Text
<
,
6
.
,
a
MAY 211982
.
Tennessee Valley Authority
ATTft: fir. H. G. Parris
fianager of Power
500A Chestnut Street Tower II
Chattanooga, Tl4 37401
Gentlemen:
Subject:
Report fios
/8f-103nd50-328/82-10
This refers to the routine safety inspection conducted by ltr. E. J. Ford of this
office on April 6 - Itay 5,1982, of activities authorized by NRC Operating
License llos. DPR-77 and DPR-79 for the Sequoyah facility.
Our preliminary
findings were discussed with lir. C. C. iiason, Plant Superintendent, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate flRC requirements.
These items and references to pertinent
requirements are listed in the flotice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
One new unresolved item is identified in the enclosed inspection report. This
item will be examined during subsequent inspections.
1
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will
be placed in the f4RC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
l
cation to withhold infonnation contained therein within thirty days of the date
!
of this letter.
Such application must be consistent with the requirements of
2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of lianagement and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
8207150567 820630
PDR ADOCK 05000327
G
_ _ _ _ _ _ _ _ _
-
-
,
<
y d 7,1
Tennessee Valley lothority
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
N
F. J. Long, Acting Chief
l
Reactor Project Branch 1
Division of Project and
!
Resident Programs
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report flos. 50-327/82-10
and 50-328/82-10
.
cc w/ encl:
H. J. Green, Director of fluclear Power
G. G. Stack, Project flanager
C. C. liason, Plant
Superintendent
J. F. Cox, Supervisor, fluclear
Licensing Section
l'1. J. Burzynski, Project Engineer
H.14. Culver, Chief, fluclear Safety
Review Staff
bcc w/ encl:
ilRC Resident Inspector
Document flanagement Branch
State of Tennessee
RII
RII
Fr I
J
R
W W
Ch
C
c/2(
EJFord:dt
rienjak
DR u ck
FJLong
5/[(/82
5//,[/82
5// /82
5/ j/82
/
7
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
_
_ _ _ _ _ _ _ _ _ .
_ _ _ _ _ _ _