Forwards IE Insp Repts 50-440/82-06 & 50-441/82-06 on 820611.No Noncompliance Noted
ML20055B032
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 07/02/1982
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20055B033 List:
References
NUDOCS 8207200283
Download: ML20055B032 (2)


See also: IR 05000440/1982006

Text

r

..

.

t

JUL

2 G62

Docket No. 50-440

Docket No. 50-441

The Cleveland Electric Illuminating

Company

ATTN: Dalwyn R. Davidson

Vice President - System

Engineering and Construction

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the routine safety inspection conducted by Mr. E. H. Nightingale

of this office on June 11, 1982, of activities at the Perry Nuclear Power Plant,

Units 1 and 2, authorized by NRC Construction Permits No. CPPR-148 and

No. CPPR-149 and to the. discussion of our findings with Mr. R. Farrell and others

of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed.in the NRC's

Public Document Room.

If this report contains any information. that you (or

your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of this

letter a written application to this office to withhold such information.

If

your receipt of this letter has been delayed such that less than seven (7) days

are available for your review, please notify this office promptly so that a new

8207200283 820702

~

DR ADOCK 05000

g ^Qj

.

.

The Cleveland Electric

2

JUL

2W

Illuminating Company

due date may be established. Consistent with Section 2.790(b)(1), any such

application must-be accompanied by an affidavit executed by the owner of the

information which identifies the document or part sought to be withheld, and

which contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure. This

section further requires the statement-to address with specificity the con-

siderations listed in 10 CFR 2.790(b)(4). The information sought to be

withheld shall be incorporated as far as possible into a separate part of the

affidavit.

If we do not hear friom you in this regard within the specified

periods noted above, a copy.of this letter and the enclosed inspection report

will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

4/

n W J/$&

W. S. Little, Chief

Engineering Inspection Branch

Enclosure:

Inspection Reports

No. 50-440/82-06(DETP) and

No. 50-441/82-06(DETP)

cc w/ encl:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Power Siting

Commission

Daniel D. Wilt, Attorney

Helen W. Evans, State of Ohio

Robert M. Quillin, Ohio

Department of Health

RI

RIII

-

/so

Da

}f

n

Konk1'n

Littl

6/29/32

7/// k

ggyv

7f