ML20054G448
| ML20054G448 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 06/14/1982 |
| From: | Lotito E BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20054G425 | List: |
| References | |
| NUDOCS 8206210562 | |
| Download: ML20054G448 (2) | |
Text
-
i OPER ATING DAT 4 REPORT DOCKET NO.
50-317 DATE 6/14/82 COMPLETED BY Elaine lotito TELEPHONE (301) 787-5363 OPE RATING STA T US
- 1. Uni: Narre: Calvert Cliffs No. 1 Not" Revisions
- 2. Reporting Period; April 1982
- 3. Li: cased Thermal Pow er (Mws). 2,700
- 4. Nameplate Rating (Grms MWel:
918
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependab'e Capacity (Gross MWe):.#
825
- 7. Masimum Dependabic Capacity (Net MWe):
- 8. If Charges Oecer in Cap. city Ratings (lic.m Nunter 3 Thrnugh 7) Since Last Report.Giie Reasons.
- 9. Power Lese! To hhich Restricted.if Any (Net Mbe):
- 10. Reasom For Restnctiims. If Any:
Thia Month Yr..to Date Cs.mubtive
- 11. Ilours In Reporting PerioJ 719.0
_2,879.0
- 12. Number Oiilours Reactor was Critical 387.4 2,W.4 61,188.0 w, w.1 0.0 u.v 13 Reactor Res:ne shutdown Haurs 1,792.4
- 14. Ifoun Generator On-Line 387.4 2,547.4 48,149.1,
- 15. Unit Resene Shutdown linurs 0.0 0.0 060
- 16. Cross Thermal Energy Gererated IMWil) 1,022,292 6,735, % 7 116,toa,44)
- 17. Gross Electrical Energy Generated tMWill
_344,734 2,274,438 36, zoo,4aa
- 18. Net Electrical Energy Generated (MWHi 327,686 2,178,927
_ 36,480,960]
- 19. Umt Senice factor 53.9 88.5 78.7
- 20. Unit Asadability Facic:
53.9 88.5 78.7
- 21. Unit Capaciey Factor iUsing MDC Neti 55.2 91.7 72.3
- 22. Unit Capacity factor IUsing DER Net) 53.9 89.6 70.6
- 23. Unit F orced Outage Rate 0.0 0.0 8.4
- 24. Shutdowns Scheduled Oser Nest 6 Montns (Type. Date.and Duration of Eacht:
h.1 Plant on a planned outage from 4/17/82 for refueling, unit general inspection and retube condenser.
- 25. Il Shut Down At End of Report Perux!. Estimated Date of Startup:
- 16. Units In Test Status (Pnor io Commercial Oper3tioni.
Forecast Achieved INITIA L CRITICALITY.
INITl n L Et EC TRICITY COMMERCIAL OPE R ATION 8206210562 820614 PDR ADOCK 05000317 (c/77 )
R PDR
)
OPERATING DAT A REPORT DOCKET NO. 50-318 DATE 6/14/82 COMPLETED BY Elaine Lotito TELEPHONE (301) 787-5363 OPf RATING STAT US
- 1. Uni: Name: Calvert Cliffs No. 2 Notes Revisions
- 2. Rert,rting Period. Apri1 1982
- 3. Licenwd Thermal Power (MW ):
2,700 911
- 4. Nameplate Rating (Grms MWe):
845
- 5. Desiga Electrical Rating INet MWr):
- 6. Maximun Dependab'e Capacity IGross Mbel: 860
- 7. Maximum Dependable Capacity (Net Mhe):
825
- 8. If Charges Occur in Capseity Ratina;s life.r.s Nunter 3 Through 7) Since Last Report.Gi*e Reasons.
- 9. Poact Lesel To bhich lie.oricted. lf Any (Net Mh,:1:
- 10. Reuora For Restricti.ms. lf Any:
Thh Month Yr to.Date Cs.mobtive
- 11. Ilours In Reporting Period 719.0 2_,879.0
__ 44,543.0
- 12. Number Oi Hours Reactor Was Critical 709.6 2,569.7 38,137.7
- 13. Resetor Resene Shutdown Hours 0.0 9.4
- 14. Hours Generator On Line 705.7 2,547.2 723.6 37,591.6 0.0 0.0
'o,g
- 15. Urdt Resene Shutdown floors
- 16. Grosa Thermal Energy Generated IMWH) 1,879,776 6,726,888
_ 92,771,444
- 17. Gross Electrical Energy Generated lMWill 626,306 2,241.248 __ __30,656,651_
- 18. Net Electrical Energy Generated (MWH) 601,550 2.145,486
_29,231,297
- 19. Unn Sersice Facto, 98.2 88.5 84.4 20, Unit Asniability Factcr 98.2 88.5 84.4
- 21. Unit Capacity Factor (Using MDC Nett 101.4 90.3 79.6
- 22. Unit Capacity factor (Uung DER Net) 99.0 88.2 77.7
- 23. Unit Iorced Outate R.'te 1.9 11.5 5.8
- 24. Shutdowns Scheduled Oser Sest 6 Mon M (Iype. Date.an.1 Duration of Eacht:
- 25. If Shut Inown A End Of Report Period. Estimated Date of Startup-
- 16. Units la Test Status (Poor to Commerci2l Operatuin).
Forecast Achiesed INITIA L CRITICALITY INITI 4L El ECTRICl1Y COMMERCIAL OPERTTION (4/77)
.