Forwards IE Insp Rept 50-461/82-09 on 820609 & 10.No Noncompliance Noted
ML20054L671
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/24/1982
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML20054L672 List:
References
NUDOCS 8207080349
Download: ML20054L671 (2)


See also: IR 05000461/1982009

Text

F

.

!IUN 2 4 ngg

Docket No. 50-461

Illinois Power Company

ATTN: Mr. W. C. Gerstner

Executive Vice President

500 South 27th Street

Decatur, IL 62525

Gentlemen:

This refers to the routine safety inspection conducted by Mr. K. D. Ward of

this office on June 9 and 10, 1982, of activities at the Clinton Power Station,

Unit 1, authorized by NRC Construction Permit No. CPPR-137 and to the discus-

sion of our findings with you and others of your staff at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

I

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

i NRC's Public Document Room. If this report contains any information

i that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information. If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section furthet requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within J

,

.,

8207080349 820624

PDR ADOCK 05000461

g PDR

y.O/

. . . . _ . - - . - . - _ . , _ _ . . . - _ _ . , _ _ . . _ . _ _ _ _ . _ . . _ , _ _ _ , . _ , - , _ . _ _ . _

,

e

'.

. ..

Illinois Power Company 2 JUN 2 4 G8{

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

f

! *'

W. S. Little, Chief

Engineering Inspection Branch

Enclosure: Inspection Report

No. 50-461/82-09(DETP)

cc w/ enc 1:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Karen Borgstadt, Office of

Assistant Attorney General

Gary N. Wright, Manager,

Nuclear Facility Safety

Randall L. Plant, Prairie

Alliance

RIII RIII RIII RII-

a dm D on 7 L ttle

j 6/17/82 /,[p/ [L- 4 p