Forwards IE Insp Rept 50-261/82-22 on 820525-28.No Noncompliance Noted
ML20054M996
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 06/21/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML20054M997 List:
References
NUDOCS 8207150248
Download: ML20054M996 (2)


See also: IR 05000261/1982022

Text

{{#Wiki_filter:'

                                                                                          l
 . .
                                             JUN 21 1o82
                                                                           Je {{c"
     Carolina Power and Light Ccmpany
     ATTN:    Mr. J. A. Jones Senior Executive
                Vice President and Chief
                  Operating Of ficer
     411 Fayetteville Street
     Raleigh, NC 27602
     Gentlemen:
     Subject:    Report No. 50-261/82-22
     This refers to the routine safety inspection conducted by Mr. H. L. Whitener of
     this office on May 25-28, 1982, of activities authorized by NRC Operating License
     No. OPR-23 for the H. B. Robinson facility and to the discussion of our findings
     held with Mr. Zimmerman, Director - Planning and Scheduling, at the conclusion of
     the inspection.
     Areas examined during the inspection and our findings are discussed in the
     enclosed inspection report.      Within these areas, the inspection consisted of
     selective examinations of procedure: and representative records, interviews with
     personnel, and observations by the inspector.
     Within the scope of this inspection, no violations or deviations were disclosed.
     We have examined actions you have taken with regard to previously reported
     unresolved items. The status of these items is discussed in the enclosed
     inspection report.
     In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
     be placed in the NRC's Public Document Room unless you notify this office, by
     telephone, within ten days of the date of this letter and submit written appli-
     cation to withhold information contained therein within thirty days of the date
     of this letter. Such application must be consistent with the requirements of
     10 CFR 2.790(b)(1).
     Should you have any questions concerning this letter, we will be glad to discuss
     them with you.
                                           Sincerely,
                                           F. J. Long, Acting Chief
                                           Reactor Projects Branch 1
                                           Division of Project and
                                              Resident Programs
     Enclosure:
     See Page 2
     8207150248 820621
     PDR ADOCK 05000261
     G                    PDR                                                         [Q[
      __
 .   ,.
   r
                                                                      ~
         Carolina Power and Light Company          2
         Enclosure:
         Inspection Report No. 50-261/82-22
         cc w/ encl:
         R. B. Starkey, Jr. , Plant General Manager
         bcc w/ encl:
         NRC Resident Inspector
         Document Management Branch
         State of South Carolina
                                RII
                                                           ~
         R                                         R         RII  ,
                                                                        RI
         HLWhitener:ht          FJape              ARHerdt        sin   FJ ong
         6//7/82                6/jj/8             6 //82    6/p/82
                                                                        6 4 //82

\ }}