Forwards IE Insp Rept 50-445/82-03 & 50-446/82-02 on 820201-0331 & Notice of Violation
ML20054M545
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/14/1982
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20054M546 List:
References
NUDOCS 8207130567
Download: ML20054M545 (2)


See also: IR 05000445/1982003

Text

tj'

@ 4 JLu,1982

Dockets: 50-445/82-03

50-446/82-02

Texas Utilities Generating Company

ATTN: Mr. R. J. Gary, Executive Vice

President and General Manager

2001 Bryan Tower

Dallas, TX 75201

Gentlemen:

This refers to the inspection conducted by our Senior Resident Inspector-

Construction, Messrs. R. G. Taylor and L. Wilborn of the Region IV office,

during February and March 1982, of activities authorized by NRC Construction

Permits CPPR-126 and CPPR-127 for the Comanche Peak facility, Units 1 and 2,

and to the discussion of our findings with Mr. R. G. Tolson and other members

of your staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspectors.

During this inspection, it was found that certain of your activities were not

conducted in full compliance with NRC requirements, as set forth in the Notice

of Violation, enclosed herewith as Enclosure ~1.

Since you have taken corrective

actions which were verified by Mr. Taylor prior to the completion of this

inspection as discussed in paragraph 7 of Appendix B, no reply is required.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter and submit written

application to withhold information contained therein within 30 days of the

{

date of this letter.

Such application must be consistent with the

requirements of 2.790(b)(1).

SRIAh

RPS-A

RPB1 M' DRRP E

D/EIS

RA/pIV

RTaflor/dsm TWesterman

GMadsen

JGag rardo

EJohnson JC@ lins

5/ /82

g/g/82

5/20/82

5/C /82

5/ /82

f/

82

,

ynu

O/

1

-

e

-

'

8207130567 82'061'4

PDR ADOCK 05000445

_

PDR

G

,.

.

.

..

.

. _ _ _ _ _ _

_

__

_ - - _ - -

_ - _ _ .

. _ _ _ _ _

_

_ _ .

_

______ _ _ _ _ - -. .

.

.

-

Texas Utilities Generating

2

E 4 JuV 1932

Company

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

corlainal signed bw

o. c. MADSEN"

G. L. Madsen, Chief

Reactor Project Branch 1

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report 50-445/82-03

50-446/82-02

cc w/ enc 1.

Texas Utilities Generating Company

ATTN:

H. C. Schmidt, Project Manager

2001 Bryan Tower

Dallas, TX 75201

bec to DMB (IE01)

bcc distrib. by RIV:

BC

R. Taylor /D. Kelley

PM

T. Westerman

AE00

L. Wilborn

ELD ~

B. Murray

IE FILE

TPB

IE/RPRIB

RPB2

NRR/DHFS

INFO SYSTEMS

NRR/0LB

J. Collins

RAD ASMT BR

RIV File

RESEARCH

TEXAS STATE DEPT. HEALTH

PDR:HQ

C. Wisner

LPDR

E. Johnson

NSIC

J. Ellis

NTIS

R. Fouke

D.:Preister

,Y

'*f

l