lE HQ F!i.E COPY
JUN 18 B?2
Docket No. 50-373
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the rcutine safety inspection conducted by Mr. D. E. Miller
of this office on May 26-27 and June 7-8, 1982, of activities at LaSalle
County Nuclear Station, Unit 1, authorized by NRC Operating License No. NPF-11
and to the discussion of our findings with Mr. Bishop and others at the con-
clusion of the inspection.
The inspection was an examination of activities conducted under your license
as they relate to radiation safety and to compliance with the Commission's
rules and regulations and with thc conditions of your license. The inspec-
tion consisted of a selective examination of procedures and representative
records, observations, independent measurements, and interviews with
personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
1
phone within ten (10) days from the date of this letter of your intention
l
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new duc date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
~I'>r48 :
f6o lo
8207020353 820618
PDR ADOCK 05000373
G
k
- - - - - - - -
.
.
)
Commonwealth Edison Company
2
JUN 181922
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the af fidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
Inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
J. R. Miller, Chief
Technical Inspection Branch
Enclosure:
Inspection Report
No. 50-373/82-29(DETP)
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
R. Cosaro, Site Construction
Superintendent
T. E. Quaka, Quality
Assurance Supervisor
R. H. Holyoak, Station
Superintendent
B. B. Stephenson, Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Karen Borgstadt, Office of