ML20055E816
| ML20055E816 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 04/09/1971 |
| From: | Saltzman J US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Price E US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20049A268 | List: |
| References | |
| FOIA-90-161 NUDOCS 9007120371 | |
| Download: ML20055E816 (2) | |
Text
'Q
.2 J
Q,..
l
+
UNITED STATES ATOMIC ENERGY COMMISSION
)
% g N WASHINGTON. D.C. 2054%
IP 1, WY.
l Eber R.' Price, Director, Division of State & Licensee Relations -
1 INCREASED INDEMNITY FEE FOT'. COFNONWEALTH EDISON COMPANY (DRESDEN tlNIT NO. 3)~ LICENSE NO. DPR-25 -DOCKET 50-249
}
l On thech 31, 1971 in revAewing the Activities Digest > put out by the j
Division of Reactor Licensing, I discovered that Amendment No.1 to i
DPR-25 issued to Commeawealth gaison: Company was= issued authorising i
operation of. the Drerden Unit 3 reactor at steady-state power levels z
not in excess of 2,527 megawatts (thermal). However, operation of._
i power levels in excess of 5 megswatts (thermal) is subject to the' satisfactory completion of modifications and final testing!(as verified i
by the Comission in writing) of certain components and systems.
.I have obtained from Central Files a copy of Amendment No. l' to DPR-25.
In view of the authority in. Amendment No. -1 for the: reactor to be L
-)
operated at 2,527 megawatts. (and even with the exceptions as to the satisfactory completion of modifications and testing)lI believelthat ef fective on the date that Amendment.1 was issued,' March 2.1971, the.
Office of the Controller should bill Commonwealth Edison for indemnity fee based on $30 for thermal megswatt and a power level of 2,527 megawatts (thermal) for a total fee of- $75,810 per year.
The Office'of the Controller is being. notified of the new'indennity: fee by copy 'of this memorandum. The Office of.the Controller is reminded i
of Commonwealth Edison's letter of: February 9,1970 and our. reply lof 1
March 11,1970 in which we-agreed to -the Commonwealth's suggestion for
~
modification of billing procedures with regard to indemnity feasL for
~(
Dresden Units 1 and 2 so as to provide for a single billing period' for both units. The billing period -for Unit 3 chould be similarly coordinated.
- 73, l
Jerome Saltzman 1
Chief,' Indemnity and Export.
. Control Branch'.
1 3
Division of State and Licensee-1 Relations cc: Office of the Controller t
9007120371 900612 PDRi FOIA CROUSE90-161 PDR h,
l
.1
f *'
y,n..
i
.o-Gf(&A Division of Reactor Licensing _
Activities. Digest March 1,1971 through March 26, 1971 1.
Notice of receipt of application for construction permite and facility licenses from Duke Power Company was sent to the Federal Register for j
four_ consecutive publications starting March 11, 1971.. The applicant requests authority to construct and operate two pressurized water :
cj reactors desi nated _as the William B. McGuire Nuclear Station Units 1 6
and 2.
l 2.
Amendment-No. 9 to License No. R-71' issued.to the Regents of the i
University of California incorporates Technical Specifications for operation of the reactor, extends the license' expiration date, and i
restates the, license in its, entirety _to delete those items now included l
in the Technical' Specifications and to consolidate in: current licensing form all pertinent provisions of amendments; issued previously. The' l
~ icense authorizes operation oflthe Argonaut reactor at Los Angeles, l
-California.
l
- 5. -DRL Order issued to the University of Arizona extends the: latest '
l
- completion date of CPRR-1111 to September 1,1971 for modification of.
i the-existing facility.
I 4.
Amendment No.10 and Change No. 8 - to License No.' R-86-issued to !
Lockheed Aircraft Corporation authorizes possession, but not opera-1 tion, of the Radiation: Effects Reactor.
1 5
Amendment No. 1 to DPR-25 issued to' Commonwealth Edison Company authorizes operation of the Dresden Unit 3 reactor at ' steady. state l
power levels not in excess of 2527: megawatts (thermal). Howeverb
]
operation at power levels in-excess of; five, megawatts: (thermal) is-subject to the satisfactory completion of modifications' and final J
testing (as verified by the-Commission in writing) of.the station-output transformer, the' auto-depressurization interlock, and the.
feedwater system.
- 6. = Notice of proposed issuance of-facility 3 operating' license.to.Wiscon-sin Electric Power Company and Wisconsin Michigan Power Company was-published in the Federal' Register on March 6,.1971.
The license-would authorize operation of -the Point Beach Nuclear Plant' Unit 2 in Manitowoc County, Wisconsin at steady state 1 power' levels not to exceed 1518 megawatts (thermal).
7._
Notice of proposed issuance of amendment' to provisibnal operating license to Niagara Mohawk Power. Corporation was published in the:
Federal Register on March lo,1971.. The amendment would authorize l l operation of.the Nine Mile Point Nuclear _ Station at power levels up to 1850 megawatts.(thermal).