Forwards IE Insp Repts 50-361/82-20 & 50-362/82-10 on 820410-0524 & Notice of Violation
ML20054L755
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/15/1982
From: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20054L756 List:
References
NUDOCS 8207080437
Download: ML20054L755 (2)


See also: IR 05000361/1982020

Text

..

.

. .

'

N i h2

<

Docket Nos. 50-361, 50-362

Southern California Edison Company

P. O. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention: Dr. L. T. Papay, Vice President

Advanced Engineering

'

Gentlemen:

Subject: NRC Inspection of San Onofre Units 2 and 3

This refers to the routine inspection conducted by Messrs. A. Chaffee,

G. Fiorelli and G. Johnston of this office on April 10 - May 24,1932,

of activities authorized by NRC License No. NPF-10 and Construction Permit

No. CPPRJ98 and to the discussion of our findings held by Mr. A. Chaffee

with Messrs. J. Haynes, J. Curran, W. Moody and other members of the Southern

California Edison Company staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspectors.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix A.

Your response to this notice is to be submitted in accordance with the

provisions of 10 CFR 2.201 as stated in Appendix A. Notice of Violation.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days

of the date of this letter. Such application must be consistent with the

requirementsof2.790(b)(1).

OCK O hhoNg

PDR

"'C'>

Sum wig

.C h /4

F FF EE IFFORELLI

.

01 3 5. . .

J0PNS ON <ETZIG STERNBERG

"6////732" ' 67F/782' "6// V/87 "6/jp/87 "67j f/82""

. .

. . .

..

emceosu m oc wamcue"v OFFICIAL RECORD COPY "'*3*

.

.

S uthern Califcrnia Edis:n Company -2-

'

p

Should you have any questions concerning this inspection we will be glad

to discuss them with you.

The responses directed by this letter and the accompanying flotice are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

Sincerely,

? \

{j

D. M. Stehnberg, Chief

Reactor Operations Projects Branch

Enclosures:

A. Notice of Violation

B. NRC Inspection Report

Nos. 50-361/82-20

50-362/82-10

cc w/o enclosure B:

R. Dietch SCE

bec: DMB/ Document Control Desk (RIDS)

Distributed by RV:

State of CA (Johnson)

RHE (w/o enc B)

A. Johnson (w/o enc B)

Resident Inspector