ML20054J375
| ML20054J375 | |
| Person / Time | |
|---|---|
| Site: | 05000000, San Onofre |
| Issue date: | 02/27/1981 |
| From: | Bessette D Advisory Committee on Reactor Safeguards |
| To: | Zech G NRC |
| Shared Package | |
| ML20033C447 | List: |
| References | |
| FOIA-82-176 NUDOCS 8206280553 | |
| Download: ML20054J375 (7) | |
Text
r UNITED STATES g
o, P
NUCLEAR REGULATORY COMMISSION 5
- E ADVISORY COMMITTEE ON REACTOR SAFEGUARDS 1
wasmucrow. o.c.nossa February 27, 1981 Gary Zech AGENDA FOR THE ACRS SUBCOMMITTEE ON SAN ONOFRE 2&3 MEETING OF MARCH 11, 1981 1
Attached is the tentative agenda for the subject meeting. The meeting will be held on March 11,1981 from 1:30 pm until 7:45 pm, or until the conclusions of business.
Speakers should have 10 copies of all material used to support their presentations. The copies should be collated and distributed to the Subcommittee prior to the presentation. Let me know if you need further infonnation (202-634-3267).
- f. f. Q D. E. Bessette Nuclear Engineer
Attachment:
As Stated cc:
H. Rood M. W. Libarkin G. R. Quittschreiber l
8206280553 820512 PDR FOIA MCMURR A82-176 PDR
?
i Tentative Presentation Schedule ACRS Subcommittee on San Onofre 2&3 Washington, D.C.
March 11, 1981 Organization /
Presentation Approximate Speaker Time Time 1.
Opening Remarks by the Subcommittee 5 min 1:30 pm Chairman 2.
NRC Staff Presentation 2.1 Introduction 5 mi n 1:35 pm
- Plant schedule / staffing requirements 2.2 Standards for Operator 10 min 1:40 pm Training, including Simulators 2.3 Management Evaluation 10 min 1:55 pm
' Assessment of the Independent Review Groups, their charter, and how they interrelate 2.4 Structural Evaluation 10 min 2:10 pm
' Structural audit, comparison with Diablo Canyon review
' Safety factors for containment stress levels 2.5 Systems Interactions Evaluation 10 min 2:25 pm
' Comparison with Zion, Indian Point and Diablo Canyon l
- Review group conclusions 2.6 Application of NUREG-0660 10 min 2:40 pm Transients and Accidents Break 10 min 2:55 pm.
~~
- 1
~.
Tentative Presentation Schedule ACRS Subcommittee on San Onofre 2&3 Washington, D.C.
March 11, 1981 q
Organization /
Presentation Approximate Speaker Time Time 3.
Applicant Presentation 3.1 Introduction SCE/W. Moody 5 min 3:05 pm 3.2 Training & Human 60 min 3:10 pm Engi neering Training staff qualifications Course content Feedback of operating experience Control layouts, including outside the control room l
Safety Panel Display System, basis for selection of l
parameters to be displayed Simulator program Operating procedures Use of process computer; how accident procedures are related to symptoms Lockout and tag-out procedures l
3.3 Emergency Planning - relationship 5 min 4:40 pm l
between SCE and government agenices 3.4 Offsite Power Reliability 5 min 4:50 pm 3.5 D.C. Power Reliability 10 min 5:00 pm Consequences of loss of DC power 1
1 Break 10 min 5:15 pm l
l l
1
~
3-t Tentative Presentation Schedule ACRS Subcommittee on San Onofre 2&3 Washington, D.C.
March 11,1981 Organization /
Presentation Approximate Speaker Time Time 3.6 TMI related issues 25 min 5:25 pm Reactor vessel vent-procedures for use Capability to depressurize under accident conditions Air cleaning system cap-abilities, including control room intake Implementation of Regulatory Guide 1.97 Provisions for sampling in the the event of an accident, and capability to interpret infor-mation Reactor Vessel Level Indicator resolution Relief valve test program 3.7 ALARA Program 10 min 6:05 pm 3.8 Systems Interactions Review 10 min 6:20 pm Air system 3.9 Structural / Seismic Audit 10 min 6:35 pm 3.10 Provisions to Prevent Water 5 min 6:50 pm Hammer 3.11 Capability of Pump Seals to 5 min 7:00 pm Sustain Loss of Component Cooling.
How Criteria Were Selected and Why They are Adequate.
~
Tentative Presentation Schedule ACRS Subcommittee on San Onofre 2&3 Washington, D.C.
March 11,1981 Organization /
Presentation Approximate Speaker Time Time 3.12 Industrial Security (Closed) 15 min 7:10 pm 3.13 Applicant's Concluding Remarks 5 min 7:30 pm 4.
Executive Session 10 min 7:35 pm Adjournment 7:45 pm 1
l
t Tentative Presentation Schedule ACRS Full Committee Meeting on San Onofre 283 Washington, D.C.
March 12,1981 Organization /
Presentation Approximate Speaker Time Time 1.
Report by the San Onofre 15 min 1:00 pm Subcommittee Chairman
- Report by the Electrical Systems Subcommittee Chairman on the Computerized Protection System 2.
Staff Presentation 2.1 Summary and Schedule 10 min 1:15 pm 2.2 Open Items - plans and 15 min 1:25 pm schedule for resolution
- Comparison of ANO-2 Design with San Onofre 2&3 3.
Applicant Presentation 3.1 Introduction 5 min 1:50 pm
- Response to NRC Staffs Positions on Open Items
- 3. 2 Staffing and Training 25 min 1:55 pm
- 0rganizational Capabilities
- Training Program
'Use of INPO 15 min 2:35 pm 3.3 Human Engineering
- 0perating Procedures 3.4 Hydrogen Control & Capabilities 10 min 3:00 pm,
' Survivability of Essential Equipment 10 min 3:15 pm Break
Tentative Presentation Schedule ACRS Full Committee Meeting on San Onofre 283 Washington, D.C.
March 12,1981 Organization /
Presentation Approximate Speaker Time Time 3.5 Natural Circulation Capability 10 min 3:25 pm 3.6 Secondary System Chemistry and Materials 10 min 3:40 pm 3.7 Seismic / Structural Audit 10 min 3:55 pm 3.8 Capability to Withstand Station Blackout 7 min 4:10 pm 3.9 Dnergency Planning 7 min 4:20 pm 3.10 Carry-over Items 7 min 4:30 pm 3.11 Industrial Security 7 min 4:40 pm 3.12 Concluding Remarks 5 min 4:50 pm 4.
Executive Session 5 min 4:55 pm Adjournment of San Onofre 5:00 pm Discussions l
l t
i