Appendix l
I NOTICE OF VIOLATION As a result of the inspection conducted on April 19-23, 27-30, ?!ay 6, 7, 11, 13-18 and 21, 1982, and in accordance with the NRC Enforcement Policy, 47 FR 9987 (t! arch 9, 1982), the following violation was identified:
Technical Specification, Section 6.2.A.7 requires that written procedures including applicable checkoff lists for surveillance and testing be prepared, approved and adhered to.
Preoperational test procedure PT-PC-101, Revision 24, required the primary containment integrated leak rate test be conducted in accordance with surveillance procedure LTS 300-4.
LTS 300-4 requires that drywell equipment sump discharge isolation valves 1 RE 024 and 025 be closed during the performance of the CILRT.
Contrary to the above, the control switches were 1cft in the auto position causing the valves to open and approximately 83 gallons were pumped out of the primary containment during the performance of the CILRT on ?!ay 17, 1982.
This is a Severity Level V violatiin (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written state-ment or explanation in reply, including for each item of noncompliance:
(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full com-pliance will be achieved. Consideration may be given to extending your response time for good cause shown.
't 1/u M /e a M k b Datell '
W. S.'Litlle, Chief i
Engineering Inspection Branch 8206290309 820609 PDR ADOCK 05000373 G