ZH
MAY 2 61982
-
Carolina Power and Light Company
ATTil: Mr. J. A. Jor.es, Senior Executive
Vice President and Chief
Operating Officer
411 Fayetteville Street
Raleigh, flC 27602
Gentlemen:
Subject:
Report flo. 50-261/82-14
This refers to the routine safety inspection conducted by !!r. S. Weise of this
of fice on April 11 - May 10,1982, of activities authorized by f1RC Operating
License No. OPR-23 for the H. B. Robinson facility and to the discussion of our
findings held with !!r. R. B. Starkey, Plant General Manager, at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
l
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
l
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
DMbd7
F. J. Long, Acting Chief
Reactor Project Branch 1
Division of Project and
Resident Programs
Enclosure:
(See page 2)
8206220482 820526
PD't ADOCK 05000261
0
[Q/
3
-
.
.
-
g A'i 2.6 $82
.
.
Carolina Power & Light Company
2
Enclosure:
Inspection Report No. 50-261/82-14
cc w/ encl:
R. B. Starkey, Jr. , Plant General llanager
bcc w/ encl:
NRC Resident Inspector
Document flanagement Branch
State of South Carolina
RII
RII
Ril
y
RII
OhIeIse:dt
h
din
br
FJLon
r
5/.;c /82
5/p-/82
5/p/82
5/2 L /82
>