ML20055E796
| ML20055E796 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 06/28/1990 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20055E797 | List: |
| References | |
| NUDOCS 9007120343 | |
| Download: ML20055E796 (2) | |
See also: IR 05000336/1990009
Text
f-ls
1
a
g.
. ;
3
.
-
i
i
'
' '
y. ;
<
>
y,
.
j
.g.y+
s.-
.
-
-
j
i
i
Docket No. 50-336
}
'.
t
Northeast Nuclear Energy. Company
'
ATTN: Mr. Edward J..Mroczka
'
Senior Vice President - Nuclear
l
Engineering and Operations -
i
P.O. Edox 270
'
!
'
Hartford, Connecticut
06141-0270
L
,
e
j
Gentlemen:
- 1
4o
-
.
i'
Subject: HRC Region 1 Inspection No. 50-336/90-09
?
'This refers to'the routine resident safety inspection conducted by
,
Mr.'P. HabighorstLof this office on April 17
May 29, 1990 at.Millstonc
,
Nuclear Power Station, Unit 2. Waterford, Connecticut of activities authorized-
i
~ by f;RC License No. 0PR-65 and to the discussions of our-findings by _
,
.
lir.- Habighorst with Mr. J. Smith of'your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the NRC Region I
inspection = report which'is-enclosed with this' letter. Within these areas, the
inspection consisted of observation of activities, interviews with personnel,
~
measurements, and document reviews.
.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
-Notice of Violation enclosed herein as Appendix'A.
The violation involved the
improper performance of surveillance required'by technical specifications on'
.
the' main station batteries. This violation has been categorized by severity
~
level in accordance with the " General Statement of Policy and Procedure for NRC
'
Enforccinent Actions," 10 CFR Part 2, Appendix C-_(Enforcement Policy,1990).
'
You are required to respond to this letter and'in preparing your. response, you'
.
should follow the instructions in Appendix A,
While the safety _ significance of
the' violation _is low, we.are concerned that procedures were not followed on
numerous occasions and that a supervisor accepted out of specification results
'
without an adequate documented evaluation ' Please give particular attention to--
these matters _in your response.
Your cooperation with us is appreciated.
.
Sincerely,
>
Oir. Ell SIGTED CY
EDWN1D 0. WENDNGER
.
,
9007120343 90062e
Edward C, Wenzinger, Chief
-
-
ADOCK 05000336
Projects Branch No. 4
C!
Division of Reactor Projects
Enclosures:
r
(
1." Appendix A, Notice of Violation
I
2. NRC Region 1 Inspection Report No. 50-336/90-09
'
g4
OFFICIAL RECORD C0pY
IR MILL 2 90-09 - 0001.0.0-
g60 /
,-;*
F{,
e
.
.
-
s
~
Northeast Nuclear Energy Company
2
cc w/encis:
,
W. D. Romberg, Vice President, Nuclear Operations
S. E. Scace, Station Director, Millstone
<
D. O. Nordquist, Director of Quality Services
R. M. Kacich, Manager, Generation Facilities Licensing
E. A. DeBarba, Station Director, Haddam Neck
,
'
Gerald Garfield, Esquire
.
Public' Document Room (PDR)
'
Local Public Document Rcom (LPDR)
Nucioar Safety Information Center (NSIC)
,
NRC Senior Resident Inspector (Receives 2.790 Information)
State of Connecticut
J. S. Keenan, Nuclear Unit Director, Millstone Unit 2
b:c w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enclosures)
DRP Section Chief
J. Shediosky, SRI, Haddam Neck
W. Rayi..ond, SRI Millstone
G. Vissing, NRR/PDI-4
!
R. Bellamy, DRSS
D. Holody, EO
J. Strosneider, DRS (Section 5.1)
bec w/ Executive Summary only:
W. Kane, DRP
J. Wiggins, DRP
W. Hodges, DRS
W. Johnston, DRS
(
J. Durr, DRS
j
R. Gallo, DRS
!
M. Knapp, DRSS
R. Cooper, DRSS
J. Stoltz, NRR/PDI-4
l
-k
n?"
i
1
0%);ld , @i#)
'
l'
y
W
P
R/6RP
-
P
R:DJ
RI , ig
>
j
y
nt,
,
't
er
P.
rst/geb
d
r
p
t
$
j
06
/90
06/g90
)
06/,$90
06/g90
!
0FFICIAL RECORD COPY
IR MILL 2 90-09 - 0002.0.0
11/29/80
i
f
3