JUN 8
GB2
Docket No. 50-315
Docket No. 50-316
American Electric Power Service
Corporation
Indiana and Michigan Electric Company
ATTN:
Mr. John E. Dolan
Vice Chairman
Engineering
2 Broadway
New York, NY 10004
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
W. L. Axelson, A. G. Januska, W. B. Grant and Ms. M. J. Smith of this office
on March 29-31, 1982, of activities at the Donald C. Cook Nuclear Plant
authorized by NRC Operating Licenses No. DRP-58 and No. DRP-74 and to the
discussion of our findings with W. G. Smith and others of your staf f at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection. Ilowever, the EOF facilities, equipment and AEP
organization were not demonstrated during this exercise. NRC concerns
regarding your interim EOF will be addressed in a future inspection report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days f rom the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this of fice
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished.
Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
020622O224 820600
[
PDR ADOCK 05000315
O
=
-
, .
.
American Electric Power
2
,
Service Corporation
i
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
'
1
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought-
to be withheld shall be incorporated as far as possible into a separate
i
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above,-a copy of this letter and the enclosed
-inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
j
'
C. J. Paperiello, Chief
Program Support Branch
Enclosure:
Inspection
Report No. 50-315/82-09
l
and No. 50-316/82-09
cc w/ enc 1:
!
W. G. Smith, Jr. , Plant Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
'
!
l
RIII
RIII
RIII
RIII
RIII
,
dm
ka
on
llo
1
/18/82