ML20054L769

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-275/82-16 & 50-323/82-09 on 820329-0402 & 0510-14 & Notice of Violation
ML20054L769
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/14/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Crane P
PACIFIC GAS & ELECTRIC CO.
Shared Package
ML20054L770 List:
References
NUDOCS 8207080459
Download: ML20054L769 (2)


See also: IR 05000275/1982016

Text

_ _ _ _ _ _ _ _

.

'

.

-

.

.,

-

,

3

,

w

,

v

w

,

w

q

JUN 11 E82.

Docket tas. 50-275, 50-323

Pacific Gas and Electric Company

P. O. Box 7442

San Francisco, California 94120

I

1

Attention: Mr. Philip A. Crane, Jr.

Assistant General Counsel

Gentlemen:

Subject: NRC Inspection of Diablo Canyon Units 1/2

This refers to the inspection conducted by Mr. J. F. Burdoin of this office

on May 10-14, 1982 of activities authorized by NRC License DPR-76 and Construction

Permit No. 69, and to the discussion of our findings held with Mr. R. D.

Etzler and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observatior:s by the inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A.

Your response to this notice is to be submitted in accordance with the provisions

of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained tnerein within thirty days

of the date of this letter. Such application must be consistent with the

requirements of 2.790(o)(1).

(

82070004S9 820614

PDR ADOCK 05000275

.

G

PDR

"f)

k6 ff

lidf " bis

su

omy

'bl)ll85 5))l)EI ' Elf)82

. [. .

nuc mwu m oo mucu 0240

OFFICIAL RECORD COPY

= ww-m e

__

_ _ _ _ _ _ - _ _ _ _

___

__

.

.

.

Pacific Gas and Electric Company

-2-

Juli 11 Ecz

l

l

l

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

l

The responses directed by this letter and the accompanying Notice are not

'

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

Sincerely,

T. W. Bishop, Chief

Reactor Construction Projects Branch

Enclosures:

A.

Notice of Violation

B.

Inspection Report Nos.

50-275/82-16

50-323/82-09

cc w/ enclosures:

W. A. Raymond, PG&E

R. C. Thornberry, PGLE (Diablo Canyon)

bcc: DMB/ Document Control Desk (RIDS)

Distributed by RV:

State of CA (Johnson)

Resident Inspector

Project Inspector

A. Johnson (w/o enc B)

RHE (w/o enc B)

'

Sandra Silver (Report only)

_. .