Forwards IE Insp Rept 50-261/82-14 on 820411-0510.No Noncompliance Noted
ML20054H000
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/26/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML20054H001 List:
References
NUDOCS 8206220482
Download: ML20054H000 (2)


See also: IR 05000261/1982014

Text

,, -

. .

ZH

-

MAY 2 61982

Carolina Power and Light Company

ATTil: Mr. J. A. Jor.es, Senior Executive

Vice President and Chief

Operating Officer

411 Fayetteville Street

Raleigh, flC 27602

Gentlemen:

Subject: Report flo. 50-261/82-14

This refers to the routine safety inspection conducted by !!r. S. Weise of this

of fice on April 11 - May 10,1982, of activities authorized by f1RC Operating

License No. OPR-23 for the H. B. Robinson facility and to the discussion of our

findings held with !!r. R. B. Starkey, Plant General Manager, at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

l telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter. Such application must be consistent with the requirements of

l 10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

DMbd7

F. J. Long, Acting Chief

Reactor Project Branch 1

Division of Project and

Resident Programs

Enclosure: (See page 2)

8206220482 820526

PD't ADOCK 05000261

0 PDR

[Q/

- 3

. .

-

.

g A'i 2.6 $82

.

Carolina Power & Light Company 2

Enclosure:

Inspection Report No. 50-261/82-14

cc w/ encl:

R. B. Starkey, Jr. , Plant General llanager