Forwards IE Insp Rept 50-346/82-15 on 820503-14 & Notice of Violation
ML20054J539
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/15/1982
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20054J540 List:
References
NUDOCS 8206290206
Download: ML20054J539 (2)


See also: IR 05000346/1982015

Text

- -

.

.,-

FJUN 1 5 1982

. Docket No. 50-346

Toledo Edison Company

ATIN: Mr. Richard P. Crouse

Vice President

Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

.

Gentlemen:

This refers to the routine safety inspection conducted by Mr. K. Connaughton

of this office on May 3-14, 1982, of activities at Davis - Besse Nuclear

Power Plant, Unit 1, authorized by NRC Operating License No. NPF-3 and to

the discussion of our findings with T. Murray and others of your staff at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room. If this report contains any information-

that you (or your contractors) believe to be exempt from disclosure under

10 CFR -9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information. If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

I

l

l

i

8206290206 820615

j G

PDR ADOCK 05000346

PDR hkg/

.

.

Toledo Edison Company 2 IJUN 1 5 22

This section further requires the statement to address witn specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosures,

and your response to this letter vill be placed in the Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

N- s

W. S. Little, Chief

Engineering Inspection Branch

Enclosures:

1. Appendix,

. Notice of Violation

2. Inspection Report

No. 50-346/82-15

cc w/encls:

T. D. Murray, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Power Siting

Commission

Helen W. Evans, State of Ohio

Robert M. Quillin, Ohio

Department of Health

f

RIII RIII RI

C n up,h n/dm afe

Regygv

6/ 1

-

,

  • / Litte(f (, '

k

u,\