Docket No. 50-440
Docket No. 50-441
The Cleveland Electric Illuminating
Company
ATTN: Dalwyn R. Davidson
Vice President - System
Engineering and Construction
Post Office Box 5000
Cleveland, OH 44101
Gentlemen:
This refers to the routine safety inspection conducted by Mr. E. H. Nightingale
of this office on June 11, 1982, of activities at the Perry Nuclear Power Plant,
Units 1 and 2, authorized by NRC Construction Permits No. CPPR-148 and
No. CPPR-149 and to the. discussion of our findings with Mr. R. Farrell and others
of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed.in the NRC's
Public Document Room.
If this report contains any information. that you (or
your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of this
letter a written application to this office to withhold such information.
If
your receipt of this letter has been delayed such that less than seven (7) days
are available for your review, please notify this office promptly so that a new
8207200283 820702
~
DR ADOCK 05000
g ^Qj
.
.
The Cleveland Electric
2
JUL
2W
Illuminating Company
due date may be established. Consistent with Section 2.790(b)(1), any such
application must-be accompanied by an affidavit executed by the owner of the
information which identifies the document or part sought to be withheld, and
which contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure. This
section further requires the statement-to address with specificity the con-
siderations listed in 10 CFR 2.790(b)(4). The information sought to be
withheld shall be incorporated as far as possible into a separate part of the
If we do not hear friom you in this regard within the specified
periods noted above, a copy.of this letter and the enclosed inspection report
will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
4/
n W J/$&
W. S. Little, Chief
Engineering Inspection Branch
Enclosure:
Inspection Reports
No. 50-440/82-06(DETP) and
No. 50-441/82-06(DETP)
cc w/ encl:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Harold W. Kohn, Power Siting
Commission
Daniel D. Wilt, Attorney
Helen W. Evans, State of Ohio
Robert M. Quillin, Ohio
Department of Health
RI
RIII
-
/so
Da
}f
n
Konk1'n
Littl
6/29/32
7/// k
ggyv
7f