FJUN 1 5 1982
.
Docket No. 50-346
Toledo Edison Company
ATIN:
Mr. Richard P. Crouse
Vice President
Nuclear
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
.
Gentlemen:
This refers to the routine safety inspection conducted by Mr. K. Connaughton
of this office on May 3-14, 1982, of activities at Davis - Besse Nuclear
Power Plant, Unit 1, authorized by NRC Operating License No. NPF-3 and to
the discussion of our findings with T. Murray and others of your staff at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information-
that you (or your contractors) believe to be exempt from disclosure under
10 CFR -9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
I
l
l
i
8206290206 820615
hkg/
PDR ADOCK 05000346
G
j
.
.
IJUN 1 5 22
Toledo Edison Company
2
This section further requires the statement to address witn specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter vill be placed in the Public Document
Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
N-
s
W. S. Little, Chief
Engineering Inspection Branch
Enclosures:
1.
Appendix,
2.
Inspection Report
No. 50-346/82-15
cc w/encls:
T. D. Murray, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Harold W. Kohn, Power Siting
Commission
Helen W. Evans, State of Ohio
Robert M. Quillin, Ohio
Department of Health
f
RIII
RIII
RI
C n up,h n/dm
afe */ Litte(f
Regygv
6/
1
-
,
(, '
k
u,\\