Forwards IE Insp Rept 50-333/82-10 on 820501-31 & Notice of Violation
ML20054J695
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/14/1982
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20054J696 List:
References
NUDOCS 8206290458
Download: ML20054J695 (2)


See also: IR 05000333/1982010

Text

,

.

.

DocLet tio. 50-333

3gg y 4 gggg

Power Authority of the State of New York

James A. FitzPatrick Nuclear Povier Plant

ATTH: !!r. Corbin A. McNeill, Jr.

Resident !!anager

P. O. Box 41

Lycoming,f;cv York

13093

Genticmen:

Subject:

Inspection 50-333/82-10

This refers to the routine, safety insocction conducted by !!r. J. Linville of

this office on I ay 1-31, 1932, at the J. A. FitzPatrick Nuclear Power Plant,

,

Scriba,f;cv York of activitics authorized by fiRC License No. OPR-59 and to the

'

discussions of our findings held by fir. Linville with yourself and other rcmbers

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. h'ithin those areas, the inspection

consisted of selective exaninations of procedures and representative records,

intervictis with personnel, and observations by the inspector.

Our inspector also verified the steps you had taken to correct tbc violation

,

brought to your attention in a letter dated !! arch 2,1S32, and the violation

brought to your attention in a letter dated December 16, 1951, and violation C

brought to your attention in a letter dated January 20, 1932. L'c have no further

questions regarding your action at this time.

Based on the results of this inspection, it appears that certain of your activities

t:cre not conducted in full compliance with HRC requirements as set forth in the

'

Notice of Violation, enclosed herewith as Appendix A.

These violations have been

cateqorized by severity level in accordance with the NRC Enforcenent policy.

(10 CFR 2, Appendix C) published in the Federal Register Notice (47 FR 9987) dated

i; arch 9,1932. You are required to respond to this letter and in preparing your

response, you should follow the instructions in Appendix A.

The responses directed by this letter and the. accompanying Notice are not subject

to the clearance procedures of the Office of !!anapenent and Budget as required by

the Paperwork Reduction Act of 1930 PL 96-511.

s

0FFICIAL RECORD COPY

B206290458

{DRADOCKO

-

-

-

333

PDR

.

. _ _ _ _

.

.

Pouer Authority of the State

2

JUN 141982

of New York

Itcn A in the ':otice of Violation enclosed with this letter was identified

durino a previous inspection of your licensed activities on September 8-11, 1950,

and ras doctrmnted in the enclosure to our letter dated October 1,1980.

Your

letter to this office dated October 28, 1950 stated that continued emphasis uculd

Le placed on this area in training and that increased surervisory tours eculd te

ccnducted. fro, our :':y 1-31,19f.2 inspection, it appears that the stated

corrective acticas w rc not effective since this item has recurred.

P.ecurrent

and uncurrected violations are given cdditional weight in the consideration and

s

selection of appropriate enforce'1cnt action. Therefore, in your response to this t

letter, you should nive particular attention to those actions taken or planned to

cnsure that identified violations will be completely corrected and will not recur.

In accordance with 10 CFR 2.790(a), c copy of this letter and the enclosures will

be nieced in the NRC Public Document ".0c? unless you notify this office, by

telenhnne, within ten dcys of the date of this letter and subnit tritten anolication

to uithhnid inforrstion contained therein within thirty days of the date of this

letter.

Such nrplicction rust le consistent uith the rcquirrents of ?.790(b)(1).

The talcrhonc notificaticn of your intent to request withholding, or any request

for en exttrsion of the 10 day p;riod unich you belicve necessary, should be naJc

to the Supervisor, Files, !; ail and Records, US::RC Region I, at (215) 337-5223.

Your cooperation with us in this ratter is appreciated.

Sincerely,

/

Origina1 Signed By:

-

d

' Aichard W. Starostocki, D rector,

Division of Project and Resident

.

Prograr*

Enclosures:

1.

Appendix A, Motice of Violation

2.

l.RC Recion I Insnection P.cport

Munber 53-333/82-OL

cc u/ encl:

L. H. Sir; clair, President and Chief Operating Officer

J. P. Pavne, Tenior Vice President 'luclear Generation

t. Mlansr .nn, Vice President-Puality Assurance

". C. re rrove, nuclity Assurance Superintendent

J. F. Davis, C'airmn, Safety r.eview Com.ittee

C. '!. Prctt, 7.ssist?nt %narel Counsel

Public rocu"ent r.cen (PP?.)

Local Public Dccunent Roo" (LPDP.)

$

hk

Mucitar Safcty Infor.naticn Center (H5IC)

I:DPFP:fJB

RI:DPRP:HBK

r

nr.C Rasident Inspector

State of tieu York

kh I

ie

bec w/ enc 1:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

,

OHICIAL RECORD C0FY

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .