Forwards IE Insp Repts 50-358/82-09 & 30-11989/82-01 on 820614-17.No Noncompliance Noted
ML20055A701
Person / Time
Site: Zimmer, 03011989
Issue date: 07/02/1982
From: John Miller
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
Shared Package
ML20055A702 List:
References
NUDOCS 8207190349
Download: ML20055A701 (2)


See also: IR 05000358/1982009

Text

$

IE HQ FILE COPY

-

JUL 0 21982

Docket No. 50-358

Cincinnati Gas and Electric

Company

ATTN: Mr. Earl A. Borgmann

Senior Vice President

Engineering Services and

Electric Production

139 East 4th Street

Cincinnati, OH 45201

Gentlemen:

This refers to the routine safety inspection conducted by Mr. D. E. Miller of

this office on June 14-17, 1982, of activities at Wm. H. Zimmer Nuclear Power

Station authorized by NRC Construction Permit No. CPPR-88 and NRC Byproduct

Materials License No. 34-07251-04 and to the discussion of our findings with

Mr. D. Erickson at the conclusion of the inspection.

The inspection was an examination of activities conducted under your license

as they relate to radiation safety and to compliance with the Commission's

rules and regulations and with the conditions of your license. The inspec-

tion consisted of a selective examination of procedures and representative

records, observations, independent measurements, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFP 2.790 of the Commission's regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you (or your con-

tractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is

necessary that you (a) notify this office by telephone within ten (10) days

from the date of this letter of your intention to file a request for with-

holding; and (b) submit within twenty-five (25) days from the date of this

letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less than seven (7)

days are available for your review, please notify this office promptly so that

a new due date may be established. Consistent with Section 2.790(b)(1), any

such application must be accompanied by an affidavit executed by the owner of

the information which identifies the document or part sought to be withheld,

and which contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure. This

DA B ,'

ZE06

8207190349 0

PDR ADOCK 0 pop,

G

r

!,.

.

Cincinnati Gas and Electric 2 JUL 0 21982'

Company

section further requires the statement to address with specificity the consider-

ations listed in 10 CFR 2.790(b)(4). The information sought to be withheld

shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted

! above, a copy of this letter and the enclosed inspection report will be placed

I

in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original Signed by J. R. AGlx

J. h. Miller, Chief

Technical Inspection Branch

Enclosure: Inspection Reports

No. 50-358/82-09(DETP) and

No. 03011989/82-01(DETP)

cc w/ enc 1:

J. R. Schott, Plant Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Power Siting

Commission

Citizens Against a Radioactive

Environment

Helen W. Evans, State of Ohio

Robert M. Quillin, Ohio

Department of Health

Thomas Applegate

Thomas Devine, Associate

Director, Institute for

Policy Studies

q

'

RIII RII RIII

Ox1 Y g .

,j

Miller /dm Gr ger 1 r

/82 72- bm.jfer

Ter- /

7 / ,%j

2