Text
.
.
.
JUN 221982
Docket No. 50-293
License No. DPR-35
Boston Edison Company M/C Nuclear
ATTN: Mr. William D. Harrington
Senior Vice President, Nuclear
800 Boyleston Street
Boston, MA 02199
Gentlemen:
Subject:
Inspection No. 50-293/82-18
This refers to the routine safety inspection conducted by Dr. Jin W. Chung of
this office on June 8-11, 1982 at Pilgrim Nuclear Power Station, Unit 1,
Plymouth, Massachusetts of activities authorized by NRC License No. DPR-35 and
to the discussions of our findings held by Dr. J. W. Chung with
Mr. N. J. Armstrong and other members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were observed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the require-
ments of 2.790(b)(1). The telephone notification of your intent to request
withholding, or any request for an extension of the 10 day period which you
believe necessary, should be made to the Supervisor, Files, Mail and Records,
USNRC Region I, at (215) 337-5223.
No reply to this letter is required.
Your cooperation with us in this matter
is appreciated.
Sincerely,
Original Signed ByI
hhomasT. Martin, Director
i
l Division of Engineering and Technical
J
Programs
~
OFFICIAL RECORD COPY
'
\\
O
s20713015e B20622
\\(j
PDR ADOCK 05000293
G
L
.
.
Boston Edison Company
2
Enclosure:
NRC Region I Inspection Report Number
cc w/ encl:
A. V. Morisi, Manager, Nuclear Operations Support
R. D. Machon, Nuclear Operations Manager - Pilgrim Station
Public Document Room (PDR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Massachusetts (2)
bcc w/ encl:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encis)
T. C. Elsasser
t/
RI:DETP
RI:DETP/$h3
RI:DETP
Chung:as
Bettenhausen
Ebpeter
(l2r/,1-
b lZ.*
/16/82
3
u
0FFICIAL RECORD COPY
L.