ML20054K711

From kanterella
Jump to navigation Jump to search
RO 287/82-08:on 820609,Region 2 Informed That 51 of 96 Thermal Shield Bolts Had 15% to 50% Eddy Current Indications.Rept Due 820623 But Investigation & Preparation of Rept Incomplete.Rept to Be Submitted by 820707
ML20054K711
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 06/23/1982
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
RO-287-82-08, RO-287-82-8, NUDOCS 8207060083
Download: ML20054K711 (2)


Text

m

..o, n

DUKE POWER COMPANY Powra Dust.nixo 422 Sourn Cuuacu Srazer, Cruumortz, N. C. ana4a v

,Z c::

,4 2

~\\O.

>u w Luau o. PAnnen.sn.

vice PatsiotNT Tttcpi.roset; Amt. 704 (TI s,t.

Paooveo=

June 23, 1982 373-aosM cp cp OO 3Z 3

2

'Mr. James P. O'Reilly, Regional Administrator p

U. S. St. clear Regulatory Commission CJ' Region II

~

101 Marietta' Street, Suite 3100 Atlanta, Georgia 30303 Re: Oconee Nuclear Station Docket No. 50-287

Dear Mr. O'Reilly:

On June 9, 1982 youroffice was informed that 51 of 96 thermal shield bolts had 15% to 50% eddy current indications. Upon removal of the retaining clips, 19 of the 27 bolts removed at that point were broken. This constitutes per-formance of components that requires remedial action to prevent operation in a manner less conservative than assumed in the accident analyses in the safety analysis report. Reportable Occurrence Report R0-287/82-08 providing details of this incident was to have been submitted to you by June 23, 1982, pursuant to Technical Specification 6.6.2.1.a(9).

However, the investigation of this incident and the preparation of a report are incomplete at this time.

It is expected that the investigation and. report will be completed, reviewed, and submitted to you no later than July 7, 1982.

Ve truly yours, a_---

h William O. Parker, Jr.

JFK/php cc: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. W. T. Orders imC Resident Inspector Oconee Nuclear Station Records Center Institute of Nuclear Power Operations 1820 Water Place Atlanta, Georgia 30339

,ggytetM.C0l'*

Q.. ei W 8207060083 820623 PDR ADOCK 05000287 S

PDR

^

)~

Mr. James P. O'Reilly, Regional Administrator June 23, 1982 Page 2 cc:

Mr. Philip C. Wagner Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 l

l l

l l

I 1

I