Forwards IE Insp Rept 50-362/82-11 on 820524-28 & Notice of Violation
ML20055A005
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 06/29/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20055A006 List:
References
NUDOCS 8207150375
Download: ML20055A005 (2)


See also: IR 05000362/1982011

Text

-

-

.

'

~

-

-

s

g

.

.,

-

2'

&

W

&

Q-

N-

Q

gy, '

,

JUN 29 N

.

,

J

Docket No. 50-362

Southern California Edison Company

P. O. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention:

Dr. L. T. Papay, Vice President

Advanced Engineerir.g

.,

Gentlemen:

'

(,SJbject:

NRC Inspection of San Onofre Unit 3

This refers to the routine inspection conducted by fiessrs G. Hernandez

and W. J. Wagner of this office on fiay 24-28, 1982 of activities authorized

by NRC Construction Pemit No. 93, and to the discussion of our findings

held with memb'ers of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspector.

3

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix A.

Your response to this Notice is to be submitted in accordance with the

provisions of 10 CFR 2.201 as stated in Appendix A. Notice of Violation.

In accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosure will be placed in the NRC Public Document Room unless you

notify this office, by telephone, within ten days of the date of this

letter and submit written application to withhold information contained

'

therein within thirty days of the date of this letter. Such application

must be consistent with the requirements of 2.790(b)(1).

l

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

8207150375 020629

/6O /

PDR ADOCK 05000362

l

!

O

PDR

@Fk

o-o . RV @'k 4d..

. dru

2

.

.

_

ECKH RDT

BISR0P

suaam)

WAGNER /mn

HERNAtjDE,Z

,6/ M/82

, 6/38/82, ...

, A. JOHf.iSON

..

,

,

o.u )

6/0/82

6/9//82

6#1/82

,

..

.

.

.

.

yac eow m nomomucu e24o

OFFICIAL RECORD COPY

"='eze

_ _ _ _ _ _ _ _

.

-

1

Southern California Edison Company

-2-

-

The responses directed by this letter and the accompanying Notico are

not subject to the clearance procedures of the Office of tianagement and

Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

Sincerely.

Original signed by

J . !i . Eckhardt for

T. W. Bishop, Chief

Reactor Construction Projects Branch

Enclosure:

1.

Notice of Violation - Appendix A

2.

NRC Inspection Report

No. 50-362/82-11

cc w/o enclosure:

R. Dietch, SCE

11. B. Ray, SCE (San Clemente)

f

bce:

DMB/ Document Control Desk (RIDS)

Distributed by RV:

Engelken (w/ encl 1)

A. Johnson (w/ encl l'& 2)

Project Inspector

Resident Inspector

State of CA (Johnson)

..

l,

e

~

,

_ _= - - - _q

n_

--

l