2 5 JUN 1982
, Docket No. 50-271 Vemont Yankee Nuclear Power Corporation ATTN: Mr. J. B. Sinclair i
Licensing Engineer 1671 Worcester Road Framingham, Massachusetts 01701 Gentlemen:
SUBJECT:
CONFIRMATORY ACTION LETTER (82-13)
This refers to your letter dated June 15, 1982, in response to our letter dated April 28,1982.
Thank you for infoming us of the corrective and preventive actions documented in your letter. These' actions will be examined during a future inspection of your licensed program.
Your cooperation with us is appreciated.
Sincerely.
Original Signed By:
George H. Smith, Director Division of Emergency Preparedness and Operational Support cc:
Mr. Warren P. Murphy, Plant Manager Mr. W. F. Conway, President and Chief Executive Officer Mr. E. W. Jackson, Manager of Operations Mr. L. H. Heider, Vice President Public Document Room (PDR) (LPDR) (
Local Public Document Room Nuclear Safety Information Center NSIC)
NRC Resident Inspector i
State of New Hampshire l
State of Vemont bec:
RegionIDocketRoom(WithConcurrences)
RI:DEPOS RI:D POS RI:DEPOS v R
eg Snyderg E h(
6/,M/A hf 3
fps >
8207070415 820625 PDR ADOCK 05000271 O
r PDR OFFICIAL RECORD COPY l
m
~
VERMONT Y AN KEE NUCLEAR POWER CORPORATION SEVENTY SEVEN GROVE STREET 2.C.2.1 RuTLAxo, Vensosr osvol PvY 82-70 REPLY TO:
ENGINEERING OFFICE 1671 WORCESTER ROAD FR A MING H AM, M ass ACH USETTS 01701 TELEPHONE 617 872 8100 June 15, 1982 U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Pruss a, PA 19406 Attention:
George H. Smith, Director Division of Emergency Preparedness and Operational Support
References:
a)
License No. DPR-28 (Docket 50-271) b)
USNRC Letter to VYNPC, G.H. Smith to E.W. Jackson, dated April 28, 1982
Dear Sir:
Subject:
Emergency Preparedness - Augmentation Capabilities Reference (b) requested Vermont Yankee to perform a study to determine how the intent of the augmentation goals of NUREG 0654, Table B-1, can be achieved.
Subsequent to implementing our backshift call-in method, as required by Item 8 of Reference (b), notification drills were conducted to evaluate the effectiveness of our program.
Results from these tests generally indicate that sufficient staff augmentation can be achieved to meet the criteria specified in NUREG-0654, Table B-1.
The results from our three drills are shown on the attached Table 1.
Vermont Yankee is continuing to investigate other possible methods to facilitate the call-in procedure and result in earlier response times. Included in this investigation is a review of the assignment /
utilization of radio-activated pagers and a review of the capabilities of a new telephone system which is to be installed in the next 6-12 months.
We trust this information will be satisfactory for your review; however, should you have any questions or need further clarification of our position, please contact us.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION N
~ $5hhk b M
0 E. W Jac son Manager of Operations
TABLE 1 Backshift Augmentation Test Summary FUNCTION DEMONSTRATED RESPONSE
- DESCRIPTION 30 min 60 min Total Notification /
'3/1/1 6/7/2 9/8/3 Communication Sr. Mgr. EOF 2/1/1 0/0/1 2/1/2 Sr. HP Expertise 1/1/1 is0/0 2/1/1 off-site 3/5/2 4/2/5 7/7/7 Survey Team On-site Surveys 1/1/1 1/1/1 2/2/2 (out of plant)
In-plant Survey 1/1/1 1/1/1 2/2/2-Chem Techs 0/0/0 2/1/1 2/1/1 Core Thermal 1/1/1 2/0/0 3/1/1 Hydraulics Eng.
Electrical Eng.
0/1/0 1/0/1 1/1/1 Mechanical Eng.
0/0/0 2/1/1 2/1/1 0/1/0 0/3/1 0/4/1 Mechanical Maint.
Electrical Maint.
0/0/0 1/1/1 1/1/1 I & C Tech.
1/1/1 5/5/0 6/6/1 Radiation 1/1/0 3/3/4 4/4/4 Protection l
Radwaste Operator 0/0/0 7/4/1 7/4/1 TOTAL 14/15/9 36/29/20 50/44/29 4
i Additional Personnel responding within 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 8/28/28 i
- Drill Dates:
June 4, 5, and 7, 1982 l
NOTE: During the drill on 6/4/82, the Maintenance Department was not informed to implement their fanout procedure.