_ _ _ _ _ _
..f
tj
g
{
f7
p
p
p
JUU 2 91982
Docket Nos. 50-275
50-323
Pacific Gas and Electric Company
P. O. Box 7442
San Francisco, California 94106
Attention: Mr. Philip A. Crane, Jr.
Assistant General Counsel
Gentleinen :
This refers to the inspection activities conducted by Messrs. P. J. Morrill
and J. H. Eckhardt of this office as well as Messrs. K. S. Herring, J. R.
Fair, H. E. Schierling, P. T. Kuo, and H. E. Polk of the NRC headquarters
offices during the month of May 1982, of activities authorized by NRC License
No. DPR-76 and Construction Permit No. 69 related to the Diablo Canyon Independent
Verification Progra.n (IDVP). Mr. Morrill and others of our staff discussed
our findings with Mr. M. Tresler of PG&E on May 14, 1982, with Mr. R. L.
Cloud of R. L. Cloud and Associates on May 13, 1982, with Mr. W. E. Cooper
of.Teledyne Engineering Services on May 26, 1982, and with Mr. W. White of
Be' % eauPower Corporation on May 28, 1982. Mr. J. Knight of NRC Headquarters
c
da( als6 present as an observer during the inspection effort at Teledyne
. - ,
Engineering Services offices in Waltham, Massachusetts.
-
Areas exa:nined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspectors.
No iteins of nonco.npliance with NRC requirements were identified within the
scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the NRC Public Docu11ent Roan unless you notify this office,
l
by telephone, within ten days of the date of this letter and subnit written
l
application to withhold infor; nation contained therein within thirty days
'
of the date of this letter. Such application :nust be consistent with the
require.nents of 2.790(b)(1).
l
'
I
8207150501 820629
gDRADOCK 05000275
/v
i RR L L"
HERbtGhi
"
l
N'G" ' .h
'
P'
'S
G'
u
t
om)
6/t582
5M 55' "E5f/52"
'6/zP/52"
'6/ff/B2"
"6
82'
'
'
- Nac row m oc eo sucu eno
OFFICIAL RECORD COPY
_ M E"f*fo-jff%
_
-__
_-
____
__ __ _______ -_
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _
-
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
!
-
Pacific Gas & Electric Company
-2-
1
.
1
i
Should you have any questions concerning this inspection, we will be glad
to discuss them with you.
Sincerely,
GT)
-
i
l
D. M. Sternberg, Chief
Reactor Operations Project Branch
Enclosure:
IE Inspection Report
Nos. 50-275/82-20
50-323/82-10
,
cc w/o enclosure:
J. L. Schuyler, PG&E
J. D. Shiffer, PGLE
W. A. Raymond, PGLE
cc w/ enclosure:
R. C. Thornberry, PG&E (Diablo Canyon)
,
W. F. Cooper, Teledyne
f
bcc: DMB/ Document Control Desk (RIDS)
Distributed by RV:
'
.
State of CA (Johnson)
I
Sandra Silver (Report only)
RHE (w/o enclosure)
'
Resident Inspectcr
,
!
.
.
!
j
l
i
!
I
1
l
i
I