ML20055A169

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1982
ML20055A169
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/01/1982
From: Peterson D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20055A161 List:
References
NUDOCS 8207150541
Download: ML20055A169 (4)


Text

=

OPERATING DATA REPORT DOCKET NO.

50-255 DATE 7-1-82 CO>lPLETED liY DPeternnn TELEPHONE (61M 76b 8913 OPE RATING ST ATUS Palisades Notes

1. Unit Name:
2. Reporting Period:

820601-820690

3. Licensed Thermal Power 151Wt):

2510 t

4. Namep!.ite Rating (Gross 31We):

811.7 805

5. Der,ign Electrical Rating (Net 31We):
  • 675
6. Stasimum Dependable Capacity (Gross 31We):

i

7. 31asimum Dependable Capacity (Net 31We):
  • A 5 3

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Gise Reasons:

9. Power Lesel To which Restricted.If Any(Net 51We):
10. Reisons For Restrictions. If Any:

This $1onth Yr..to.Date Cumulatise

11. Hours in Reporting Period 720 h3h3 92.318 i

684.1 2101.6 50,824.8

12. Number Of Hours Reactor Was Critical
13. Reactor Resene Shutdown Hours

~

14. Hours Generator On.Line 658.6 1713.6 h7.918.0
15. Unit Rewne Shutdown Hours
16. Gross Thermal Energy Generated (31WH) 67,264 2,228,128 93,635,392 07,920
17. Gross Electrical Energy Generated (5tWH) 1,161,360 29,409,310 IS. Net Electrical Energy Generated (51WH) 480,hn1 1 ino hos 27,622,426 j
19. Unit Senice Factor 91.5 90.s s1.0
20. Unit Availability Factor 91.5 39.5 51.9
21. Unit Capacity Factor (Using SIDC Net) 105.1 ho.2 47.1 62 9 31.7 37.1
22. Unit Capacity Factor (Using DER Net) 7
23. Unit Forced Outage Rate g_q 60 5 34.8-
24. Shutdowns Scheduled Oser Nest 6 Months IType. Date,and Duration of Eachh
25. If Shut Down At Fod Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIA L CRITICA LITY INITI A L ELECTRICITY idMMLFA 4L OPERATION

  • Based on Condenser Backpressure

!i 8207150541 820708 (9/77)

PDR ADOCK 05000255 R

PDR b

AVERAGE DAILY UNIT POWER LEVEL 50-255 DOCKET NO.

Palisadas UNIT 7-1 82 DATE DPe+ -con CO. lPLETED BY -

\\

TELEP110NE (616) 76h-8913 Jtino 1999 5f0NTil DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (stwe. Net)

(51We Net) 758 769 17 I

750 769 ig 2

757 3

go 765 I51 766 20 4

762 673 21 5

755 768 6

22 753 757 23 7

757 762 g

753 758 25 9

751 763 26 10 Th8 7 35 27 11 7b7 lb 28 12 750 0

29 13 757 30 14 b33 31 15 753 16 INSTRUCTIONS On this format. list the aserage daily unit power levelin \\. lWe Net for caeh day in the report the nearest whole megawatt.

(9/771

UNIT SilUIDOWNS AND POWER REDUCTIONS DOCKET NO.

50-259

. UNilNAME Palisades DATE 7-1-82 l

REPORT MONTil JtME COMPLETED IIY DVnan ePerr e

TELEPIIONE 616-76h-8Q13 n.

5 E

3E "h

4 Y"d Licensee

[ t, Cause & Corrective i

No.

Date g

3g i;

_g g 5 Event s u?

El Action to 3

$E 5 ;5 =

Report er i

'g O present Recurrente I

O 10 82 06 12 F

40.h B

1" Primary Coolant Pump Lov Oil Level i

11 82 06 1h F

21.0 A

h Turbine Auto Stop Oil Relief Valve Problem (Reactor was not shutdown).

\\

h 1

i i

I

  • Manual until

.009% pc eer, when spurious high startup r ate signa] resulted in automatic scram.

1 2

3 4

F: Fo ced Reason:

Metimd:

Exlubit G Instructions 1

j S: Scheduled A lignipment Failure (Explain) 1-Manual for Pseparation of Data ll Maintenance of Test 2-Manual Sa un.

linity Sheets for I.icensee i

1.

C Refueling 3 Automatic Scram.

Event Report Ill:R) Fde INUiti.G-D Regulatory Restriction 4-Other (lim plain) 0161)

E-Operator Training & l.icense lixamination F-Administ rative 5

G-Operalional I? ror liixplain) lisinbit I - Same Source pl/77)

Il Other (lixplain)

WW*<RY of OPERATTT;G fxpppyg7. ICE FOR THF 1iO!!TH OF Jty;g yngg The Plant operated at essentially 100% power until June 12 when the Unit was taken off line to restore the oil level in a Primary Coolant Pump.

A turbine trip occurred June 14, shortly after returning to power operation.

Cause of trip was two defective turbine auto stop oil relief valves.

Plant returned to operation later on June 14 and operated at essentially 100%

power the remainder of the month.

l l

l l

t l

l 1

l

!