ML20055A497

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-305/82-09 on 820401-0531 & Notice of Violation
ML20055A497
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 07/01/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mathews E
WISCONSIN PUBLIC SERVICE CORP.
Shared Package
ML20055A498 List:
References
NUDOCS 8207190078
Download: ML20055A497 (2)


See also: IR 05000305/1982009

Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

.

fJUL 1 1982

Docket No. 50-305

Wisconsin Public Service

Corporation

A'ITN : Mr. E. R. Mathews

Senior Vice President

Power Supply and

Engineering

Post Office Box 1200

Green Bay, WI 54305

Gentlemen:

This refers to the routine safety inspection conducted by Mossrs. R. L. Nelson

and B. E. Fitzpatrick of this office on April 1-30, ar* May 1-31, 1982, of acti-

vities at the Kewaunee Nuclear Power Plant authorized by NRC Operating License

No. DPR-43 and to the discussion of our findings with Mr. D. C. Ilintz at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during the

inspection. Within these areas, the inspection consisted of a selective exami-

nation of procedures and representative records, observations, and interviews

with personnel.

During this inspection, certain of your activities appeared to be in noncom-

pliance with NRC requirements, as described in the enclosed Appendix. The

inspection showed that action had been taken to correct the identified non-

compliance and to prevent recurrence. Consequently, no reply to this noncom-

pliance is required cnd we have no further questions regarding this matter at

this time.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC's Public

Document Room. If this report contains any information that you (or your con-

tractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is

necessary that you (a) notify this office by telephone within ten (10) days

from the date of this letter of your intention to file a request for withholding;

and (b) submit within twenty-five (25) days from the date of this letter a

written application to this office to withhold such information. If your re-

ceipt of this letter has been delayed such that less than seven (7) days are

available for your review, please notify this office promptly so that a new

due date may be established. Consistent with Section 2.790(b)(1), any such

application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part sought to be withheld, and

8207190078 820701

PDR ADOCK 05000305

0 PDR

.r~6~c/

.

.

Wisconsin Public Service 2

Corporation

which contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure. This

section further requires the statement to address with specificity the con-

siderations listed in 10 CFR 2.790(b)(4). The information sought to be with-

held shall be incorporated as far as possible into a separate part of the

affidavit. If we do not hear from you in this regard within the specified

periods noted above, a copy of this letter and the enclosed inspection report

will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

R. L. Spessard for

J. F. Streeter, Chief

Projects Branch 2

Enclosure: Inspection Report

No. 50-305/82-09(DPRP)

cc w/ enc 1:

D. C. Ilintz, Plant

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Stanley York, Chairman

Public Service Commission

RIII RII RI ^

RII

/

/ Of+4

Nelson /dm

4.)h ( /i

pessard

konklin eke

6/28/82 y[ggy