ij'
!
PJUN 2 4 1982
'
-
t
i
f
Docket No. 50-454
Docket No. 50-455
Commonwealth Edison Company
1
AT7N:
Mr. Cordell Reed
l
Vice President
.
Post Office Box 767
j
Chicago, IL 60690
1
j
Gentlemen:
4
l
This refers to the special safety inspection conducted by Mr. D. H. Danielson
'
and other staff members of this of fice on March 29-31, April 1-2, 5-9,12-14,
and May 11, 1982, of activities at Byron Station, Units 1 & 2, authorized by
NRC Construction Permits No. CPPR-130 and No. CPPR-131. This also refers
to the discussion of our findings with Mr. W. Stiede and others of your staff
during a meeting in our offices on May 7, 1982.
The purpose of this special team inspection was to assess the adequacy of
L
certain aspects of the quality assurance / construction activities at the
Byron Station. The scope of this assessment included audits of quality
,
assurance program interfaces and overview, corrective action systems,
,
j
design change control, material traceability of installed structures and
j
components, electrical cable installation, inprocess inspections, and
!
cffectiveness of quality control inspectors. Within these areas the
I
inspection consisted of a selective examination of procedures and
';
representative records, observations, and interviews with personnel.
In general, within the areas inspected, the quality assurance program
for the Byron Station appeared good. However, exampics of program im-
j
plementation deficiencies were identified which require corrective action
on your part. Please note that we expect Commonwealth Edison Company to
!
review programs for its other facilities under construction to assure that
similar problems do not exist at these facilities.
3
The activities that appeared to be in noncompliance with NRC requirements
,
are specified in the enclosed Appendix. A written response is required.
'
In. responding to noncompliance Item #2, please describe the action taken or
planned to assure that:
(1) other quality control inspectors are properly
!
,
1
,
j
'
_.
i
92072201'64820624
PDR ADOCK 05000454
i
G
/
/LoI
--
-
-. - . - ..
. -
.. - - . - .
.
Commonwealth Edison Company
2
$y99 9 4 ypg
trained and certified, (2) quality control inspectors working for contractors
that have completed safety-related work and no longer have personnel on site
were properly trained and qualified to perform the inspection functions
assigned, and (3) inspections performed by quality control inspectors that
were improperly trained and qualified were valid.
We are also concerned about your past performance concerning the staffing
of the Byron QA Superintendent position and the on-the-job training of
your Byron Site Quality Assurance personnel as discussed in the details
of this report. Please provide us with a response explaining what action
you will be taking to assure that your Quality Assurance Organization
is staffed and trained to a level that will ensure effective oversight of
quality activities.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter will be placed in the Public Document
Room.
i
t
I
i
. - - -
- - - . ...-.--. ,
-, -
-
--
. - . -
-
-
--
,
.
--
- - - - - -
~ - -
_-
- _ _
.
-
.
1
Commonwealth Edison Company
3
attu 9 41982
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
" Original tiened lay C.E. Iforof fudt
C. E. Norelius, Director
Division of Engineering
i
and Technical Programs
Enclosures:
1.
Appendix, Notice
of Violation
'
2.
Inspection Report
No. 50-454/82-05 and
No. 50-455/82-04
t
cc w/encls:
Louis 0. De1 George, Director
of Nuclear Licensing
i
V. I. Schlosser, Project Manager
Gunner Sorensen, Site Project
Superintendent
R. E. Querio, Station
.
Superintendent
(
DMB/ Document Control Desk (RIDS)
J
Resident Inspector, RIII Byron
i
Resident Inspector, RIII
Braidwood
'
Karen Borgstadt, Office of
Assistant Attorney General
Myron M. Cherry
,
1
I
-
.LIA, '
.III
.III
,III
,1,I
.III
.
a w
fow
u
m.
vshis b ,(RIII-HQ)
Wesche l'/ 'p
n
D
son 'Little
Nre{ius
v
y
we cott
Nightengale 5/24/82
<//'" #97
'$
1- g>
W46 ngf-
pr
.
.-
_.
-
_ . .
-
. -
-
.
.
. . .
-
- - -.