Third Interim Deficiency Rept Re Auxiliary Bldg Fuel Handling Zone Ventilation Fans,Initially Reported on 810506. Negotiations in Progress to Have Coil Manufacturers Provide Seismic Qualifications for Hot Water Heating Coils
ML20054G323
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 06/11/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8206210436
Download: ML20054G323 (2)


Text

'

N k

TENNESg gV3' y,\\ AUTHORITY e

cHAThypicis AI TENNFSSEE 37401 400 Chestnut trehTowerII

\\\\O

.g \\

June 11, 1982 BLRD-50-438/81-35 BLRD-50-439/81-38 U.S. Nuclear Regulatory Commission Region II Attn:

Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - AUXILIARY BUILDING FUEL HANDLING ZONE VENTILATION FANS - BLRD-50-438/81-35, BLRD-50-439/81 THIRD INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V. Crlenjak on May 6, 1981 in accordance with 10 CFR 50.55(e) as NCR BLN BLP 8111. This was followed by our interim reports dated June 5 and December 14, 1981. Enclosed is our third interim report. We expect to submit our next report by September 30, 1982.

If you have any questions concerning this matter, please get in couch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Licensing Enclosure cc:

Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 ggifd.CUN

$?

W),1 t

f L

8206210436 820611 PDRADOCK05000g An Ecual Opoortunity EmoR m

o f

ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 AUXILARY BUILDING FUEL HANDLING ZONE VENTILATION FANS NCR BLN BLP 8111 BLRD-50-438/81-35 BLRD-50-439/81-38 10 CFR 50.55(e)

THIRD INTERIM REPORT Description of Deficiency The auxiliary building fuel handling zone ventilation supply air fans are mounted inside the common zone air intake plenums on elevation 686' along with ho; water heating coils and chilled water cooling coils. Since these fans provide ventilation and cooling of fuel handling engineered safety features (ESP) zones, they are safety related. The heating and cooling coils are not qualiff ed for seismic conditions since they were purchased nonseismic. During a seismic event, a hot water heating coil or chilled water cooling coil could rupture causing flooding of the air intake plenum and subsequent failure of both fuel handling zone ventilation supply air fans.

Interim Progress Negotiations are in progress to have the coil manufacturers provide seismic qualification for both the hot water heating coils and the chilled water cooling coils.

I