ML20054F650
| ML20054F650 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 06/02/1982 |
| From: | Streeter J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Mathews E WISCONSIN PUBLIC SERVICE CORP. |
| Shared Package | |
| ML20054F651 | List: |
| References | |
| NUDOCS 8206170189 | |
| Download: ML20054F650 (2) | |
See also: IR 05000305/1982002
Text
_ _ .
_
._
-
-
i
w
,
/
JUN 2
1982
l
i
Docket No. 50-305
Wisconsin Public Service
Corporation
'
j
ATIN:
Mr. E. R. Mathews
Senior Vice President
,
I.
Power Supply and
Engineering
Post Office Box 1200
,
Green Bay, WI 54305
j
Gentlemen:
i
'
This refers to the special inspection conducted by Mr. R. L. Nelson of
I
this office on January 11-14 and 29, 1982, of activities at Kewaunee
Nuclear Power Plant and NRC Region III office authorized by NRC Operating
License No. DPR-43 and to the discussion of our findings with
i
Mr. D. C. Hintz at the conclusion of the inspection.
The enclosed copy of our inspection report identifies the area examined
during the inspection. Within this crea, the inspection consisted of a
selective examination of procedures and representative records, observa-
tions, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
l
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
!
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
i
'
'
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
,
to file a request for withholding; and (b) submit within twenty-five (25)
i
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
'
j
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
4
i
a
8206170189
5
PDR ADOCK 0
G
-.
.
__
TE01
-
._
.
-
_
',
.
.
Wisconsin Public Service
2
Corporation
be accompanied by an affidavit executed by the owner of the information
,
'
which identifies the document or part sought to be withheld, and which
,
contains a full statement of the reasons which are the bases for the
'
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
i
J. F. Streeter, Chief
Projects Branch 2
)
Enclosure:
Inspection
I
Report No. 50-305/82-02(DPRP)
cc w/ enc 1:
D. C. Hintz, Plant
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Section
Stanley York, Chairman
Public Service Commission
i
RII'
[
RIII
gf
3
Ko k..in/jp
Stfecter
5 8/82
("/li
- - .
. - - -
-