ML20054K233

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-335/82-01 & 50-389/82-01 on 820309-12 & Notice of Violation
ML20054K233
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/06/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML20054K218 List:
References
NUDOCS 8207010320
Download: ML20054K233 (2)


See also: IR 05000335/1982001

Text

. .

-

< .

. .

yg. w

a

.

APR 0 6 1982

Florida Power and Light Company

ATTN: Dr. R. E. Uhrig, Vice President

Advanced Systems and Technology

P. O. Box 529100

Miami, FL 33152

i Gentlemen:

Subject: Report No 35/82hnd50-389/82-01

This refers to the routine safety inspection conducted by Mr. J. J. Lenahan

of this office on March 9-12, 1982, of activities authorized by NRC Operating

License No. OPR-67 and Construction Permit No. CPPR-144 for the St. Lucie

facility. Our preliminary findings were discussed with Mr. C. M. Wethy, Plant

Manager, at the conclusion of the inspection

,

Areas examined during the inspection and our findings are discussed in th'e

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A. Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

i

s

8207010320 820622

PDR ADOCK 05000335

0 PDR

- . - , .

. - . - - - . . . - - - - . - . . . . - . - - . . - _ . - - - .-. . . . . - . - - . .

~ .- , ,

Florida Power and Light Co. 2

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,
F. J. Long, Acting Chief

Reactor Projects Branch 2

! Division of Project and

'

Resident Programs

'

Enclosures:

1. Appendix A, Notice of Violation

2. Inspection Report Nos. 50-335/82-01

.

and 50-389/82-01

I

l CC W/ encl

l C. M. Wethy, Plant Manager

N. Weems, Assistant QA

. Construction Manager

!

B. J. Escue, Plant Manager -

,

'

bcc w/ enc 1:

, Document Management Branch

i State of Florida

l NRC Resident Inspector

i

'

1

!

I

RIM '

RII RII RI RI

!

p

JJLenahan:es TEConlon

htrdt KD

s

is FJ

,

d'*'-

/82 h/ /82

'

82

i 4"TI/02- /t

l

,

+Neu s'k)v