APPENDIX A NOTICE OF DEVIATION Carolina Power and Light Company Docket Nos. 50-400 & 50-401 Shearon Harris 1 and 2 License Nos. CPPR-158 & CPPR-159 Based on the NRC inspection conducted April 13-16, 1982, certain of your acti-vities appear to deviate from your commitments to the Commission as indicated below.
PSAR Section 1.8.6.(2) states that periodic inspection and tests at the site on the fire protection program will be prescribed by documented instruc-tions, procedures and drawings and will be accomplished in accordance with these documents. These instructions for the storage and preventative main-tenance of the fire protection equipment are included in licensee's proce-dures PGD-001 (AP-XIII-05), Material and Equipment Storage Requirements and PGD-002 (AP-XIII-07) Materials Maintenance Requirements During Storage.
Contrary to the above, en April 16, 1982, portions of the fire protection equipment were not stored and maintained in accordance with procedures PGD-001 and PGD-002. The following are examples of this discrepancy:
1.
Fire pump unit was stored outside and pump internals were not protected against entrance of water and airborne debris as required by PGD-001.
2.
Shaft of fire pump unit was not being rotated periodically as required by PGD-002.
3.
Batteries for diesel engine fire pump driver were stored outside and not inside a Class B warehouse as required by PGD-001.
4.
Fire protaction sectional control valves were stored outside with the valve internal not protected from airborne contaminants as required by PGD-001.
5.
Bolts for tha fire protection valve assemblies were stored outside without a rust preventer as required by PGD-001.
8207010308 0