Forwards IE Insp Repts 50-327/82-10 & 50-328/82-10 on 820406-0505 & Notice of Violation
ML20055A197
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/21/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20055A184 List:
References
NUDOCS 8207150567
Download: ML20055A197 (2)


See also: IR 05000327/1982010

Text

< ,

. 6 ,

a

.

MAY 211982

Tennessee Valley Authority

ATTft: fir. H. G. Parris

fianager of Power

500A Chestnut Street Tower II

Chattanooga, Tl4 37401

Gentlemen:

Subject: Report fios /8f-103nd50-328/82-10

This refers to the routine safety inspection conducted by ltr. E. J. Ford of this

office on April 6 - Itay 5,1982, of activities authorized by NRC Operating

License llos. DPR-77 and DPR-79 for the Sequoyah facility. Our preliminary

findings were discussed with lir. C. C. iiason, Plant Superintendent, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate flRC requirements. These items and references to pertinent

requirements are listed in the flotice of Violation enclosed herewith as

Appendix A. Elements to be included in your response are delineated in

Appendix A.

One new unresolved item is identified in the enclosed inspection report. This

item will be examined during subsequent inspections.

1

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the f4RC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

l cation to withhold infonnation contained therein within thirty days of the date

! of this letter. Such application must be consistent with the requirements of

2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of lianagement and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

8207150567 820630

PDR ADOCK 05000327

G PDR

_ _ _ _ _ _ _ _ _

-

- ,

<

y d 7,1

Tennessee Valley lothority 2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

N

F. J. Long, Acting Chief l

Reactor Project Branch 1

Division of Project and  !

Resident Programs

Enclosures:

1. Appendix A, Notice of Violation

2. Inspection Report flos. 50-327/82-10

and 50-328/82-10 .

cc w/ encl:

H. J. Green, Director of fluclear Power

G. G. Stack, Project flanager

C. C. liason, Plant

Superintendent

J. F. Cox, Supervisor, fluclear

Licensing Section

l'1. J. Burzynski, Project Engineer

H.14. Culver, Chief, fluclear Safety

Review Staff

bcc w/ encl:

ilRC Resident Inspector

Document flanagement Branch

State of Tennessee

Fr I R RII RII

W W

EJFord:dt

J

Ch

rienjak

C

DR u ck FJLong

c/2(

5/[(/82 5//,[/82 5/7j/82 5////82

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _