,_

(

l-NINE MILE POINT NUCLEAR STATION EMERGENCY PROCEDURES PROCEDURE UO. EPP-ll REVIEW AND REVISIONS OF SITE EMERGENCY PLAN AND PROCEDURES DATE AND INITIALS APPROVALS SICSATURES REVISION 9 REVISION 10 REVISION 11 Chemistry & Radiation Management Superintendent ydgg E. W. Leach

_ C. s/,

4 Af Station Superintenden NNPNS T. W. Roman

~//r/k?-

if

/yi General Superintendent

(>

gggp Nuclear Generation Chair 1 nan of S.O.R.C. [ [, [ M N Id T. J. Perkins (l

l Summary of Pages l

Revision 9, dated May 1982, consists of pages 1,1-41 and is a general revision.

l l

_ NIAGARA MOHAWK POWER CORPORATION 1

l l

THIS PROCEDURE NOT TO BE I

USED AFTER SUBJECT TO PERIODIC REVIEW.

1 i

INFORMFION ONLY O206240026 820618 fDRADOCK 05000220 PDR

(

EPP-ll REVIEW AND REVISIONS OF SITE EMERGENCY PLAN AND PROCEDURES Section Cbntents Page 1.0 PURPOSE 1

2.0 REFERENCES

1 3.0 RESPONSIBILIIT 1

4.0 PROCEDURE 1

4.1 Independent Review 1

4.2 Site Review and Updating 2

4.2.2 Communication Check 2

4.2.3 Qualified Personnel Lists 3

4.2.4 Racertification 4

Attachment l_

Communications Checklist Letters of Agreement / Procedure g

Checklist 5

/

List of Trained Personnel for Emergency Staffing 13 O

EPP-11 -i May 1982

l EPP-ll REVIEW AND REVISION OF SITE EMERGENCY PLAN AND PROCEDURES

)

1.0 PURPOSE The purpose of this procedure is to ensure that the Site Emergency Plan and Procedures receive a periodic review and are revised as necessary.

2.0 REFERENCES

2.1 APNal, Procedure for Administrative Control 2.2 APN-5, Procedure for Control of Procedures, Instructions Orders and Drawings 2.3 EPP-10, Emergency Equipment Inventories & Checklist 2.4 NUREG-0654/ FEMA-REP-1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants 3.0 RESPONSIBILITY The Emergency Planning Coordinator is responsible for the development t

and updating of the Site Emergency Plan and Procedures and for coordinating these plans with other response organizations whose plans and/or procedures may be included in the plan.

4.0 PROCEDURE 4.1 Independent Review 4.1.1 Annually an independent review and audit of the Emergency Preparedness Program will be conducted by members of the Niagara Mohawk Power Corporation Safety Review and Audit Board (SRAB).

a.

The review shall include the emergency plan, its implementing procedures and practices, training, readiness testing, equipment and interfaces with State and Local governments.

b.

The result of the

review, along with recommendations for improvements, shall be documented, reported to the Emergency Planning Coordinator and the General Superintendent Nuclear 9

Generation for evaluation

and, if necessary, corrective actions.-

In

addition, this review and its associated recommendation shall also be made available upon request to involved Federal, State and local organizations.

(d, i

EPP-ll

-1 May 1982

i 4.1.1 Continued c.

Management controls shall be implemented for evaluation and correction of review findings.

l d.

The audit documentation will be retained on file for a period of five years.

4.2 Site Review and Updating 4.2.1 Annually the Site Emergency Plan and Procedures shall be reviewed and updated in accordance with APN-1 by the Emergency Planning Coordinator.

a.

This update shall take into account changes identified by audits, drills, exercises and contacts with outside emergency response agencies.

b.

In addition, any member of the station operating staff who feels that the Site Emergency Plan and Procedures need revision should direct their suggested reridions to the Emergency Planning Coordinator.

4.2.2 Communication Check a.

Quarterly the individuals and agencies listed in Attachment I will be contacted to ensure that telephone numbers and names of responsible individuals are current.

A copy of the current' 9

plant telephone list will be attached to Attachment 1 and distributed to designated working copies.

Any additions or deletions to preserve the list's accuracy will be made as necessary and is not subject to SORC review.

b.

Each time a staff member whose phone number is listed in the procedure changes phone numbers, he should contact the Emergency._

Planning Coordinator so that the change can be initiated.

Changes in telephone numbers of personnel will be written into,

the designated working copies.

These' changes do not require SORC review.

c.

As part of the communications check the persons signing agency letters of agreement will be verified as being the responsible individual in their organization.

In the event of a change in the responsible individual, a new letter of agreement will be obtained to verify continued cooperation with the referenced agency.

As a minimum all letters of agreement will be updated 9

at least every two years.

d, In addition, as part of the Communication Check the referenced agencies whose plans and/or procedures may be included in the Site Emergency Plans and Procedures will be requested to provide any revisions which they may have made to these documents.

This fg will ensure appropriate revisions may also be made to the Site M/

Emergency Plan and Procedures.

EPP-11

-2 May 1982 l

s 4.2.2 Continued I

e.

Designated Emergency Plan and/or Procedure Working Copies The following copies of the Emergency Plan and/or Implementing j

Procedures (as required by the appropriate EPP-10 Inventory Check List) shall be maintained by the Emergency Planning Coordinator in addition to the NMP Control Room Master Copy:

Ambulance and Fire Kit Technical Support Center Offsite EOF Emergency Kit Operations Kit Nearsite EOF Emergency Kit Operations Support Center Inplant Survey Kits Operations Kit Downwind Survey Kit (A)

Nearsite Emergency Operations Downwind Survey Kit (B)

Facility Operations Kit Emergency Vehicles Inventory Alternate Emergency Operations Offsite. Dose Estimator Facility Operations Kit I

4 Cabinet Kits NMP Unit #2 Emergency Kit Rescue Cabinet Kit Emergency TLD's First Aid Supplies Decontamination Kits Decontamination Kits Oswego Hospital Nuclear Emergency Emergency Communications Kit Control Room Emergency Contaminated Patient Carrier Procedures Checklist Binder and Checklist Bin These copies of the Plan and Procedures (or of individual procedures, as required to be in each kit) will be kept current u

by making " pen and ink" changes in accordance with APN-5, as

" working copies".

4.2.3 Qualified Personnel Lists

a. contains a list of qualified personnel trained to perform the various functions indicated in the Site Emergency Plan.

This list contains the individuals name, department, and date trained.

Organization of the list is in terms of functional groups and order of succession to a position.

b.

The responsibility for qualifying these individuals to perform their respective emergency functions lies with the Training Department.

Once qualifications have been completed, the g

Training Department will ' notify the Emergency Planning Coordinator via written memorandum.

The responsibility for maintaining Attachment 2

current lies with the Emergency Planning Coordinator.

Updates supplied by the Training Department will be incorporated into the list as appropriate.

In addition, a quarterly check will be performed to verify the accuracy of the list.

Any additions or deletions to preserve the list's accuracy will be made in accordance with APN-5, as

" working copies" and is not subject to SORC review.

c.

All updates to Attachment 2 will be placed in all Emergency Operations Center assignment binders and Emergency Plan working O

copies (see 4.2.2e).

EPP-ll

-3 May 1982

4.2.4 Recertifica~ tion a.

Annually, the status of the Plan will be published under the direction of the Emergency Planning Coordinator, submitted to SORC for approval, and distributed to official copy holders.

b.

The published status shall include a listing of changes made since the previous publication.

If no revisions have been issued, this will be stated.

c.

Any revised pages will be dated and marked to show where and when changes have been made.

4 6

O l

i l

f O.

EPP-ll

-4 May 1982

(-

[

EPP-ll, ATTACHMENT 1

()

l Cbesunications Checklist Letters of Agreement / Procedure Checklist NMPC Emergency Personnel Responsible Procedure Verified Individual / Agency Phone #

  1. 0K Person OK OK By/Date J. C. Aldrich, Oper. Supv.

(See J. Blasiak, Asst. Supv.

Note Chem. & Rad. Prot.

Below)

Frank Burke, Fire Prot.

Supv. Unit #2 NMP Unit #1 - Office Home Phone R. Burtch R. Coon, NMP Unit il I&C Supv.

.K. A. Dahlberg, Maint. Supt.

W. C. Drews, Tech. Supt.

J. Duell, Chem & Rad Prot. Supv.

Home Camp H. Flanagan, Environ. Coord.

()

T. Kurtz, Asst. Supv.

Chem. & Rad. Prot.

E. W. Leach, Chem. & Rad.

Prot. Supt.

T. E. Lempges -

Office Home D. Palmer, QC Ops. Supv.

T. J. Perkins, Gen. Supt.

John Ptak, NMP Unit #2 Office NMPC Home Robert Raymond, Fire Prot.

Supv. Unit #1 Office Home T. W. Roman, NMP Unit #1 Supt.

Robert Smith, Site Rx Analyst Supv.

Roland Smith, NMP Unit #2 Supt.

J. Spadafore, Tech. Serv.

-)

Supt.

/

B. Taylor, Site I&C Supt.

NOTE: Telephone numbers in controlled copies only.

EPP-11

-5 May 1982

I 1

EPP-il, ATTACHMENT 1 (Cont.)

hl Communications Checklist Letters of Agreement / Procedure Checklist NMPC Emergency Personnel Responsible Procedura Verified Individual / Agency Phone #

  1. 0K Person OK OK By/Date (See

~ ~ ~

V. Uperaft, NMP Safety Supv.

Note P. Volza, Emerg Plan. Co'ord.

Below)

S. Wilczek, Syracuse Engineering Office

)

Home

)

NMPC Public Relations On-Call List Attach Current List - Check All #'s NMPC Engineering TSC Staff On-Call List

']

Attach Current List - Check All #'s

~~

,}

e i-.

1

1..

NOTE: Telephone numbers in controlled copies only.

(D s.;

EPP-ll

-6 May 1982

E 4

(.

EPP-11, ATTACHMENT 1 (Cont.)

Communications Checklist Letters of Agreement / Procedure Checklist Energency Response Facilities Verified Facility Phone #

  1. OK By/Date --

Emergency Operations Facility (EOF)

Hotline from TSC and Corp. EOC***,

(See Note Below)

'~

~ '

EOF Document Control Emergency Operations C. enter (Corporate) Hotline from TSC' and EOF ***,

Emergency News Center i

Environmental Lab (JAF/NMPC) i, Fire School (NMPC)

First Aid Room Locker Room (Assembly Area)

Lunch Room, Admin. Bldg. El. 277' (Accountability Area)

{}

Operations Support Center (OSC)

Hotline from TSC***,

Technical Support Center (TSC)

Hotline from OSC, EOF, Corp EOC***,

Volney Service Center NOTE: Telephone numbers.in controlled copies only.

O EPP-ll

-7 May 1982

h_

EPP-ll, ATTACHMENT 1 (Cont.)

O~

Communications Checklist Letters of Agreement / Procedure Checklist Offsite/ Contractor Emergency Support Responsible Procedure Verified Agency / Individual Phone f POK Person OK OK By/Date

( **

Alcan Fire Dept.

Cheif Kevin Battelle Below)

American Nuclear Ins.

Coast Guard-Buffalo Commander, AD Rosebrook Coast Guard-Oswego Officer In Charge, James Wilson Ecological Analysts (Emerg.

Environmental Sample Collection)

Oswego Office day night -(ma' nager)

~ (t echnician)

Corporate Office-day

(

night -(Project Mgr)

( Alt. Project Mgr)

(])

GE BWR Emerg. Supp. Prog.

Dr. Gerald Holzwasser INPO Emerg. Support - ~ ~

J.A.F.N.P.P. Control Room J.A.F.N.P.P. TSC J.A.F.N.P.P. Environmental Lab

~~

National Weather Service Meteorologist In Charge -

Daniel Bartholf NYS Dept. of Health Radiological Emergency Preparedness Group Larry Czech Office NYS Warning Point Alternate NYS Warning Point NMPC Power Control or Dr. David O'Brien Office Home

()

Alternate Summer #

NOTE: Telephone numbers in controlled copies only.

EPP-11

-8 May 1982

L EPP-11, ATTACHMENT 1 (Cont.)

Communications Checklist Letters of Agreement / Procedure Checklist Offsite/ Contractor Emergency Support Responsible Procedure Verified Agency / Individual Phone #

  1. 0K Person OK OK By/Date.

Oswego County EOC RECS Hotline or ***

George Brower -

Oswego County Fire (See Note Control Below)

Oswego County Sheriff -

l Ray Miller Oswego County Warning Point RECS Hotline or***

-- Oswego Fire ' Dept.

Chief Donald Beauchene Oswego Hospital Hospital Administrator,-

Corte J. Spencer Radiation Management Corp.

(Emerg. Environ. Sample -Analysis)

- day (Project Mgr)

- night (Recording with-

  1. to call)

(Emerg. Medical Assis - -

tance)

Rochester Gas & Electric 1:orp.

(Corp. Headquarters)

(Ginna Nuclear Station)~

Scriba Fire Dept.

President Robin Hemple Chief John Martin (Fire Control)

(Fire Hall)

Stone & Webster Engineering Corp.

- NMP Unit #2 Office (R.L. Wagner)

-NMP - Unit- #2 - Safety -

- NMP Unit #2 Security U.S. Dept.of Energy RAP / IRA?

David Schweller Upstate Medical Center (S.U.N.Y.)

- V.P. Hosp. Af f.,

Thomas J. Campbell

- Emergency P.oom NOTE: Telephone numbers in controlled copies only.

rep _11

_o yw loa 2

EPP-ll, ATTACHMENT 1 (Cont.)

(

Communications Checklist Letters of Agreement / Procedure Checklist l

Phone # Changes Required:

Responsible Person Changes Required:

l __ _

~

New Letters of Agreement Required:

L--

-' Person / Agency

- Letter Req.

Letter Rec.

Person / Agency Letter Req.

Letter Rec.

Person / Agency Letter Req.

Letter Rec.

Person indicated are the responsible individuals for their organizations who have signed letters of Agreement indicating their organization's willingness to assist or respond to an emergency at the Nine Mile Site.

OK checked means no new letter required.

Organization has emergency procedures relevant to site procedures.

l OK checked means no revisions have been made in previous quarter.

m

[

Hotlines are checked on a monthly basis as per EPP-10 (see Figure 18).

l Attach current plant phone list to this checklist.

I-~

Emergency Planning Coordinator Date

~ _.

L l

i l

O I

l l

EPP-11 -10 May 1982 l

/ 7 teoksess and holidays 4

Separate listangs for Wer2 and PASNY estems&ses are available frem asseptiemist Steam Station Operater -

PASNf Operater.

(hstside Cans.

'I Syresuse Operator.

Steno & Weteter Operater --

Abtett alehard E.

Gerber. Chan (13)

Park Centrel needing Thomasa. um.

Annett, u ard (see Genis. neger Tep ur. a m

/

Adams. Ten Note I'***** E "

Aldrich, John (34)

Godfrey Patti Pavel.' John Tauret. Ciady.

An sa. Cammie Be1ON)

Ge Wyth MLke Poesri. aan Temused. Eric Andersen. Andy GeeeetA. Geog Pearten. 381 Training Archives lafe. Canter Gaeriansmas Peelias. Tem Tustine a=8 Wmg Ama. Centrol asse Guardhesse 1ebby Parties. Ten (12)

II. 330 M ;

i Gussisial. T.

P='=d==*=. Jim 320 SE '

an the t, noch i

anna-**i. Osumy unnembesk. Ja Polymer SysAs q 320 W l nan, asporar lemrrisen. P at Perter. James

_ " _ 305 m '

sendia, mm. (n)

~

hemkaler, and Prosesbures Office 305larj aarnes, andmer Mamksley Fred Prusmal. Jedi 353

_.277 M ;

an; rett, herold Madrick. IILhe t>mlity Cameret

^

Beldsa. Eevia - -~

~ ~ " -

hommen. Danise and. Prot. Office (13) 277SE!

teHaus. Dumma heller. Mike and. Prot. Offine PAINT =

" 291 W i atammate. Isaryumme 8telas. Durid

- *. J00.1 a _.. -

alasiak. Jams Nelria. MLeheel and. Weste Cant. am 300 W l nemiti. Charlas memderosa. Osser and unste Duque Area

" 277 W l l

leerse. Jema andan, amb

. - - -". 2E 30 - __.. -.-._.

norte, nort

~ ~ ' ' '~ hapkins, n esy anyumed, ash ($$)

261 M,

asyle, lemrt arsigle. Tm 14C lanit #1 Task. Offiae Can 1stters 2M N marsca, men lastr. shup (Dirty) 2H 3EI nursak, menor laser. map Cass. an.

as s Mg at 340 st

  • DestineCable Spread-Cary, charles I

tastr. shop Sec. 31dg.

340 m iag asma t

_.upereft.. ween a _ _.- - -

Certar. Esria Jamme. mul

  • " sta sE i 1rrias. Tim
  • 290 SE Univ. Teottag Casuso. Emeda

" " 298 m i Castral Alarm Someta=

Jaarsky Mari vmG.M r, J. !

==

Cha ore.. u u m mista.,hylus Ea. J 2n -

vo u s. Pas sambogen, till, Chesalek. Tem r=1i====b. Cammie 261 Ier I Clark. Linda Eeny, lemry 237 SE Deather Tommer ' ---- -

Cele. Greg Eibbe Jebut 237 lar thele eser Commuter.

Co n tas. Iemak traksska. Jacquee i

237 Gemsd Colemt,tenke Erivia. Ela 2anctor Centrol WHess. Dom Eisrts. Tim anacter Physics W H 11ams, stihe' Cam, an. Data Lateratory (Ch e) as. Physics / Cent hs Winterhalt. 31.!

- ' ' ~f

~

CauP. Techs.

Lagos. Amt Ascopr4==tet setet meet. T.

Casamey. Pruk Lagee, leary Prem Records Storage ha Yablemskt, est!

Canf. ases.

Imack. Sd (42) asekie, aruse Zenitsch. E.

i Camen. D.

Lampges. Te (Syr) nelay amam Comme 117. ain lask.se. Gary (22) assults shop Camer. J.

ubrury aeyes Ms. Dave Duchner. M Cantret ames twe)

Liny. Casrt tu) nice. George Centret asam (JAF) nacher asas misse. Temy C8==sr. Jessi 1,rtie. Jacki aser. Steve Caek william imckreen (oM) ammma. Ten (16)

Caen. amb (24) stacVittie. Daunis amssiter. Eart Cerre11. C.

Benist. Shop mass. Diane Creada11. ternie stalmar. Ese aor. Vengha Crandall, not Neagene. Pas 1' Seemrity Crandall. Diane seemism. Jack (tM)

Schmen. Eric Criss,ikmard Mantelle. Ralph Scofield. Jena Dahlberg, Ein Martia. John Sceasert. Perry Daniels. Gary Master. herty (32)

Scream Hausse Dowy.an1 n..i= namas Seifrud. a.

NOTE: Telephone numbhrs Diana. Temy unttheiss. Den Sema p Plant m k. Jhe m Mammen. Dave (WF2)

Sgrei, asth in controlled l dim'**** **th8*Y leccartay, Fred Shes Jetmi (11) h ~---t C a trol copies only. j Dec. Cat. Cag.-as.

- - ~ " ~ McKimur. Pred shea. Eara lecianagedia. Eevia shel n ag. Geor p Dem po. Steve (11) pecsealty Julia She1 Hag. Imrotta Donegame. Larry leseham,terty S1111mma leal (14)

D'"*88"** Mih*

Noaham,8tary Slater. Jim Dooley. Mark Meehen. stLhe Smith. Arnett D m s. Bill leichaels, tierth Sai n. Den Drywell Air lack att n er. Carl (GE)

Smith Rahert

% ad.

ItLttag. William Smith. Roland thsell. Jim (23) learemski, Jahm Smith. Ten Duma, ad seester, asyne Saucy. Cliff Earls. J.W. (11)'

Noyer. George Spedafers. James Eastana a m e heller. Jena Stancliffe. M. (11)

Electricina sheP N ideos. Jim Sta. shift Sgt.

Energy Info. Ctr.

heney. Rich Scareroom Eartreamental Lab.

k rphy, Ed (11)

Stract. Vickie

/()T Palise. Itike N rray aan Stucky. Larry Pima. Sally Noss, arian S=eeney. P.

Pire Trailer Newson Clyde

$seet. Eau Pirst Aid Itield. D. (11)

Syre11. Tem Flanage. Ningh

  • lerris, ambert (15)

Teyler. anace Galasse. Salvatore

Iser1E. 2ett. D.

Tech. Sgt. Ctr.

Gardner. Staart NRC Trailer (S. b esen)

Telephone seen G m e, necki NaC Trailer (L. Deerfleia)

Tessier, assert Cavee. Ralph

j Paga 2 5/12/82 l

For Code Call Dial (4)

Xerox Key Operators:

and number in () after

3 name.

To answer, dial Connie Allen N'

Tanna Olin CONTRACTORS, TRAILERS FREQUENTLY CALLED SYR. EXT. _

Bartiert g,; ;;g Dini "B4", then ext.

JP Bell 3,1oy) i Constock Bernfeld, Dave Catalytic Desmond, Bill CPS Grinnel Fire Protection _ _. _ _ _ _

DiNatale, Carmen Gorman, Tom Gresock, Greg J8K Boiler Lynn, Bill l

NES Mearon, Bob

~

j NMPC Fire Tr.

Mosier, Mike 1

NRC X1256, Pasternak, Ray PAC Masonry Pracht, Don Randall Elec.

Seibert, Kay Training Tr.

Silvaggio, Dick Whitford, Bob 9

Wiltsie Const.

Wilczek, Stan Newport News Williams, Rich l

Employee Records O

Lempges, Tom i

l l

MISCELLANEOUS GENERAL ELECTRIC ALMA Building Lawrence, Wm.

(Training)

NMPC Fire School -

PASNY Ralph Traber or "7" and ext.

Stone & Webster -

or NMP ext.

Ken Sweet (Business) j Doc. Cat. Comp. Rm. -

l RCI -

~

Energy Info Ctr. -

Jeff Schaffer Bob Neff l

Gordon Taylor Bob Cowmeadow Telecopier - NMPC GE - Jack Kozek Walter Judd PASNY Pete Oehman Tom Gatta Rad Records -

John Vanderhof Bill Paget Syr.

Chen Nuclear -

b Automatic -

(Syr.)

Mitch Lanahan.

(Engineering - Syr.)

Tom Hancock Telecopier EOF.-

NOTE: Telephone numbers in controlled copies only.

EPP-ll

-12 May 1962

epi -11, ATTACHMENT 2 b

List of Qualified Personnel for Staffing Emergency Positions Table Of Contents TITLE PAGE I.

Technical Support Center (TSC) Positions Emergency Director Technical Data Coordinator & Staff Maintenance Coordinator Radiologic Assessment Coordinator & Staff Station Survey / Sample Team Coordinator Environmental' Survey / Sample Team Coordinator Reactor Physics Coordinator Instrumentation and Control Coordinator Public Information Coordinator Communications Coordinator & Staff Security Coordinator Headquarters Support Engineering Meteorological Advisor 5

II.

Control Room Positions

()

Control Room Advisors Operators III.

Operations Support Center (OSC) Positions Coordinators Radiological Monitoring Teams Damage Control Teams IV.

Emergency Operations Facility (EOF) Positions' Corporate Emergency Director / Recovery Manager Technical Liaison / Advisory Manager Security Director Administrative / Logistics Manager Scheduling / Planning Manager Emergency Director of Public Information Radiologic Assessment EOF Communicator and Staff O

~

TSC Positions O

Personnel trained for the position of Emergency Director, listed in order of preference:

Name Dept./ Agency Date Qualified T. J. Perkins Oper.

9/ 13 /81 T. Roman Oper.

9/13 /81 J. Aldrich Oper.

9/ 13/81 W. Drews Tech.

9/13 /81 The following are alternates listed in alphabetical order:

R. Abbott Oper.

9/13 /81 A. Andersen Oper.

9/13 /81 W. Bandla Oper.

9/13 /81 K. Belden Oper.

9/13/81 M. Colomb Oper.

9/13/81 K. Dahlberg Maint.

9/13/81 S. Domago Oper.

9/13 /81 E. Duda Oper.

9/ 13 /81 J. Earls Oper.

9/13 /81 R. Gayne Oper.

9/13/81

(-]9 T. Gurdziel Oper.

9/13/81 P. Harrison Tech. Services 9/13/81 M. Jones Tech. Services 9/13 /81 D. Matthews Oper.

9/ 13 /81 G. Moyer Oper.

9/13/Cl D. Neild Oper.

9/13/81 B. Ness Oper.

9/13 /81 J. Pavel Training 9/ 13/81 J. Poindexter Training 9/13 /81 K. Rossiter Oper.

J. Shea Oper.

9/13 /81 9/13/81 C. Shelling Oper.

9/ 13 /81 M. Silliman Tech. Services 9/13 /81 Roland Smith Unit #2 9/ 13 /81 J. Spadafore Tech. Services 9/13 /81 M. Stancliffe Oper.

9/13/81 D. Topley Oper.

9/13/81 l

W. Wambsgan Oper.

9/ 13 /81 T. Wood Oper.

9/ 13 /81 K. Zollitsch Training 9/13/81 T. E. Lempges V.P. - Syr.

9/13/81 O

EPP-11

-14 May 1982

TSC Positions (Cont.)

l' Personnel trained for the position of Technical Data Coordinator, listed

\\-

in order of preference:

Name Dept./Agenet Date Qualified W. Drews Tech.

9/13/81 J. Spadafore Tech. Services 9/13/81 M. Silliman Asst. for Nuc. Admin.

& Planning 9/ 13 /81 l

l l

l 1

I l

O Personnel trained for the Tech. Data Coordinators Staff:

Name Dept./ Agency Date Qualified R. Randall Tech. Supp.

9/13/81 0

J. Slater comp. Maint.

9/13 /81 P. Mangano Comp. Maint.

9/13/81 l

O EPP-11 -15 May 1982 I

f

,-l, TSC Positions (Cont.)

Personnel trained for the position of Maintenance Coordinator, listed in k

order of preference, unless otherwise stipulated via memorandum:

Name Dept./ Agency Date Qualified 9

K. Dahlberg Maintenance 9/13/81 M. Falise Maintenance 9/ 13 /81 O

()

EPP-11 -16 May 1982

TSC Positions (Cont.)

0 Personnel trained for the position of Radiologic Assessment Coordinator, v

listed in order of preference:

Name Dept./ Agency Date Qualified E. Leach Chem. & Rad. Protection 9/13/81 J. Duell Chem. & Rad. Protection 9/13/81 P. Volza Chem. & Rad. Protection 9/13 /81 O

Personnel trained for the Radiologic Assessment Staff:

N me Dept./ Agency Date Qualified a

J. Blasiak Chem. & Rad. Protection 9/13/81 J. Duell Chem. & Rad. Protection 9 / 13 /8 1 H. Flanagan Chem. & Rad. Protection 9/13/81 M. Hedrick Training 9/13/81 T. Kurtz Chem. & Rad. Protection 9/13/81 E. Leach Chem. & Rad. Protection 9/ 13/81 T. Peeling Training 9/13 /81 P. Volza Chem. & Rad. Protection 9/13/81 G. Burgess Oswego County Emerg.

Preparedness 9/ 13/81 O

EPP-11 -17 May 1982

TSC Positions (Cont.)

(*'.

Personnel trained for the position of Station Survey / Sample Team Coordinator, listed in order of preference:

Name Dept./ Agency Date Qualified J. Duell Chem. & Rad. Protection 9/13/81 T. Kurtz Chem. & Rad. Protection 9/13/81 9

J. Blasisk Chem. & Rad. Protection 9/13/81 O

I O

EPP-11

-18 May 1982 i

1

~

~

TSC Positions (Cont.)

f^\\

Personnel trained for the position of Environmental Survey / Sample Team i/

Coordinator, listed in order of preference:

Name Dept./ Agency Date Qualified H. Flanagan Chem. & Rad. Protection 9/13/81 9

T. Kurtz Chem. & Rad. Protection 9/13/81 J. Blasiak Chem. & Rad. Protection 9/13/81 9

0 e

S O

EPP-11 -19 May 1982

TSC Positions (Cont.)

b.)

Personnel trained for the position of Reactor Physics Coordinator, listed in order of preference:

Name Dept./Ag ency Date Qualified 9

R. Smith Tech. Services 9/13/81 W. Drews Tech. Services 9/13 /81 J. Spadafore Tech. Services 9/ 13 /81 O

k,;,'

E PP-11 -20 May 1982

TSC Positions (Cont.)

f ',

Personnel trained for the position of Instrumentation and Control s

Coord inator, listed in order of preference:

Name Dept./ Agency Date Qualified B. Taylor I&C 9/13 /81 5

R. Coon I&C 9/13/81 L. Lagoe I&C 9/13/81

{>

%J l

O EPP-ll -21 May 1982

T,SC Positions (Cont.)

(J

's

'?

Personnel trained for the position of Public Information Coordinator, listed in order of preference:

Name Dept./ Agency Date Qualified R. Smith NMP-2 Operations 9/ 13 /81 R. Abbott NMP-2 Operations 9/13 /81 9

R. Gayne NMP-2 Operations 9/ 13 /81 Unit #2 SSS's NMP-2 Operations 9/13 /81 (Listed in alphabet'ical order.)

A. Anderson NMP-2 Operations 9/13/81 M. Colomb NMP-2 Operations 9/13/81 G. Moyer NMP-2 Operations 9/13 /81 K. Rossiter NMP-2 Operations 9/13/81 W. Wambsgan NMP-2 Operations 9/13 /81 O

EPP-ll -22 May 1982

L TSC Positions (Cont.)

Personnel trained for the position of Communications Coordinator, listed k

in order of preference:

Name Dep t./ Agency Date Qualified 9

D. Palmer QA 9/13/81 C. Leskiw QA 9/13 /81 O

Personnel trained for Communications Staff:

Name Dept./ Agency Date Qualified W. Connolly QA 9/13/81 K. Shea QA 9/13 /81 L. Stucky QA 9/13/81 P. Sconzert QA 9/13/81 9

J. Porter QA 9/13/81 M. Biamonte PACC 9/ 13 /81 R. Burtch PACC 9/13/81 P. Frances PACC 9/ 13 /81 J. Lower PACC 9/13/81 S. Leonard PACC 9/13 /81 O

EPP-11 -23 May 1982

l i

TSC Positions (Cont.)

j Personnel trained for the position of Security Coordinator, listed in order of preference:

f Name Dept./ Agency Date Qualified 9

R. Orr Security 10/2/81 D. MacVittle Security 10/2/81 W. Chambers Security 10/2/81 J. Dilk Security 10/2/81 O

WW es e m e l

l EPP-11 -24 May 1982

TSC Positions (Cont.)

Personnel trained for TSC Headquarters Support Engineering:

(~ )

w Name Department Area of Expertise Date Qualified W. Novicki

'Eng.

Mechanical Eng.

9/13/81 L. Blaisak Eng.

Generation Station 9/13 /81 Protection Eng.

9/13/81 M. Mosier Eng.

Nuclear Eng.

9/13/81 G. Gresock Eng.

Nuclear Eng.

9/13 /81 S. Wilczek Eng.

Nuclear Eng. (Fuel Eng.)

9/13/8J T. Gorman Eng.

Structural Eng.

9/13 /81 E. Treadwell Eng.

Civil & Structural Eng.

9/ 13 /81 E. Weiss Eng.

Protection Eng.

9/13 /81 A. W. Crittenden Eng.

Mechanical Eng.

9/13/81 D. Pracht Eng Mechanical Eng. & I&C 9/13/81 R. J. Whitford Eng '.

Electrical Eng.

9/13 /81 N. Rademacher Eng.

Nuclear Eng.

9/13/81 L. McNeer Eng.

Nuclear Eng.

9/13 /81 0

/7, k

E PP-11 -25 May 1982

TSC Positions (Cont.)

b)

Personnel trained for the position of Meteorological Advisor, listed in v

order of preference:

Name Department Date Qualified R. Caiazza Env. Affairs 9/13/81 b

f Y %

q EPP-11 -26 May 1982

Control Room Positions

[1 Personnel trained for the position of Control Room Advisors, listed in b '

order of preference for each position:

Station Superintendent Date Qualifisd _

T. Roman 9/13 /81 J. Aldrich 9/13/81 J. Shea 9/13 /81 D. Matthews 9/ 13 /81 g

I&C Unit Supervisors R. Coon 9/13 /81 W. James 9/13/81 Reactor Analysts J. Conway 9/13 /81 J. Spadafore 9/13/81 B. Drevs 9/13/81 R. Smith 9/ 13/81 Asst. Supervisors of Chemistry and Radiation Protection T. Kurtz 9/13 /81

~)

J. Blasiak 9/13/81 O

EPP-ll -27 May 1982

Control Room Positions (Cont.)

Personnel trained for the position of Operator:

{/

.)

N Name Dept./ Agency Date Trained A. Barnhart -

Oper.

9/ 13 /8 1'~

K. Bessel Oper.

9/13 /81 S. Carlin Oper.

9/13/81 W. Davey Oper.

9/13/81 C. Degone Oper.

9/13 /81 A. DeGracia Oper.

9/13/81 J. Dorval Oper.

9/13/ 81..

T. Gardner Oper.

9/13/81 L. Hartman Oper.

9/13/81 G. Holthouse Oper.

9/13 /81 T. Howard Oper.

9/13/81 D. Jenks Oper.

9/13/81___

D. Lilly Oper.

9/ 13 /81 T. Lucas Oper.

9/13 /81 M. Masuicca Oper.

9/13/81 D. Matthews Oper.

9/13/81 B. Murtha Oper.

9/ 13 /81 J. Pavel Training 9/13/81

~B. Quinn Oper.

9/13 /81.

D. Richards Oper.

9/13 /81 D. Slate oper.

9/13/81

( 39 J. Spadafore Tech. Services 9/13/81

\\/

D. Stein Oper.

9/13/81 G. Steiner Oper.

9/13/81 R. Steiner Oper.

9/13/81 D. Swayze Oper.

9/13 /81 E. Townsend Oper.

9/13 /8 1 M. Turner Oper.

9/13/81 G. vonderEsch Oper.

9/ 13 /81 T. Wood Oper.

9/13 /81 J. Parrish Oper.

9/ 13 / 8 1 J. Kibbe Oper.

~

9/ 13 /81 M. Dooley Oper.

9/ 13 /81 M. Randall Oper.

9/13 /81 R. Murray Oper.

9/13 /81 D. Pike SPM 9/ 13 /81 F. Conaway Oper.

9/13 /81 E. Walker Oper.

9/ 13 /81 J. Mancuso Oper.

9/13 /81 T. Jermyn Oper.

9/13 /81 R. Green Oper.

9/13/81 C. Newson Oper.

9/13/81 C. Gerber Radwaste 9/ 13 / 8 1 O

EPP-11 -28 May 1982

(

OSC Positions Personnel trained for the positions of operation Support Center L.

Coordinators:

Name

~~

Dept./ Agency Date Qualified J. Aldrich Training 9/13 /81 A. Andersen Oper.

9/13/81 D. Balduzzi Central Files 9/13/81 K. Carter Central Files 9/13/81 C. Cary Training 9/13/81 M. Colomb Oper.

9/13/81 H. Criss Maint.

9/ 13/81 M. Falise Maint.

9/13 /81 R. Gayne Oper.

9/13/81 C. Gerber M. Goldych Radvaste 9/13/81 Training 9/13/81 P. Harrison Tech. Services 9/13/81 F. Hawksley Maint.

9/13/81 M. Hedrick Training 9/13 /81 M. Helvie Maint.

9/13/81 M. Jones Tech. Services 9/13 /81 L. Lagoe I&C 9/13/81 P. Mangano Tech. Services 9/13/81 g

H. Master Maint.

9/13/81 T. Masuicca Maint.

9/13 /81 n.

M. Meehan Stores 9/13/81 V

H. Michaels Oper.

9/13/81 M. Jaworsky Rad. Prot.

9/13/81 H. Barrett Tech. Services 9/13 /81 D. Wilcox Training 12/4/81 M. Dooley Training 12/4/81 W. James I&C 12/4/81 N. Patrou Tech-Services 12/4/81 S. Roby Training 12/4/81 D. Helms Chem. & Rad. Protection 12/4/81 T. Chwalek Chem. & Rad. Protection 12/4/81 W. Mosher*

Office 9/13/81 G. Moyer oper.

9/ 13 /81 R. Murney Tech. Services 9 /13 /81 J. Pavel Training 9/13/81 T. Peeling Training 9/13 /81 J. Poindexter Training 9/13/81 R. Randall Tech. Services 9/13/81 R. Raymond Tech. Services 9/ 13 /81 D. Reynolds Maint.

9/13 /81

~

T. Rizzo oper.

9/ 13 /81 K. Rossiter Oper.

9/13/81 D. St. John Tech. Services 9/13/81 J. Shea Oper.

9/13/81 J. Slater Tech. Services 9/13/81 s

J. Spadafore Tech. Services 9/13 /81 8

EPP-11 -29 May 1982

-. ~... -.

OSC Positions (Cont.)

Personnel trained for the position of Operation Support Center (e

Coordinators:

Name Dep t./ Agency Date Qualified W. Thomson Training 9/13 /81 V. Uperaft Safety 9/13 /81 W. Wambagan Oper.

9/13/81 M. Williams Maint.

9/13/81 T. Wood Training 9/ 13/81 K. Zollitsch Training 9/13 /81 R. Neild Tech. Services 9/ 13/81 R. Gerbig Rad. Prot.

9/13/81 K. McLaughlin Tech. Services 9/ 13 /81 O

5 O

EPP-ll -30 May 1982

l

(

OSC Positions (Cont.)

Personnel trained for the Radiological Monitoring Teams:

()

Name Dept./ Agency Date Qualified '

D. Barcomb

~

~

Rad. Prot.

9/ 13 /81 C. Brozenich Rad. Proc.

9/ 13 /81 J. Coates Rad. Prot.

9/13/81 J. Cook Rad. Prot.

9/13 /81 J. Hurley Rad. Prot.

9/ 13/81 T. Irving Rad. Prot.

9/ 13 /81 L. Kellock Rad. Prot.

9/ 13/81 J. Lacey Rad. Prot.

9/13/81 9-D. MacDonald Rad. Prot.

9/13/81 Z. Miahky Rad. Prot.

9/ 13 /81 P. Osetek Rad. Prot.

9/13/81 C. Senska Rad. Prot.

9/13/81 N. Sereno Rad. Prot.

9/ 13/81 J. Stone Rad. Prot.

9/13 /81 J. Gray Rad. Prot.

9/13/81 L. Sanderson Rad. Prot.

9/13/81 G. Burgess Oswego County Office of Emerg. Preparedness 9/13/81 O

O EPP-ll -31 May 1982

OSC Positions (Cont.)

_ Personnel trained for the Damage Control Teams for each area:

(o

_s Mechanical

~

Name Dep t./ Agency Date Qualified R. Ahart Maintenance 9/ 13 /6I R. Blunt Maintenance 9/13 /81 P. Carroll Maintenance 9/13/81 T. Fahnestock Maintenance 9/13 /81 J. Fitzgerald Maintenance 9/13/81 D. Forsyth Maintenance 9/ 13 /8) f J. Kuzniar Maintenance 9/13/81 C. Lass Maintenance 9/ 13 /81 D. Oswald Maintenance 9/13/81 J. Perkins Maintenance 9/ 13 /81 D. Quonce Maintenance 9/13/81 D. Robert Maintenance 9/13 /81 C. Root Maintenance 9/13/81 R. Ruggio Maintenance 9/13 /81 E. Sexton Maintenance 9/13/81 D. Stone Maintenance 9/13 /81 J. VanGelder Maintenance 9/13 /81 F. Weigelt Maintenance 9/13 /81 M. Wood Maintenance 9/13/81 L. Yablonski Maintenance 9/13 /81 1

M. Zakala Maintenance 9/ 13 /81

)

I EPP-11 -32 May 1982

OSC Positions (Cont.)

Personnel trained for the Damage Control Teams for each area:

F)'

\\_

Electrical Na me Dept./ Agency Date Qudlified R. Barrett Maintenance 9/ 13 /81 F. Bordon Maintenance 9/13/El L. Gibson Maintenance 9/13/81 J. Higby Maintenance 9/13 /81 F. James Maintenance 9/13 /81 K. McKinstry Maintenance 9/13 /81 S. Moryl Maintenance 9/ 13 /8 1 Instrument & Control Name Dep t./ Agency Date Qualified T. Church I&C 9/13 /81 M. Boyle NMP-2 I&C 9/13/81 M. Cummins I&C 9/13/81 2

R. Do e I&C 9/13/81 L. Hart I&C 9/13/81 M. Haughton I&C 9/13/81 J. Rill I&C 9/13/81 W. James I&C 9/13 /81 J. Kinsly I&C 9/ 13 /8 1

()

P. Pethybridge I&C 9/13 /81 R. Sganga I&C 9/ 13 /81 S. Simoneau I&C 9/13 /81 F. Slye NMP-2 I&C 9/ 13 /8 1 A. Smith I&C 9/13 /81 T. Smith QC 9/13/81 C. Soucy I&C 9/ 13 /81 P. Sweeney I&C 9/13/81 W. Witherell Operations 9/13 /81 T. Woodward I&C 9/ 13 /8 1 K. Yackel I&C 9/13 /81 Reactor Physics Name Dept./ Agency Date Qualified A. DiMento Reactor Physics 9/13/81 B. Eastman Reactor Physics 9/13/81 J. Hollenbeck Reactor Physics 9/13 /81 R. Norris Reactor Physics 9/ 13 / 81 B. Tessier.

Reactor Physics 9 / 13 /81 G

EPP-11 -33 May 1982

EOF Positions Personnel trained for the position of Corporate Emergency Director / Recovery Mgr.:

Name Dept./ Agency Date Quilified T. Lempges Nuc. Generation 9/13/81 9

T. Perkins Nuc. Generation 9/13 /81 0

l l

I 1

l o

~ ' ' '

f 9

0 l

l EPP-11 -34 May 1982 l

L

EOF Positions (Cont.)

7k Personnel trained for the position of _ Technical Liaison / Advisory Mgr., ~~

listed in order of preference:

Nam Dept./ Agency Date Qualified 9

D. P. Dise V.P. Engineering 9/13/81 G. Gresock Unit 2 Liaison Engineer 9/13/81 O.

O EPP-11 -35 May 1982

v EOF Positions (Cont.)

Personnel trained for the position of Security Director, listed in order of preference:

Name Dept./ Agency Date Qualified J. Sunser Security (Syr.)

9/13/81 K. Crounse Security (Syr.)

9/13/81 9

A. DiStaola Security (Syr.)

9/13/81 F. McCarthy Security (Syr. )

9/13/81 H. Cienava Security (Syr.)

9/13/81 O

EPP-11 -36 May 1982 l


_----a

EOF Positions (Cont.)

Personnel trained for the position of Administrative / Logistics Mgr.,

()

listed in order of preference:

Name Dep t./ Agency Date Qualified B. Lyth Oswego Comm. Office 9/ 13/81 g

Mike Meehan Materials Management 9/13/81 D. Meade Oswego Comm. Office 9/13/81 pm, Q,

O EPP-11 -37 May 1982

EOF Positions (Cont.)

Personnel trained for the position of Scheduling / Planning Mgr., listed in order of preference:

Name Dept./ Agency Date Qualified O

Mike Jones NMP-2 Test Supv.

9/13/81 O

l EPP-ll -38 May 1982

EOF Positions (Cont.)

Personnel trained for the position of Emergency Director of Public

~

Information, listed in order of preference:

Name Deut./ Agency Date Qualified l

R. Burtch PACC 9/13/81 O

e O

EPP-11 -39 May 1982

(

EOF Positions (Cont.)

Personnel trained for Radiologic Assessment Group, listed in alphabetical

( ' ')

order:

Name Dep t./Ag ency Date Qualified J. Blasiak Chem. & Rad. Protection 9/13/81 J. Duell Chem. & Rad. Protection 9/13/81 H. Flanagan Chem. & Rad. Protection 9/13/81 H. Hedrick Training 9/ 13 /81 T. Kurtz Chem. & Rad. Protection 9/13/81 g

E. Leach Chem. & Rad. Protection 9/13/81 T. Peeling Training 9/13/81 P. Volza Chem. & Rad. Protection 9/13/81 G. Burgess Oswego County Emerg.

Preparedness 9/13 /81 O

O EPP-ll

-40 May 1982

+'

l EOF Positions (Cont.)

Personnel trained for the position of EOF Communicator, listed in order of

,_ )

preference:

Name Dept./ Agency Date Qu'alified M. A. Biamonte PACC 9/13/81 9

P. Godfrey PACC 9/13/81

()

Personnel trained for the Communications Staff:

Name Dept./ Agency Date Qualified P. Godfrey PACC

~

9/13/81 9

J. Lower PACC 9/13 /81 S. Leonard PACC 9/13/81 O

EPP-ll -41 May 1982 L..

_