AC40 - RA
^ t NRC MONTHLY OPERATING REPORT n
DOCKET NO.
50-361 DATE 14 June 1982 T. D. Hanaford COMPLETED BY,l4-4W-/ /u0 TELEPHONg Ext. 704 OPERATING STATUS
- 1. Unit Name: San Onofre, Unit 2
- 2. Reporting Period:
1 May 1982 through 31 May 1982
- 3. Licensed Thermal Power (MWig 169.5 MWt
- 4. Nameplate Rating IGross MWeP 1127 MWe S. Design Electrical Rating (Net MWe): 1087 MWe 1127 MWe
- 6. Masimum Dependable Capacity (Gross MWe):
1087 MWe
- 7. Masimum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted,If Any (Net MWeg N/A
- 10. Reaums For Restrictions.lf Any:
Unit is in initial startup phase of testina This Month Yr..to.Date Cumulative 744 2519 2519
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor has Critical 0
0-0
- 13. Reactor Resene Shutdown Hours 0
0 0
0 0
0
- 14. Hours Generator On.Line
- 15. Unit Resene Shutdown flours 0
-0 0
0 0
0
- 16. Gross Thermal Energy Generated (MWH) 0 0
0 17 Grow Electrical Energy Generated (MWH) 0 0
0 lb. Net Electrical Energy Generated (MWH) 0 0
0
- 19. Unit Senice Factor 20 Unit Asailability Factor 0
0 0
- 21. Unit Capaciev Factor IUsing \\lDC Net) 0 0
0
- 22. Unit Capacity Factor (Using DER Net) 0 0
0
- 23. Unit Forced Outage Rate 0
0 0
- 24. Shutdowns Scheduled Oser Nest 6 Months IType.Date,and Duration of Eacht:
N/A
- 25. If Shut Down 4: End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior o Commercial Operationi Forecast Achiesed INITI \\ L CRITIC ALITY
._6/27/82 week of 8/9/82 INITI AL ELECTRICITY CO\\t\\tERCI AL OPER ATION 8/15/82 hK050003s3 78 820615 R
Enclosure PDR
o*
TVER \\GL D \\lLY UNIT POWER LEVEL DOCKET NO.
50-361 San Onofre, Unit 2 UNir DATE 3 June 1982 C0\\tPLETED By T. D. Hanaford 714-492-7700 TELEPlf0NE Ext. 704 510Niil May D \\Y AVER AGE D \\lLY PohER LEVEL DAY AVERAGE DAILY POWER LEVEL
(.\\1We Neti 151We-Net )
1 0
0 g7 2
0 0
is 3
0 0
gn 0
4 0
,o 0
s 0
0 0
yy 0
0 3
0 0
s 0
9 0
25 10 0
0
- 6 0
0 ii I:
0 0
,3 0
0 13
,y 0
0 34 30 0
0 15 t e, O
t I
i i
l
,4.o t ) u.
~e w..,.
J
i UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-361 UNIT N AME San Onofre. Unit 2 DATE 3 June 1982 COMPLETED BY T. D Hanaford RI PORT MONTig May TELEPHONE 7] 4-492-7700 Ext. 704 g%
=_
c.
Iwe t
- 2. :
E
,E'4 1.icenwe E
Cause & Currectise go
\\"-
DJ'c i
5?
4 is5 Eveni
~?
4g Ac, inn in 5E E
j5 Repori e n0
}L Present Recurrente c
N/A N/A N/A4 N/A N/A N/A N/A N/A N/A N/A i
I 2
3 4
I. l'orced Reason :
Method:
lalubit F. instinctions S Schednied A.I'quipment Failure (fixplain) 1 -Manual for Preparation of Data li Maintenance or Test
- 2. Manual Scram.
1:ntr> Sheets for 1icensee s'
C. Refueling 3.Autornatic Scr.nn.
ITent Repon eI i R)l'ile INURI G-j D Regularors Restriction 4 Other (1:xplam) 01bl)
I -Opesator liainmp & l.itense I.samination I:. Ad nunnt rative 5
+
G Operaiional I reor (l%ptain)
I'sinbit il S.nne Sontee 11 Othei il splain) i PS50(t) Sil NE W S/pe
~.
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
50-361 UNIT San Onofre. Unit 2 DATE 9 June 1982 COMPLETED BY Gary Dyer TELEPHONE 714-492-7700 Ext. 413 Date/ Time Event May 1, 0001 Unit 2 in Mode 5.
LPSI pump 2P-016 on shutdown cooling.
RCS boron concentration is 1896 ppm.
May 5, 1134 HPSI pump 2P-017, ISI Testing unsatisfactory due to low mini-flow recirculation.
May 9, 1845 Entered Mode 4.
May 14, 2345 Reactor Coolant System Water Inventory Balance per 5023-3-3.37 proved satisfactory;.25 gpm unidentified leakage.
May 18, 0530 Unit 2 entered Mode 3.
RCS temperature at 350 F.
May 26, 2010 RCP 2P-003 upper mechanical seal f ailed.
May 26, 2305 RCP 2P-002 upper mechanical seal failed.
May 27, 1900 During Rod Drop testing, a hign level in Steam Generator E-089 initiated a reactor trip signal.
All rods dropped to the bottom from a height of I
- f6".
Steam Generator level was returned to normal.
May 27, 2000 RCP 2P-002 secured because of upper and middle seal failure.
May 28, 0055 Entered Mode 4.
May 28, 1400 Entered Mode 5.
May 31, 2400 Unit 2 in Mode 5.
RCS temperature is 115 F. RCS is drained down to mid-loop for RCP seal repairs.
HPSI pump 2P-017 remains inoperable.
There were no challenges to the safety valves this reporting period.
...oi.),......,,.
[
REFUELING INFORMATION DOCKET NO. 50-361 UNIT San Onofre, Unit 2 DATE 3 June 1982 COMPLETED BY T. D. Hanaford TELEPHONE 714-492-7700 Ext. 704 1.
Scheduled date for next refueling shutdown.
Not yet determined 2.
Scheduled date for restart following refueling.
Not yet determined 3.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Not yet determined What will these be?
Not yet determined 4.
Scheduled date for submitting proposed licensing action and supporting information.
Not yet determined 5.
Important licensing considerations associated with refueling, e.g.
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
Not yet determined 6.
The number of fuel assemblies.
a)
In the core 217 b)
In the spent fuel storage pool, o
7.
Licensed spent fuel storage capacity.
800 Intended change in spent fuel storage capacity.
N/A 8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
Not yet determined
....t. i n.