ML20054H902

From kanterella
Jump to navigation Jump to search
Forwards IE Safeguards Insp Rept 70-1113/82-11 on 820503-07. No Noncompliance Noted
ML20054H902
Person / Time
Site: 07001113
Issue date: 06/02/1982
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Long J
GENERAL ELECTRIC CO.
Shared Package
ML20054H903 List:
References
NUDOCS 8206250160
Download: ML20054H902 (3)


Text

-

f

^?

Cu) n.....

ppmwa 2no nowwon t

JUN 2 1982 General Electric Company ATTN:

Mr. J. A. Long, General Manager Wilmington Manufacturing Department P. O. Box 780 -

Wilmington, NC 28402 Gentlemen:

Subject:

Report No. 70-1113/82-11 This refers to the routine safeguards inspection conducted by Mr. J. W. Bates of this office on May 3-7, 1982, of activities authorized by NRC License No. SNM-1097 at General Electric Company, Wilmington Manufacturing Division and to the discussions of our findings held with Mr. C. M. Vaughan, Manager, Licensing and Nuclear Materials Management Unit, at the conclusion of the inspection.

Areas examined during this inspection included your program for nuclear material control and accountability under the applicable provisions of Title 10, Code of Federal Regulations, Part 70, "Special Nuclear Material," and specific license conditions. Within these areas, the inspection consisted of selective examina-tions of procedures and representative records, interviews with personnel, performance tests, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified enforcement matters and unresolved items. The status of these items is discussed in the enclosed report.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, activities involving safeguards and security measures are exempt from public disclosure; therefore, the enclosed report with the exception of the cover page, which is an inspection summary, will not be placed in the Public Dccument Room.

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely, A. F. Gibson, Chief Technical Inspection Branch Division of Engineering and Technical Programs

Enclosures:

See Page 2

. g "yya M *IQhW W' 8206250160 920602 PDR ADOCK 07001

mAtuiA annu.t taANSAAlffED HEDtWUh am -=

General Electric Company 2

  • N 21982

Enclosures:

1.

Inspection Report No. 70-1115/82-11 (Exempt from Disclosure) 2.

Inspection Summary (Not Exempt) cc w/ encl:

C. M. Vaughan, Manager Licensing and Nuclear Materials Management Unit bec w/o encl:

License Fee Management Branch bec w/ Inspection Summary:

State of North Carolina bec w/ encl:

Document Management Branch Chief of Safeguards Branch, DSRSI Chief, MC&A, Licensing Branch, NMSS I

RU RII R I.

RII /

j)Wf j

^

U 3JWBates:ht GU o. p y EJM Alpine FG bson 6/N82-6/2 /82 6/N82

/p82 -

.e ffh s"

-