Amend 14 to License NPF-8,increasing Storage Capacity of Spent Fuel Pool from 675 to 1,407 Storage Locations
ML20054K403
Person / Time
Site: Farley 
Issue date: 06/23/1982
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20054K404 List:
References
TAC-47523, NUDOCS 8207020035
Download: ML20054K403 (4)


Text

f[

o,,

UNITED STATES y

3 p,

NUCLEAR REGULATORY COMMISSION j

W ASHINGTON, D. C. 20555

..... si' ALABAMA POWER COMPANY DOCKET N0. 50-364 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.14 License No. NPF-8 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Alabama Power Company (the licensee) dated December 18, 1981, supplemented by letters dated February 1, March 19, April 5, and April 21, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

8207020035 820623 PDR ADOCK 05000364 P

PDR m

2-2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF.3 is hereby amended to read as follows:

(2) Tecnnical Scecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.14, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

F0h, THE NUC EGULATCRY COMMISSION I

Y "g%c l

, Steven A.

arga, Chie Operating Reactors 3r ch #1 Division of Licensing \\

Attachment:

Changes to the Technical Specifications Date of Issuance: June 23,1982 l

l

ATTACHfENT TO LICENSE AMENDfTNT AMENDMENT NO.14 TO FACILITY OPERATING LICENSE NO. NPF-8 DOCKET NO. 50-3 64 Revise Appendix A as follows:

Remove Pages Insert Pages 5-7 5-7

(

9

DESIGN FEATURES 5.6 FUEL STORAGE CRITICALITY 5.6.1.1 The spent fuel storage racks are designed and shall be maintained with:

a. A Keff equivalent to less than or equal to 0.95 when flooded with unborated water, which includes conservative allowances for uncer-tainties and biases based on a maximum enrichment of 4.3 weight percent U-235.
b. A nominal 10.75 inch center-to-center distance between fuel assemblies placed in the storage racks.

5.6.1.2 The new fuel pit storage racks are designed and shall be maintained with a nominal 21 inch center-to-center distance between new fuel assemblies such that Keff will not exceed 0.98, based on a maximum enrichment of 3.5 weight percent U-235, assuming aqueous foam moderation.

i DRAINAGE 5.6.2 The spent fuel storage pool is designed and shall be maintained to prevent inadvertent draining of the pool below elevation 149.

CAPACITY 5.6.3 The spent fuel storage pool is designed and shall be maintained with a storage capacity limited to no more than 1407 fuel assemblies.

5.7 COMPONENT CYCLIC OR TRANSIENT LIMIT 5.7.1 The components identified in Table 5.7-1 are designed and shall be maintained within the cyclic or transient limits of Table 5.7-1.

1 FARLEY-UNIT 2 5-7 Amendment No.14 t

.