIA CROUSE90-161 PDR ',

-I