Text

i OPERATLNG DAT A REPORT DOCKET NO. _50-317 DATE 6/14/82 COMPLETED BY Elaine Lotito TELEPHONE (301) 787-5363 OPf RATING STAlUS Notes

1. Uni: Name: Calvert Cliffs No. 1
2. Reportmg Period. May 1982
3. Li.:en><d Thermal Power OlWt p 2,700
4. Nameplate Rating (Gross alWe): 910
5. Design Elutrical Reimg(Net SIWE): 845
6. hissimum Dependable Capacity IGross hlWe#: 860
7. Masinium Dependable Capacity (Net Slhe): 825
8. If Charges Occur in tapairy Ratings (Itc.ns Nunter 3 Through 7) Since Last Report.Gise Reasons-
9. Pouer Lesel To hhich licotricted. If Any (Net 4thee
10. Reason For Restrutions,if Any:

This Month Yr -to Date Ct.mubtise 4

744.0

11. Ilours in Reporting PerioJ 3,623.0 61,932.0
12. Number Oi flours Reactor Was Critical 0.0 2,547.4 49,l'.7.1
13. Reactor Resene Shutdown Hours 0.0 0.0 1,192.4
14. Ifours Generator On Line 0.0 2.547.4 48,149.1
15. Unit Resene Shutdown floors 0.0 0.0 'O.0
16. Gross Thennal Energy Cecenated thlWH) 0 6,735,967 _ 116,653,44) ,
17. Gross Electrical Energy Generated 1%IWill o _

2,274,438 38,268,435

~

18. Nc Electrical Energy Generated (MWil) 0 _2 178.927 _ 36,480,960
19. Onst Senice Factor 0.0 7_0.3 77.7
20. Uma Assalal:ility Factor 00 70.3 77.7
21. Unit Capacity Factor (Using %1DC Net 0.0 72.9 71.4
22. Unit Capacity f actor IUsing DER Neil o_0 71.2 69.7 _
23. Unit f orced Outage Rate 0.0 0.0 8.4
34. Shutdowns Scheduled Over Nest 6 Months lI)pe. Date.and Duration of Eacht No. 1 Plant on a planned outage from 4/17/82 for refueling, unit general inspection and retube condenser.
25. If Shut Down At End Of Report PersoJ. Estimated Date of Startup:
16. Units in Test Status (Prior to Commercial Operstkm). Forecast Achksed INITIA L CRITIC ALITY INiil % L ELECTRICITY COM4!LRCI AL OPLRTT!ON O .) (9/77)

R

OPER ATING DAT A REPORT DOCKET NO. 50-318 DATE 6/14/82 COS:PLETED BY Elaine Lotito TELEPilONE (301) 7&b5363 OPERATING STA1US

1. Unit Name: Ca1 vert C1iffs No. 2 N '*5
2. Reportmg Period: May 1982 2,700
3. Li:ensed Therm.11 Pow er (MWI):
4. Nameplate Rating (Giuss MWe): 911
5. Design ElectricallLimglNet MWe): 845
6. Maximum Dependable Capacity IGross MWe): 860
7. Manimum Dependable Ca,4 city (Net MWe): 825
8. If Charges Occur in Cap ary Ratings titems Nunter 3 Thrnugh 7) Since Last Report.Gise Reasons:
9. Power Lesel lo hhich lie,tricted.If Any (Net MWe):
10. Reatora Foi Restrictieru. lf Any:

This Month Yr..to Date Ct.mubtive

!!. !! curs in Reporting PerioJ 744,0 3.623.0 45,287.0

12. Number Of flours Reactor Was Critical 744.0 3,313.7 38,881.7
13. Reactor Resene Shutdown Hours 0.0 9.4 723.6
14. ilours Generator On Line 744.0 _

3,291.2 38,335.6,

15. Urut Resene Shutdown floors 0.0 0.0 0.0 '
16. Gross Thermal Energy Generated (MWH) 1.978,070 8,704,958 94,749,514 .
17. Gross Electrical Energy Genersted IMWill 6_50,264 _

2,891,512 31,306,915 th. Net Electrical Energy Generated (MWHi 624.376 2.769.862 __29,855,673

19. Omi Senice facto, 100_.0 90_.8 84.7
20. Unit Asailability Facic: 100.0 90.8 84.7
21. Unit Capacity Factor IUsi,g MDC Net, 101 ~. 7 92.7 79.9
22. Unit Capacity Factor IUsmg DER Nes) 99.3 90.5 78.0
23. Unit Forced Outage Rate 0.0 9.2 5.7 l 24. Shutdowns Scheduled Oser Sest 6 Months 113pe. Date, and Duraterm of Eacht-
25. If Shut Down At End Of Report Period. Estimated Date of Staitup:
26. Units In Test Status (Prior ia Commercial Opcr, tion). Forecast Achiesed INITI A L CRITIC ALITY .

INITI%L El ECTRICITY COM\!ERCIA L OPEit A TION l

\

I i

(9/77) e y_.. . , . - _ , _ _-

~ _ _

3., .'

AVER AGE D AILY UNIT POWER LEVEL DOCKET NO. 50-317 UNIT Calvert Cliffs #1 DATE 6/14/82 COMPLETED 8Y Elaine - Lotito TELEPflONE (301) 787-5363 MONTli May 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (Mwe. Net) 1 17 2 18 3 19 4 20 5 21 6 22

~

7 23 8 24 9 25 10 26 II 27 -

12 28 13 29

~

14 30 15 33

~

16 INSTRUCTIONS On this format. list the average daily unit power level in MWe-Net for each day in the reporting inonth. Compute to the nearest whole megawatt.

(4/77) ,

s., ..' .

AVER AGE DAILY UNIT POWER LEVEL DOCKET Nt), 50-318 UNIT Calvert Cliffs #2 DATE 6/14/82 COMPLETED BY Elaine Lotito TELEPFfONE (301) 787-5363 MON 7;g May 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (M We-Net) (MWe-Net)

I __

867 37 854 2 850 gg 855 3 832 39 853 4 863 852 20 5 858 yg 845 6 860 766 22 7 860 23 838 8 838 24 839 9 860 25 iS2 10 854 26 808 11 853 27 809 12 851 801 28 13 851 844 29 14 852 843 30 834 IS 31 16 836 INSTRUCT!ONS On this format, list the average daily unit power leselin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

~ ~ - -- -

DOCKET NO. 50-317 '

UNIT SHUTDOWNS AND l'OWER REDUCTIONS (',1 < v n c's < r r c g1 UNIT N AME D ATE 6 /14 / 92 COMPLETID BY Elaine Lat i to REPORT MONTif M,v 10R9 TELEPHONE (301) 787-5363 w.

- E E

.$ E 3 y [5 Licensee ,E r, {i a?

Cause & Corrective Action to N. Date h 3? { 2s5 Esent aT

  • jE E ~ g =!

e-Repost = EL !C O

Present Recurrence 6

82-01 820417 5 744.0 C 4 XX Fuel XX Refueling, unit general inspection and retube condenser.

I 2 3 4 F: Forced Reason: Method: Exhibet G - Instructites S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-htanual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event ReporI (LERI File (NUREG-D-Regulatory Restriction 44 ontinuation 01611 1:. Operator Training & Ucensc Examination 5-Load Reduction F. Administrative 5 9-Other Exhibit I -Sanw Source G Operational Error IExplain) 19/77) flother (Explain) j

DOCKET NO. 50 118 ,

UNIT THUTDOWNS AND POWER RLDUCTIONS UNIT N AME C'1 vert c14fft #2 DATE 6/14/82 COMPLETED BY Elaine Lorito REN)RT MONT11 May 1982 TELifHONE (301) 787 5161-n.

E E EO "E Licensee Er Em Cause & Corrective fi No. Date k j! k 3 lEU $ Event {j V Adion to

  • yE 5 y g :!

e

Repost a mV u

o Present Recurrence 6

No outages or reductions.

I 2 3 4 F: Forted Reason: Method: Ex]ubit G Instructions S. Scheduled A Fquipment Fai!ure(Explain) 1 Manual for Preparation of Data B-Maintenance oi Test 2 Manual Scram. Entry Sheets for Ucensee C Refuehng 3 Automatic Scram. Event Repos (LER) File (NUREG.

D Regulatory Restrictsen 4scontinuation 016I) 1: Operator Training & Uccuse Lununation 5-Load Reduction F Admmistrative 5 9-Other Exhibit 1 Sanw Source G-Operational Error (Explain)

(9/77) llother (Explain)

. ~

June 2,1982 REFUELING INFORMATION REQUEST

1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1
2. Scheduled date for next Refueling Shutdown: April 16,1982
3. Scheduled date for restart following refueling: June 23,1982*
4. Will refueling or resumr tion of operation thereafter require a technical specification change or other license amendment?

Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.

l 5. Scheduled date(s) for submitting proposed licensing action and supporting information.

February 15, 1982

6. Important licensing considerations associated with the refueling.

Reload fuel will be similar to that reload fuel inserted into the previous cycle.

4 i 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 656*

t i

Spent Fuel Pools are common to Units 1 and 2

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblics.

1830 Licensed

  • 1358 Currently Installed
9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.

i April,1991 *

  • Information changed since last report .

1 i

v - -

-y,.. - , . - - .- --

June 2,1982 REFUELING INFORMATION REQUEST

1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
2. Scheduled date for next refueling shutdown: October 15, 1982.
3. Scheduled date for restart following refueling: January 5,1982
4. Will refueling or resumption of operation thereafter require a technical specification change or other licensed amendment?

Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

October 4,1982

6. Important licensing considerations associated with refueling.

Reload fuel will be similar to that reload fuelinserted in the previous cycle.

7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.

(a) 217 (b) 656*

Spent Fuel Poolis common to Units 1 and 2.

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.

1830 Licensed

  • 1358 Currently Installed
9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.

April,1991 *

  • Information changed since last report.

SUMMARY

OF UNIT 1 OPERATING EXPERIENCE - MAY 1982 5/1 At the beginning of this reporting period, Unit I was shutdown for its 5th scheduled refueling outage. Reactor Vessel head removed.

5/7 Commenced refueling at 0200.

5/13 Completed fuel handling evolutions.

5/31 At the end of this reporting period, Unit I was shutdown for its 5th scheduled refueling outage.

SUMMARY

O' JNIT 2 OPERATING EXPERIENCE - MAY 1982 5/1 At the beginni- of this reporting period Urat 2 was operating at 900 MWe with the reactor at 100% power.

5/2 Decreased load to 790 MWe at 0200 for Main Turbine Control Valve testing.

Resumed full load operation (900 MWe) at 0430.

5/3 At 0914 load was reduced to 770 MWe to investigate saltwater leakage into the main condenser. Load was increased to 900 MWe at 1600 when indications of saltwater leakage disappeared.

5/8 Decreased load to 780 MWe at 0200 to clean condenser water boxes. Load was increased to capacity (900 MWe) at 0740.

5/15 At 0600 load was decreased to 870 MWe for moderator temperature coefficient testing.

5/17 Resumed full load operation (890 MWe) at 1900.

5/22 Decreased load to 760 MWe at 0635 to test Main Turbine Control Valves, clean condenser water boxes and replace 21B Travelling Screen. Reactor power was reduced to 80% at 0800 due to approaching the 12 limit on main condenser circulating water A T. Load was increased to capacity (870 MWe) at 1800.

5/25 At 1300 load was decreased to 685 MWe to investigate saltwater leakage into the main condenser and clean condenser water boxes. Load was increased to 740 MWe at 1900 when indications of saltwater leakage disappeared.

5/26 Resumed full load operation (860 MWe) at 0600.

5/27 At 1915 load was reduced to 750 MWe to investigate saltwater leakage into the main condenser.

5/28 Load was increased to 870 MWe at 1000 when indications of saltwater leakage disappeared.

5/31 At the end of this reporting perioa Unit 2 was operating at 875 MWe with the reactor at 100% power.