Forwards IE Insp Rept 50-275/82-20 & 50-323/82-10 on 820506-28.No Noncompliance Noted
ML20055A126
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/29/1982
From: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20055A127 List:
References
NUDOCS 8207150501
Download: ML20055A126 (2)


See also: IR 05000275/1982020

Text

_ _ _ _ _ _

..f

tj

g

{

f7

p

p

p

JUU 2 91982

Docket Nos. 50-275

50-323

Pacific Gas and Electric Company

P. O. Box 7442

San Francisco, California 94106

Attention: Mr. Philip A. Crane, Jr.

Assistant General Counsel

Gentleinen :

This refers to the inspection activities conducted by Messrs. P. J. Morrill

and J. H. Eckhardt of this office as well as Messrs. K. S. Herring, J. R.

Fair, H. E. Schierling, P. T. Kuo, and H. E. Polk of the NRC headquarters

offices during the month of May 1982, of activities authorized by NRC License

No. DPR-76 and Construction Permit No. 69 related to the Diablo Canyon Independent

Verification Progra.n (IDVP). Mr. Morrill and others of our staff discussed

our findings with Mr. M. Tresler of PG&E on May 14, 1982, with Mr. R. L.

Cloud of R. L. Cloud and Associates on May 13, 1982, with Mr. W. E. Cooper

of.Teledyne Engineering Services on May 26, 1982, and with Mr. W. White of

Be' % eauPower Corporation on May 28, 1982. Mr. J. Knight of NRC Headquarters

c

da( als6 present as an observer during the inspection effort at Teledyne

. - ,

Engineering Services offices in Waltham, Massachusetts.

-

Areas exa:nined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspectors.

No iteins of nonco.npliance with NRC requirements were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Docu11ent Roan unless you notify this office,

l

by telephone, within ten days of the date of this letter and subnit written

l

application to withhold infor; nation contained therein within thirty days

'

of the date of this letter. Such application :nust be consistent with the

require.nents of 2.790(b)(1).

l

'

I

8207150501 820629

gDRADOCK 05000275

/v

PDR

i RR L L"

HERbtGhi

"

l

N'G" ' .h

'

P'

'S

G'

u

t

om)

6/t582

5M 55' "E5f/52"

'6/zP/52"

'6/ff/B2"

"6

82'

'

'

Nac row m oc eo sucu eno

OFFICIAL RECORD COPY

_ M E"f*fo-jff%

_

-__

_-

____

__ __ _______ -_

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _

-

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

!

-

Pacific Gas & Electric Company

-2-

1

.

1

i

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely,

GT)

-

i

l

D. M. Sternberg, Chief

Reactor Operations Project Branch

Enclosure:

IE Inspection Report

Nos. 50-275/82-20

50-323/82-10

,

cc w/o enclosure:

J. L. Schuyler, PG&E

J. D. Shiffer, PGLE

W. A. Raymond, PGLE

cc w/ enclosure:

R. C. Thornberry, PG&E (Diablo Canyon)

,

W. F. Cooper, Teledyne

f

bcc: DMB/ Document Control Desk (RIDS)

Distributed by RV:

'

.

State of CA (Johnson)

I

Sandra Silver (Report only)

RHE (w/o enclosure)

'

Resident Inspectcr

,

!

.

.

!

j

l

i

!

I

1

l

i

I