ML20054L671
| ML20054L671 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 06/24/1982 |
| From: | Little W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20054L672 | List: |
| References | |
| NUDOCS 8207080349 | |
| Download: ML20054L671 (2) | |
See also: IR 05000461/1982009
Text
F
.
!IUN 2 4 ngg
Docket No. 50-461
Illinois Power Company
ATTN:
Mr. W. C. Gerstner
Executive Vice President
500 South 27th Street
Decatur, IL 62525
Gentlemen:
This refers to the routine safety inspection conducted by Mr. K. D. Ward of
this office on June 9 and 10, 1982, of activities at the Clinton Power Station,
Unit 1, authorized by NRC Construction Permit No. CPPR-137 and to the discus-
sion of our findings with you and others of your staff at the conclusion of
the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
I
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
i
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
i
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section furthet requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
J
,
.,
8207080349 820624
y.O/
PDR ADOCK 05000461
g
. . . . _ . - - . - . - _ . , _ _ . . . - _ _ . , _ _ . . _ . _ _ _ _ . _ . . _ , _ _ _ ,
. _ , - , _ . _ _ . _
,
e
'.
.
..
Illinois Power Company
2
JUN 2 4 G8{
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
!
- '
f
W. S. Little, Chief
Engineering Inspection Branch
Enclosure:
Inspection Report
No. 50-461/82-09(DETP)
cc w/ enc 1:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Karen Borgstadt, Office of
Assistant Attorney General
Gary N. Wright, Manager,
Nuclear Facility Safety
Randall L. Plant, Prairie
Alliance
RIII
RIII
RIII
RII-
7
a
dm
D
on
L ttle
j 6/17/82
/,[p/ [L-
4
p