Forwards Request for Addl Info Re Remote Shutdown Panel
ML20054M629
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 07/06/1982
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Pollock M
LONG ISLAND LIGHTING CO.
References
NUDOCS 8207140071
Download: ML20054M629 (5)


Text

_ _ _ _. _

DISTRIBUTION:

JUL 6 1982 Document control!(50-322)

NRC PDR L PDR NSIC Docket No.:

50-322 PRC LB#2 Reading EHylton RGilbert/EWeinkam BBordenick, OELD I&E fir. ii.S. Pollock ACRS (16)

Vice President - Nuclear Region I Long Island Lighting Company 175 East Old Country Road Hicksville, New York 11801

Dear Itr. Pollock:

E S3

Subject:

Request for Additional Information - Shoreham Nuclear Power Station M

As a result of our review of your application for an operating license for the Shoreham Nuclear Power Station, we find that we need additional informa-tion regarding the Remote Shutdown Panel. The specific requests for informa-tion are provided in Enclosure 1.

If you have any questions on this matter, please contact the NRC project manager, Edward J. Weinkam III.

\\,

Sincerely, i

s/

x 3D A. Schwencer, Chief h@

Licensing Branch No. 2 Division of Licensing

Enclosure:

As stated cc: See next page 8207140071 820706 PDR ADOCK 05000322 PDR I%

/

DL;,(p,fh/,P.M.,,,DLh[/,B,C,,

omce >

..fRAwanner...

sumue > Qeinksu.kw..

!..e!./.!2

.J./.y/.g2 om>

nac ronu ais omo> Nac.u osa OFFICIAL RECORD COP '

usa mi-meco

~

l Shoreham l

Mr. M. S. Pollock Vice President - Nuclear Long Island Lighting Company 175 East Old Country Road Hicksville, New York 11801 cc:

Howard L. Blau, Esquire MHB Technical Associates Blau and Cohn, PC.

1723 Hamilton Avenue, Suite K 217 Newbridge Road San Jose, Cal.ifornia 95125 Hicksville, New York 11801 Stephen Latham, Esquire Mr. Jay Dunkleberger Twomey, Latham & Shea New York State Energy Office Post Office Box 398 Agency Building 2 33 West Second Street Empire State Plaza Riverhead, New York 11901 Alban9', New York 12223

=

Matthew J. Kelly, Esquire Energy Research Group, Inc.

Staff Counsel 400-1 Totten Pond Road

, New York State Public Service Commission Waltham, Massachusetts 02154 Three Rockefeller Plaza Albany, New Yod 12223 Mr. Jeff Smith Shoreham Nuclear Power Station Ezra I. Bialik, Esquire Post Office Box 618 Assistant Attorney General Wading River, New York 11792 Environmental Protection Bureau New York State Department of Law W. Taylor Reveley, III, E. squire 2 World Trade Center Hunton & Williams New Yod, New York 10047 Post Office Box 1535 Richmond, Virginia 23212 Resident Inspector Shoreham NPS, U.S. NRC Ralph Shapiro, Esquire Post Office Box B Cammer & Shapiro

. Rocky Point, New York 11778 9 East 40th Street New Yod, New Yod 10016 Herbert H. Brown, Esquire Kirkpatrick, Lockhart, Hill, Mr. Brian McCaffrey Christopher & Phillips Long Island Lighting Company 1900 M Street, N.W.

Hicksville, New York 11801.

Washington, D.C.

20036 175 E. Old Country Road Lawrence Coe Lanpher, Esquire Honorable Peter Cohalan Kirkpatrick, Lockhart, Hill, Suffolk County Executive Christopher & Phillips County Executive / Legislative Bldg.

1900 M Street, N.W.

Veteran's Memorial Highway Washington, D.C.

20036 Hauppauge, New York 11788 Karla J. Letsche, Esquire David Gilmartin, Esquire Kidpatrick, Lockhart, Hill, Suffolk County Attorney Christopher & Phillips County Executive / Legislative Bldg.

1900 M Street, N.W.

Veteran's Memcrial Highway Washington, D.C.

20036 Hauppauge, New York 11788

Enclosure.1 REQUIREMENTS TO MEET THE STAFF'S RSP POSITION (1)

The staff requires an item by item verification of how the Shoreham

~

Remote Shutdown Panel (RSP) meets the staff position. This verification-should include a list of the instrumentation and controls at the RSP and the required redundancy for them at alternate locations. These alternate locations should be listed and should all be in reasonably accessible areas 'with regard to the RSP.

It shoula be stated that all of the instrumentation and controls at the RSP and the required alternate locations will be safety grade.

Exceptions to this should be itemized and should only be for equipment that is not needed for hot and subsequently cold shutdown.

This verification should include a description of how the RSP design does not disable any automatic actuation of the ESF functions while the plant is attaining or maintained in hot shutdown unless a particular ESF system is in service at the RSP.

Finally, a summary statement should be included that unequivocally states that the Shoreham RSP design has been reviewed by the applicant and it has been concluded that the design complies with the staff position.

(2)

When transferring control to the RSP, controls for some functions are transferred to maintained contact switches (i.e., valves could change state from positions previously selected in the control room).

DESIGNATE ORIGINAL fortified By

v

,g, The staff requires the applicant to itemize the specific functions where maintained contact switches are used and show for each that cny changes of state in equipment (such as valves) cannot cause equipment damage or system alignment problems.

i (3)

The staff requires verification that fuel pool cooling can be accomplished at an alternate locat' ion to the RSP with the use of the fuel, pool cooling pump "A".

4)

The staff requires that the following additional safety grade indications be provided to meet the staff position with regard to redundancy:

(a)

RHR "A" flow indication (b)

Service Water "A" flow indication (this is considered to be redundant to service water header pressure)

(c)

Suppression pool level indication In addition, the applicant must verify that redundant suppression pool temperature indication will be provided and that each redundant measurement (or set of measurements) is sufficient to determine suppression pool temperature at locations throughout the suppre;sion pool.

This can be accomplished by providing a sufficient number of temperature indicators for each division or by indicating redundant bulk temperatures which is obtained by o

we-r n.e n

~n..---

C 3-averaging a sufficient number of thermocouples so that a representative measurement of the bulk pool temperature is available.

The locations and ease of accessibility should be provi,ded, for all of the above instrumentation.

The staff requires the applicant to commit to prov'ide these additional instruments and to have them installed by the end of the first refueling outage.