Forwards IE Insp Repts 50-250/82-19 & 50-251/82-19 on 820412-16 & Notice of Violation
ML20055A017
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/19/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20055A010 List:
References
NUDOCS 8207150388
Download: ML20055A017 (2)


See also: IR 05000250/1982019

Text

r

. . .

OFFICIAL RECORD COPY

/

MAY I 91982

Florida Power and Light Company

ATTN: Dr. R. E. Uhrig, Vice President

Advanced Systems and Technology

P. O. Box 529100

Miami, FL 33152

Gentlemen:

Subject: Report Nos. 601250/82-D,nd 50-251/82-19

This refers to the routine inspection conducted by Mr. C. D. Evans of this office

on April 12-16, 1982, of activities authorized by NRC Operating License Nos.

DPR-31 and DPR-41 for the Turkey Point facility. Our preliminary findings were

discussed with Mr. H. E. Yaeger, Site Manager, at the conclusion of the inspec-

tion.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector. The Region II Mobile Laboratory

was also brought to your site and used by the inspector to make certain indepen-

dent measurements. The basic purpose of these independent measurements is to

verify your capability for analyzing radioactive effluents, and to achieve and

maintain comparable methods of analyses between your facility and the NRC. The

complete data from these measurements will be reported in a subsequent Inspection

Report.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A. Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

8207150388 820707

PDR ADOCK 05000250

0 PDR

k-

i

. .

.

  • !

MAY l J 1382

Florida Power and Light Company 2

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Of fice of Management and Budget as required by tne

Paperwork Reduction Act of 1930. PL 96-511.

Shoula you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

M

R. C. Lewi s , Di rector

Division of Project and

Resident Programs

Enclosures:

1. Appendix A, Notice of Violation

2. Inspection Report Nos. 50-250/82-19

and 50-251/82-19

cc w/ encl:

H. E. Yaeger, Site Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Florica

e

RII RII , RII RII RII ,

j. - }D }k gaf /

CDEvans:ejw DMMontgomery JPS+ hr r,La nd i s HCDa ce

5/;7/82 5/jy'32 5/ '82

5/d/82 5/p/82