ML20054G701

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-269/82-07,50-270/82-07 & 50-287/82-07 on 820510-14.No Noncompliance Noted
ML20054G701
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 05/27/1982
From: Dance H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20054G702 List:
References
NUDOCS 8206220222
Download: ML20054G701 (2)


See also: IR 05000269/1982007

Text

f

'

('{kq)

'o

UhY 2i G92

Duke Power Company

ATTN:

Mr. W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

Subject:

Report Nos. 50-269/82-07, 50-270/82-07 and 50-287/82-07

This refers to the routine safety inspection conducted by Mr. P. Skinner of this

of fice on May 10-14, 1982, of activities authorized by NRC Operating License

Nos. DPR-38, DPR-47 and DPR-55 for the Oconee facility and to the discussion of

our findings held with Mr. J. E. Smith, Station Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you noti fy this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

i

/s-

H. C. Dance, Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

Enclosure:

See Page 2

8206220222 820S27

PDR ADOCK 05000269

G

PDR

$YO{

~

}

I

e

.

Duke Power Company

2

/ day E7 1982

Enclosure:

Inspection Report Nos. 50-269/82-07,

50-270/82-07 and 50-287/82-07

cc w/ enc 1:

J. E. Smith, Station Manager

bec w/ encl:

NRC Resident Inspector

Document Management Branch

State of South Carolina

l

.

F

,

l

k/[ 'l

,gb/

h0h

II

RIl

gti

Algnato[is

,v

PHSkinner:ht

Upright

ARHerdt

HC hnce

5//,7/82

5j,7/82

54782

5(M/82

5/g/82

<