Requests Extension Until 820831 to Respond to 820630 Request for Documentation of Compliance w/NUREG-0737,Item II.B.3 Re post-accident Sampling Capability.Delay Due to Significant Addl Research
ML20055C148
Person / Time
Site: Beaver Valley
Issue date: 07/30/1982
From: Carey J
DUQUESNE LIGHT CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.3, TASK-TM TAC-44421, NUDOCS 8208100281
Download: ML20055C148 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

s a

"%5 Telephone (412) 4564000 Nuclear Division P.O. Box 4 Shippingport, PA 15077-0004 July 30, 1982 i

I Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch No. I Division of Licensing Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. L Docket No. 50-334, License No. DPR-66 NUREG-0737, Item II.B.3; Post Accident Sampling Capability Post Implementation Review Centlemen:

Your letter of June 30, 1982 identified the Staff's intention to conduct a post-implementation review of NUREG-0737 item II.B.3, Post Accident Sampling Capability. It was your request that we provide a schedule for responding to Attachment No. L of your letter which contained the NUREG criteria and the Staf f's guidelines which will be used during their post-implementation review. We are to respond by documenting how we have satisfied the clarification items listed in NUREG-0737 item II.B.3. This information was requested within 20 days of receipt of your letter.

Records which document compliance with the original NUREG-0737 requirements are available in the plant records system. Clarifications to each specific II.B.3 item in Attachment No. 1 of your June 30, 1982 letter contained several apparently new requirements being imposed by the Staff. These new requirements do not appear in the previously documented design requirements as referenced by NUREG-0737 item II.B.3 and has required significant additional research to provide a complete response.

We therefore are requesting an extension until August 3L, L982 for responding to your request.

Very truly yours, J. J. Carey Vice President, Nuc lea r ON-l!

8200100281 820730 PDR ADOCK 05000334 P PDR

l

,.' Beaver; Valley Powar Station, Unit No. l

. - Dockst No.'50-334, Licence No. DPR-66 NUREG-0737, Item II.B.3; Post Accident Sampling Capability

. Post Implementation Review Page 2 cc: Mr. W. M.'Troskoski, Resident Inspector.

U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission '

c/o Document Management Branch-Washington, DC 20555 i

G