MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 ML20247H5661998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Ccnpp ML20216G4601998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20248L3641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20202G6611998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198N9441997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Calvert Cliffs Nuclear Power Plant,Units 2 & 3 ML20203H3081997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Calvert Cliffs Nuclear Power Plant ML20199D0801997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198J6631997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Calvert Cliffs Nuclear Power Plant ML20210U7031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ccnpp ML20210L0671997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Ccnpp ML20149E2301997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Calvert Cliffs Nuclear Power Plant ML20148L1761997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CCNP ML20141F1401997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20137W8781997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Calvert Cliffs Nuclear Power Plant ML20136J4941997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20134M2891997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20133N1031996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20132D1141996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2 ML20134L6621996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Calvert Cliffs Nuclear Power Plant Unit 1 & 2 ML20128Q8011996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Calvert Cliffs Npp,Units 1 & 2 ML20117N2171996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20116M6701996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20115F7281996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112J1291996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112A2421996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20107C1831996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20101D7831996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ccnpp ML20149K8721996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ccnpp ML20096D7031995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ccnpp Units 1 & 2 ML20095H3741995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20096D7171995-11-30030 November 1995 Rev to Monthly Operating Rept for Nov 1995 for Ccnpp Unit 2 ML20094M0161995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Calvert Cliffs Nuclear Plant ML20093G5881995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Calvert Cliffs Nuclear Power Plants Units 1 & 2 ML20092G3521995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Calvert Cliffs Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20216J8731999-09-10010 September 1999 Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML17326A2011999-08-23023 August 1999 LER 99-004-00:on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With 990823 Ltr ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20210N6001999-07-27027 July 1999 ISI Summary Rept for Calvert Cliffs Unit 2. Page 2 of 3 in Encl 1 of Incoming Submittal Not Included ML20210B7941999-07-15015 July 1999 SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs LD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified1999-06-30030 June 1999 Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed1999-06-25025 June 1999 Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed ML20196C6981999-06-21021 June 1999 Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20195B3891999-04-30030 April 1999 0 to CENPD-279, Annual Rept on Abb CE ECCS Performance Evaluation Models ML20205N2951999-04-13013 April 1999 Special Rept:On 990314,fire Detection Sys Was Removed from Svc to Support Mod to Replace SRW Heat Exchangers in Unit 2 SRW Room During Unit 2 Refueling Outage.Contingency Measure 15.3.5.A.1 Will Continue Until Fire Detection Sys Restored ML20210T5211999-04-0101 April 1999 Rev 0 to Ccnpp COLR for Unit 2,Cycle 13 ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20204H6471999-03-21021 March 1999 SER Re License Renewal of Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20203D4311999-02-0505 February 1999 Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20199G4671999-01-20020 January 1999 SER Accepting USI A-46 Implementation for Plant ML20206Q3221999-01-11011 January 1999 Special Rept:On 981226,wide Range Noble Gas Effluent RM Was Removed from Operable Status.Caused by Failure of mid-range Checksource to Properly Reseat.Completed Maint & post-maint Testing & RM Was Returned to Operable Status on 990104 ML20207L0451999-01-0808 January 1999 Cost-Benefit Risk Analyses:Radwaste Sys for Light Water Reactors ML20199F4781999-01-0808 January 1999 Safety Evaluation Concluding That Bg&E Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking.Concludes GL 95-07 Actions Were Addressed ML20198S7591999-01-0707 January 1999 SER Accepting Quality Assurance Program Description Change for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M2281998-12-31031 December 1998 1998 Annual Rept for Bg&E. with ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20206R9911998-12-0808 December 1998 Rept of Changes,Tests & Experiments (10CFR50.59(b)(2)). with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195H1001998-11-16016 November 1998 Safety Evaluation of First Containment Insp Interval Iwe/Iwl Program Alternative ML20196E2211998-10-31031 October 1998 Non-proprietary Rev 03-NP to CEN-633-NP, SG Tube Repair for Combustion Engineering Designed Plant with 3/4 - .048 Wall Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154Q7191998-10-21021 October 1998 Special Rept:On 980923,unit 1 Wrngm Was Removed from Operable Status.Caused by Failure of Process Flow Transducer.Completed Maint to Remove Process Flow Transducer Input to Wrngm Microprocessor & Completed Formal Evaluation ML20154G3931998-10-0505 October 1998 Safety Evaluation Concluding That Flaw Tolerance Evaluation for Assumed Flaw in Inboard Instrument Weld of Pressurizer Meets Rules of ASME Code ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20153C2571998-09-18018 September 1998 Special Rept:On 980830,wide Range Noble Gas Monitor (Wrngm) Channel Was Removed from Operable Status.Caused by Need to Support Performance of Required 18-month Channel Calibr.Will Return Wrngm to Operable Status by 980925 ML20153C1091998-09-18018 September 1998 Part 21 Rept Re Defective Capacity Control Valves.Trentec Personnel Have Been in Contact with Bg&E Personnel Re Condition & Have Requested Potentially Defective Valves ML20151U5441998-09-0404 September 1998 Bg&E ISI Summary Rept for Calvert Cliffs ML20151T5281998-09-0101 September 1998 Special Rept:On 980819,declared Rv Water Level Monitor Channel a Inoperable.Caused by Failure of Three Heated Junction Thermocouples (Sensors) in Lower Five Sensors. Channel a & B Rv Water Level Probes Will Be Replaced ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237D4981998-08-19019 August 1998 Safety Evaluation Accepting Licensee Request for Extension of Second ten-year Inservice Insp Interval ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20237D5941998-07-22022 July 1998 Rev 2 to Ccnpp COLR for Unit 2,Cycle 12 ML20236L7521998-07-0606 July 1998 Safety Evaluation Granting Bg&E 980527 Request for Relief from Requirement of Section IWA-5250 of ASME Code for Calvert Cliffs Unit 2.Alternatives Provide Reasonable Assurance of Operational Readiness ML20236F7791998-06-30030 June 1998 Safety Evaluation Authorizing Request for Temporary Relief from Requirement of Subsection IWA-5250 of ASME Code,Section XI for Plant,Unit 1 ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20236X3101998-06-19019 June 1998 Rev 1 to Calvert Cliffs Nuclear Power Plant COLR for Unit 2,Cycle 12 ML20249A9571998-06-15015 June 1998 Special Rept:On 980430,fire Detection Sys Was Removed from Svc to Support Mod to Purge Air Sys 27-foot Elevation & 5-foot Elevation East Piping Penetration Rooms.Installed Temporary Alteration & Returned Fire Detection Sys to Svc ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 1999-09-30
[Table view] |
Text
i OPERATLNG DAT A REPORT DOCKET NO. _50-317 DATE 6/14/82 COMPLETED BY Elaine Lotito TELEPHONE (301) 787-5363 OPf RATING STAlUS Notes
- 1. Uni: Name: Calvert Cliffs No. 1
- 2. Reportmg Period. May 1982
- 3. Li.:en><d Thermal Power OlWt p 2,700
- 4. Nameplate Rating (Gross alWe): 910
- 5. Design Elutrical Reimg(Net SIWE): 845
- 6. hissimum Dependable Capacity IGross hlWe#: 860
- 7. Masinium Dependable Capacity (Net Slhe): 825
- 8. If Charges Occur in tapairy Ratings (Itc.ns Nunter 3 Through 7) Since Last Report.Gise Reasons-
- 9. Pouer Lesel To hhich licotricted. If Any (Net 4thee
- 10. Reason For Restrutions,if Any:
This Month Yr -to Date Ct.mubtise 4
744.0
- 11. Ilours in Reporting PerioJ 3,623.0 61,932.0
- 12. Number Oi flours Reactor Was Critical 0.0 2,547.4 49,l'.7.1
- 13. Reactor Resene Shutdown Hours 0.0 0.0 1,192.4
- 14. Ifours Generator On Line 0.0 2.547.4 48,149.1
- 15. Unit Resene Shutdown floors 0.0 0.0 'O.0
- 16. Gross Thennal Energy Cecenated thlWH) 0 6,735,967 _ 116,653,44) ,
- 17. Gross Electrical Energy Generated 1%IWill o _
2,274,438 38,268,435
~
- 18. Nc Electrical Energy Generated (MWil) 0 _2 178.927 _ 36,480,960
- 19. Onst Senice Factor 0.0 7_0.3 77.7
- 20. Uma Assalal:ility Factor 00 70.3 77.7
- 21. Unit Capacity Factor (Using %1DC Net 0.0 72.9 71.4
- 22. Unit Capacity f actor IUsing DER Neil o_0 71.2 69.7 _
- 23. Unit f orced Outage Rate 0.0 0.0 8.4
- 34. Shutdowns Scheduled Over Nest 6 Months lI)pe. Date.and Duration of Eacht No. 1 Plant on a planned outage from 4/17/82 for refueling, unit general inspection and retube condenser.
- 25. If Shut Down At End Of Report PersoJ. Estimated Date of Startup:
- 16. Units in Test Status (Prior to Commercial Operstkm). Forecast Achksed INITIA L CRITIC ALITY INiil % L ELECTRICITY COM4!LRCI AL OPLRTT!ON O .) (9/77)
R
OPER ATING DAT A REPORT DOCKET NO. 50-318 DATE 6/14/82 COS:PLETED BY Elaine Lotito TELEPilONE (301) 7&b5363 OPERATING STA1US
- 1. Unit Name: Ca1 vert C1iffs No. 2 N '*5
- 2. Reportmg Period: May 1982 2,700
- 3. Li:ensed Therm.11 Pow er (MWI):
- 4. Nameplate Rating (Giuss MWe): 911
- 5. Design ElectricallLimglNet MWe): 845
- 6. Maximum Dependable Capacity IGross MWe): 860
- 7. Manimum Dependable Ca,4 city (Net MWe): 825
- 8. If Charges Occur in Cap ary Ratings titems Nunter 3 Thrnugh 7) Since Last Report.Gise Reasons:
- 9. Power Lesel lo hhich lie,tricted.If Any (Net MWe):
- 10. Reatora Foi Restrictieru. lf Any:
This Month Yr..to Date Ct.mubtive
!!. !! curs in Reporting PerioJ 744,0 3.623.0 45,287.0
- 12. Number Of flours Reactor Was Critical 744.0 3,313.7 38,881.7
- 13. Reactor Resene Shutdown Hours 0.0 9.4 723.6
- 14. ilours Generator On Line 744.0 _
3,291.2 38,335.6,
- 15. Urut Resene Shutdown floors 0.0 0.0 0.0 '
- 16. Gross Thermal Energy Generated (MWH) 1.978,070 8,704,958 94,749,514 .
- 17. Gross Electrical Energy Genersted IMWill 6_50,264 _
2,891,512 31,306,915 th. Net Electrical Energy Generated (MWHi 624.376 2.769.862 __29,855,673
- 19. Omi Senice facto, 100_.0 90_.8 84.7
- 20. Unit Asailability Facic: 100.0 90.8 84.7
- 21. Unit Capacity Factor IUsi,g MDC Net, 101 ~. 7 92.7 79.9
- 22. Unit Capacity Factor IUsmg DER Nes) 99.3 90.5 78.0
- 23. Unit Forced Outage Rate 0.0 9.2 5.7 l 24. Shutdowns Scheduled Oser Sest 6 Months 113pe. Date, and Duraterm of Eacht-
- 25. If Shut Down At End Of Report Period. Estimated Date of Staitup:
- 26. Units In Test Status (Prior ia Commercial Opcr, tion). Forecast Achiesed INITI A L CRITIC ALITY .
INITI%L El ECTRICITY COM\!ERCIA L OPEit A TION l
\
I i
(9/77) e y_.. . , . - _ , _ _-
~ _ _
3., .'
AVER AGE D AILY UNIT POWER LEVEL DOCKET NO. 50-317 UNIT Calvert Cliffs #1 DATE 6/14/82 COMPLETED 8Y Elaine - Lotito TELEPflONE (301) 787-5363 MONTli May 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (Mwe. Net) 1 17 2 18 3 19 4 20 5 21 6 22
~
7 23 8 24 9 25 10 26 II 27 -
12 28 13 29
~
14 30 15 33
~
16 INSTRUCTIONS On this format. list the average daily unit power level in MWe-Net for each day in the reporting inonth. Compute to the nearest whole megawatt.
(4/77) ,
s., ..' .
AVER AGE DAILY UNIT POWER LEVEL DOCKET Nt), 50-318 UNIT Calvert Cliffs #2 DATE 6/14/82 COMPLETED BY Elaine Lotito TELEPFfONE (301) 787-5363 MON 7;g May 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (M We-Net) (MWe-Net)
I __
867 37 854 2 850 gg 855 3 832 39 853 4 863 852 20 5 858 yg 845 6 860 766 22 7 860 23 838 8 838 24 839 9 860 25 iS2 10 854 26 808 11 853 27 809 12 851 801 28 13 851 844 29 14 852 843 30 834 IS 31 16 836 INSTRUCT!ONS On this format, list the average daily unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
~ ~ - -- -
DOCKET NO. 50-317 '
UNIT SHUTDOWNS AND l'OWER REDUCTIONS (',1 < v n c's < r r c g1 UNIT N AME D ATE 6 /14 / 92 COMPLETID BY Elaine Lat i to REPORT MONTif M,v 10R9 TELEPHONE (301) 787-5363 w.
- E E
.$ E 3 y [5 Licensee ,E r, {i a?
Cause & Corrective Action to N. Date h 3? { 2s5 Esent aT
e-Repost = EL !C O
Present Recurrence 6
82-01 820417 5 744.0 C 4 XX Fuel XX Refueling, unit general inspection and retube condenser.
I 2 3 4 F: Forced Reason: Method: Exhibet G - Instructites S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-htanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event ReporI (LERI File (NUREG-D-Regulatory Restriction 44 ontinuation 01611 1:. Operator Training & Ucensc Examination 5-Load Reduction F. Administrative 5 9-Other Exhibit I -Sanw Source G Operational Error IExplain) 19/77) flother (Explain) j
DOCKET NO. 50 118 ,
UNIT THUTDOWNS AND POWER RLDUCTIONS UNIT N AME C'1 vert c14fft #2 DATE 6/14/82 COMPLETED BY Elaine Lorito REN)RT MONT11 May 1982 TELifHONE (301) 787 5161-n.
E E EO "E Licensee Er Em Cause & Corrective fi No. Date k j! k 3 lEU $ Event {j V Adion to
e
- Repost a mV u
o Present Recurrence 6
No outages or reductions.
I 2 3 4 F: Forted Reason: Method: Ex]ubit G Instructions S. Scheduled A Fquipment Fai!ure(Explain) 1 Manual for Preparation of Data B-Maintenance oi Test 2 Manual Scram. Entry Sheets for Ucensee C Refuehng 3 Automatic Scram. Event Repos (LER) File (NUREG.
D Regulatory Restrictsen 4scontinuation 016I) 1: Operator Training & Uccuse Lununation 5-Load Reduction F Admmistrative 5 9-Other Exhibit 1 Sanw Source G-Operational Error (Explain)
(9/77) llother (Explain)
. ~
June 2,1982 REFUELING INFORMATION REQUEST
- 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1
- 2. Scheduled date for next Refueling Shutdown: April 16,1982
- 3. Scheduled date for restart following refueling: June 23,1982*
- 4. Will refueling or resumr tion of operation thereafter require a technical specification change or other license amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
l 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
February 15, 1982
- 6. Important licensing considerations associated with the refueling.
Reload fuel will be similar to that reload fuel inserted into the previous cycle.
4 i 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 656*
t i
Spent Fuel Pools are common to Units 1 and 2
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblics.
1830 Licensed
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
i April,1991 *
- Information changed since last report .
1 i
v - -
-y,.. - , . - - .- --
June 2,1982 REFUELING INFORMATION REQUEST
- 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
- 2. Scheduled date for next refueling shutdown: October 15, 1982.
- 3. Scheduled date for restart following refueling: January 5,1982
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other licensed amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
October 4,1982
- 6. Important licensing considerations associated with refueling.
Reload fuel will be similar to that reload fuelinserted in the previous cycle.
- 7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.
(a) 217 (b) 656*
Spent Fuel Poolis common to Units 1 and 2.
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.
1830 Licensed
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991 *
- Information changed since last report.
SUMMARY
OF UNIT 1 OPERATING EXPERIENCE - MAY 1982 5/1 At the beginning of this reporting period, Unit I was shutdown for its 5th scheduled refueling outage. Reactor Vessel head removed.
5/7 Commenced refueling at 0200.
5/13 Completed fuel handling evolutions.
5/31 At the end of this reporting period, Unit I was shutdown for its 5th scheduled refueling outage.
SUMMARY
O' JNIT 2 OPERATING EXPERIENCE - MAY 1982 5/1 At the beginni- of this reporting period Urat 2 was operating at 900 MWe with the reactor at 100% power.
5/2 Decreased load to 790 MWe at 0200 for Main Turbine Control Valve testing.
Resumed full load operation (900 MWe) at 0430.
5/3 At 0914 load was reduced to 770 MWe to investigate saltwater leakage into the main condenser. Load was increased to 900 MWe at 1600 when indications of saltwater leakage disappeared.
5/8 Decreased load to 780 MWe at 0200 to clean condenser water boxes. Load was increased to capacity (900 MWe) at 0740.
5/15 At 0600 load was decreased to 870 MWe for moderator temperature coefficient testing.
5/17 Resumed full load operation (890 MWe) at 1900.
5/22 Decreased load to 760 MWe at 0635 to test Main Turbine Control Valves, clean condenser water boxes and replace 21B Travelling Screen. Reactor power was reduced to 80% at 0800 due to approaching the 12 limit on main condenser circulating water A T. Load was increased to capacity (870 MWe) at 1800.
5/25 At 1300 load was decreased to 685 MWe to investigate saltwater leakage into the main condenser and clean condenser water boxes. Load was increased to 740 MWe at 1900 when indications of saltwater leakage disappeared.
5/26 Resumed full load operation (860 MWe) at 0600.
5/27 At 1915 load was reduced to 750 MWe to investigate saltwater leakage into the main condenser.
5/28 Load was increased to 870 MWe at 1000 when indications of saltwater leakage disappeared.
5/31 At the end of this reporting perioa Unit 2 was operating at 875 MWe with the reactor at 100% power.