Forwards IE Insp Rept 50-389/82-12 on 820317-19 & Notice of Deviation
ML20054N009
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 04/09/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20054N001 List:
References
NUDOCS 8207150264
Download: ML20054N009 (2)


See also: IR 05000389/1982012

Text

r

.

s

.,

,

APR

9 1982

Florida Power ar.d Light Company

ATTN:

Dr. R. E. Uhrig, Vice President

Advanced Systems and Technology

P. O. Box 529100

Miami, FL 33152

Gentlemen:

Subject:

Report No. 50-389/82-12

This refers to the routine safety inspection conducted by Mr. W. H. Miller, Jr. ,

of this office on March 17-19, 1982, of activities authorized by NRC Construction

Permit No. CPPR-144 for the St. Lucie facility.

Our preliminary findings were

discussed with Mr. B. J. Escue, Site Manager, at the conclusion of the inspec-

tion.

Areas examined during this inspection included fire protection / prevention. With-

in these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspectors.

Within the scope of this inspection, no violations were disclosed.

During the inspection it was found that certain activities under your license

appeared to deviate from commitments to the Commission and have safety signifi-

cance. This item is identified in the Notice of Deviation enclosed herewith as

Appendix A.

Please provide us in writing within 30 days of your receipt of this

letter your comments including a description of corrective actions that have been

or will be taken, corrective actions which will be taken to avoid further devi-

ations, and the date your corrective actions were or will be completed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

'

of this letter.

Such application must be consistent with the requirements of

2. 790( b)( 1) .

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

8207150264 820702

PDR ADOCK 05000389

G

PDR

T

'

..

.

Florida Power and Light Company

2

APR

9 198p

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. J. Long, Acting Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosures:

1.

Appendix A, Notice of Deviation

2.

Inspection Report No. 50-389/82-12

cc w/ encl:

8. J. Escue, Plant Manager

N. Weems, Assistant QA

Construction Manager

bcc w/ enc 1:

NRC Resident Inspector

Document Management Branch

State of Florida

RII

RI

RII

RII

RII

RI

RI

p

pHMiller:ht

JTConlon

RHerdt

1shinski

HCD5nce

CEA

'rson

FJ Long

<

L

[f/82

4 h /82

y/7 /82

/t /82

/g /82

3

f ,/82

3/ /8c

4

"YgA