2NB
.
.
June 28, 1982
Docket No. 50-10
Docket No. 50-237
Docket No. 50-249
Commonwealth Edison Company
NITN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the special follow-up inspection conducted by Mr. J. P. Patterson
of this office on June 10, 1982, of the prompt public notification / warning
system for the Dresden Nuclear Generating Station, Units 1, 2 and 3, and to
the discussion of our findings with Mr. Ronald Ragen, Assistant Superintendent
for Operations, and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. b'Ithin these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt or this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new duc date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
8207150565 820628
M
DR ADOCK 05000
g d(
.
Commonwealth Edison Company
2
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
.
Sincerely,
,
CLf'U.LCW
,
C.
Papetiello, Chief
.
Program Support Branch
Enclosure
Inspection
Report No. 50-10/82-07(DEPOS);
No. 50-237/82-11(DEPOS)
and No. 50-249/82-12(DEPOS)
cc w/ encl:
Louis 0. De1 George, Director
of Nuclear Licensing
D. J. Scott, Station
Superintendent
D31B/ Document Control Desk (RIDS)
Resident inspector, RIII
Karen Borgstadt, Office of
Assistant Attorney General
RIII
RIII
RI
,
/'yE
fmV (h'y /f g g-
Patte s /jp
Ax
n
Pa
cu llo
-
l
6/24/82
(,g ( fy,
i
{*
{
1