ML20054G752

From kanterella
Jump to navigation Jump to search
Confirms Intent to Perform Const Assessment Team & Independent Measurement Insp at Site During 820621-0702,per 820601 Discussion.Insp Will Encompass Areas of Qa,Design Control,Project Mgt,Const Control & Procurement
ML20054G752
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 06/15/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Tallman W
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
References
NUDOCS 8206220265
Download: ML20054G752 (1)


Text

()

3 G

A JUN 1 5 1382 W

DocketNo(s).50-443 50-444 Public Service Company of New Hampshire ATTN: Mr. W. C. Tallman Chainaan and Chief Executive Officer 1000 Elm Street-Manchester, New Hampshire 03105 Gentlemen:

Subject:

Construction Assessment Team and Independent Measurements by NRC at Seabrook This letter is to confirm the NRC Region I intent to perform a Construction Assessment Team (CAT) and an independent measurement (NDE Van) inspection at the Seabrook site during the June 21 through July 2, 1982 period.

These plans were originally discussed by Mr. J. P. Durr, of this office, and Mr. J.

Singleton, of your staff, on June 1,1982.

The inspection will encompass the areas of quality assurance, design control, project management, construction control, procurernent, and an independent verification of your nondestructive examination program.

Your staff will be informed of any significant findings on a daily basis to facilitate resolution or prompt corrective actions. An exit interview will be held on July 2,1982, and the final report will be issued through our normal correspondence process.

If you have any further questions regarding this platincd inspection contact Jacque P. Durr, of my staff (215) 337-5282.

Sincerely, j

$ n,c

/cg.i:t<[

(

.l

>j w

Thomas T. Martin, Director Division of Engineering and 8206220265 820615 PDR ADOCK 05000443 Technical Programs O

PDR cc:

John DeVincen'is, Project Manager Public Docume it Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of New Hampshire

,Q

'V bcc:

p I

Region I Docket Room (with concurrences)

DETP,.7c4

.j..

D DETP op rica p i

sumur )

..D u r.r............E.b n.e.t e r..

... 3a r n..

..G[/.'/

2-...NYfA.

d..d

.L ome>

we renu ais om wcu ru OFFICIAL RECORD COPY us.vc m,-um