Monthly Operating Rept for May 1982
ML20054F185
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 06/04/1982
From: Goodman L
DAIRYLAND POWER COOPERATIVE
To:
Shared Package
ML20054F177 List:
References
NUDOCS 8206150290
Download: ML20054F185 (13)


Text

-_ _ -.

OPERATLNG DATA REPORT 50-409 DOCKET NO.

DATE 6-4-82 COSIPLETED 11Y L.S.G00HMAN TELEPilONE 608-6RQ-?331 OPERATING STATUS La Crosse Boiling Water Reactor N"

1. Unit Name:

0001, 05-01-82 TO 2400, 05-31-82

2. Reporting Period:

165

3. Licensed Thermal Power (htWt):

65.3

4. Nameplate Rating (Gross 5the1:

50

5. Design Electrical Rating (Net 5the1:
6. 31stimum Dependable Capacity (Gross NIWel:
7. Slasimum Dependable Capacity (Net SlWe):

S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasone

9. Power Lesel To which Restricted. If Any (Net 51we):
10. Reasoas For Restrictions. If Any:

This hionth Yr.-t o.Da t e Cumublise 744 3624

_110,283 i1. Ilours in Reporting Period 0

1796.6 73,070.2

12. Number Of Ilours Reactor Was Critical
13. Reactnr Resene Shutdown llou,,

0 0

478 0

1706.2 67,398.4

14. Ilours Generator On-Line 0

0 79

15. Unit Resene Shutdan Ifours 0

212,692.4 9,208,481.1

)

16. Gross Thermal Encq:y Generated (%1Wil) 0 59,143 2,749,001 17 Grou Electrical Er.ngy Generated (%1Will 53,931 2,541,923
18. Net Electrical Energy Generated th1Wil)

-466 0

47.1 61.1

19. Unit Senice Factor 0

47.1 61.2

20. Unit Asailability Factor 0

31.0 48.0 l

21. Unii Capacity Factor iUsing slDC Net 1 0

29.8 46.1

22. Unit Capacity Factor (Using DER Net) 0 27.6 8.1
21. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Nest 6.\\1onths tType. Date,and Duratims of EacM:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

July 19,,_19S2

26. Units in Test Status IPrior to Commercial Operation):

Forecau A chies ed l

INITi \\L CRITICALITY INiilAL ELECTRICITY CO\\1\\tERCI \\ L Orl R \\ TION a ~,

8206150290 920609 PDR ADOCK 05000409 PDR R

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-409 LACBWR g3,7 06-04-82 DATE COMPLETED BY L.S.G0ODMAN TELEPHONE 603-689-2331 McNul MAY, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IMWe-Net)

(MWe-Net)

I O

0 i7 2

0 33 0

3 0

0 i,

0 4

yg o

0 5

2 0

6 0

2:

0 7

0 23 0

8 0

0 24 9

0 25 0

10 0

26 0

0 o

1I 37 12 0

8 33 o

13 0

0 29 14 0

0 30 15 0

0 33 16 0

INSTRUCT 10NS On this format, list the aserage daily unit power levelin MWe Net for each day in the reportmg month. Compute to the nearest whole megawatt.

(9/77 )

a

50-409 DOCKET NO.

UNIT SilU1 DOWNS AND POWER REDUCTIONS UNIT NAME LACBWR DATE 06-04-82 COMPLETED BY I R nnnnMf*N REPORT MONTil MAY 1982 TELEPHONE 608-689-2441 l

-f*L

[?

} h[

Licenset 5%

Cauw A Correstne

--y

,o Date

,?

4 2;e Evens s7 gJ At am in

$5 cI jdj RcPost E0 5'

Picsent Recurrente d

82-07 04-09-82 S

744.0 C

1 NA NA NA SCHEDULED REFUELING OUTAGE EXPECTED DURATION OF 15 WEEKS.

l I

i 2

3 4

5 l'.n ced Reaum:

Method:

Estnbit G Instruttiinis

% SJ.eduled A E.luiprnent Failure (l.splain) 1 Manual for Picparation of Data R. Maintenance of Test

. -Manual Saam.

1.nia) Sheets t'or Ucensee C Refueling 4 Autonutic Stram.

I'. vent Repost 81.1 R)FdeiNURIL D-Regulator) Restriction 4 0;hes iI splaini 01611 IMperJtor TrJming A IJienW I UmWJtion F Administra ise 4

G-Operational l'ison (INplain t I shibit !- Same Somcc ra 77p 11 Other ilNplam)

INSTRUMENT AND ELECTRICAL MAINTENANCE LER OR NATURE OF OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION RADIATION PROTECTION CORRECTIVE OUTAGE AGE, WEAR DAMAGED HEADS REPLACED HEADS AND COMPUTER (ND 6600)

MR-0338 82-07 AND DISC DISC ENVIRUNMENTAL SAMPLING PUMP CORRECTIVE CUTAGE USAGE DEFECTIVE VACUUM REPLACED GAUGE 8' 07 GAUGE AIR MONITOR MR-0369 d

AREA RADIATION MONITOR #7 TEST OUTAGE UNKNOWN LOW READING RE-ENERGIZED AND MR-0370 82-07 TESTED 1

LAB HOOD AIR PUMP CORRECTIVE OUTAGE USAGE PUMP INOPERATIVE REPLACED MOTOR MR-0375 82-07 BEARINGS 4

0FF-GAS MONITOR CORRECTIVE OUTAGE METAL GROUNDED INOPERATIVE REMOVED GROUND (VICT0REEN)

MR-0373 82-07 4

J MOBILE AIR ACTIVITY CORRECTIVE OUTAGE DEFECTIVE POT.

LOW READING REPLACED WITH SPARE MONITOR MR-0326 5J2-07 SECURITY E-FIELD CORRECTIVE OUTAGE SUPPORT COIL ALARMS TIGHTENED SUPPORT COIL MR-0339 82-07 LOOSE SECURITY SHERIFF RADIO CORRECTIVE OUTAGE UNKNOWN NO RECEIVE COMMUNICATIONS DEPARTMENT MR-0329 82-07 REPAIRED SECURITY CRT TERMINAL CORRECTIVE OUTAGE FACILITY COMPLETED INSTALLED TRANSFER MR-0313 82-07 CHANGE 78-17 MODIFICATION-SWITCH SECURITY CAMERA 20-5 CORRECTIVE OUTAGE USAGE P00R PICTURE ADJUST FOCUS AND LENSE-l MR-0381 82-07 i

SECURITY TERMINAL PRINTER CORRECTIVE OUTAGE UNKNOWN P00R PRINTING ADJUST PRINTER MR-0391 82-07 MECHANISM 1

SECURITY SYSTEM CORRECTIVE OUTAGE UNKNOWN OPEN CONTACT RESET CONTACT SWITCH CH. 25-4 MR-0400 82-07 1

WP6 i

MAY 1982 INSTRUMENT AND ELECTRICAL MAINTENANCE LER OR NATURE OF OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE

[ESULT CORRECTIVE ACTION SECURITY BATTERY CHARGER CORRECTIVE OUTAGE POWER DUTAGE BLOWN CAPACITOR REPLACED CIRCUIT BOARD MR-0411 82-07 DIESEL GENERATOR FIRE MODIFICATION OUTAGE FACILITY CHANGE COMPLETED INSTALLED VOLTAGE ALARM CO2 SYSTEM MR-0318 82-07 06-82-16 MODIFICATION AUTOMATIC GAIN SYSTEM PREVENTIVE OUTAGE TEST DUE COMPLETED TESTS COMPLETED TESTS (AGS) REFUELING TEST 82-07 SAFETY SYSTEM CH 1, 2, PREVENTIVE OUTAGE TEST DUE COMPLETED TESTS COMPLETED TESTS AND H 023 82-07 NUCLEAR CH N-5 THROUGH PREVENTIVE OUTAGE TEST DUE COMPLETED TESTS COMPLETED TESTS N-5 N-8 82-07 THROUGH N-8 DIESEL BUILDING 1B BATTERY PREVENTIVE OUTAGE TEST DUE COMPLETED TESTS COMPLETED REFUELING TEST SYSTEM 82-07 HUMIDITY SYSTEM IN PREVENTIVE OUTAGE TEST DUE COMPLETED TESTS REC 0ATED AND CHECKED CONTAINMENT 82-07 HUMIDITY CELLS HIGH PRESSURE SERVICE CORRECTIVE OUTAGE SENSING LINE INCORRECT CLEARED SENSING LINE WATER (HPSW) SURGE TANK MR-0342 82-07 PLUGGED READING REACTOR BATTERY CHARGER CORRECTIVE OUTAGE DRIFTING DRIFT IN V0LTAGE REPLACED ZENER DIODE MR-0345 82-07 DIODES CONTROL 1B AIR COMPRESSOR LOAD CORRECTIVE OUTAGE USAGE SET POINT LOW ADJUSTED LOADING SWITCH MR-0359 82-07 SWITCH ELECTRICAL PENETRATION REPLACEMENT &

OUTAGE FACILITY NA INSTALLED NEW MI CABLE NO. 4 INSTALLATION 82-07 CHANGE AND TESTED MR-0362 &

MR-0356 WP6 MAY 1982 INSTRUMENT AND ELECTRICAL MAINTENANCE i

LER OR NATURE OF OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER sAUSE RESULT CORRECTIVE ACTION 1A HPSW DIESEL PUMP CORRECTIVE LER-82-08 UNKNOWN START GEAR REPLACED STARTER MR-0380 OUTAGE 82-07 CHEWED UP ASSEMBLY SEAL INJECTION LEVEL CORRECTIVE OUTAGE REQUESTED COMPLETED TEST CALIBRATED LEVEL AND ALARM INDICATOR MR-0397 82-07 POINT ELECTRICAL PENETRATION CORRECTIVE LER-82-11 UNKNOWN AIR LEAKAGE REPAIRED LEAKS AND TESTED j

NO. 5-2A, 6A & 12A MR-0406 0UTAGE 82-07 PENETRATION GAUGE CORRECTIVE OUTAGE OVER-GAUGE INOPERATIVE REPLACED WITH NEW GAUGE MR-0409 82-07 PRESSURIZED l

TECHNICAL SUPPORT NEW INSTALL-OUTAGE NA NA INSTALLED WIRING FOR SYSTEM WIRING ATION 82-07 TECHNICAL SUPPORT i

MR-0312 SYSTEM FC-03-80-1 GENERATOR STATOR PREVENTIVE OUTAGE NA NA CLEANED WINDINGS WINDINGS MR-0245 82-07 STACK MONITOR FLOW CORRECTIVE OUTAGE UNKNOWN WOULD NOT TRIP ADJUSTED, RESET LOW FLOW ALARM MR-0353 82-07 WITHIN TOLERANCE SWITCH RANGE FIRE DETECTORS PREVENTIVE OUTAGE PM PM COMPLETED TESTS 82-07 k

l WP6 MECHANICAL MAINTENANCE DEPARTMENT LER OR NATURE OF OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION TURBINE PREVENTIVE OUTAGE NA NA FIVE-YEAR INSPECTION MR-0244 82-07 GENERATOR PREVENTIVE OUTAGE NA NA FIVE-YEAR INESPECTION MR-0245 82-07 HtGH PRESSURE SERVICE CORRECTIVE OUTAGE FLAW IN PIPE WATER LEAK REPLACED SECTION OF PIPE WATER (HPSW) PIPING MR-0944 82-07 UPPER CONTROL R00 DRIVE CORRECTIVE OUTAGE WORN SEALS WATER LEAK COMPLETE P.M. AND (UCRD) NO. 16 MR-1087 82-07 REPLACED SEAL STACK GAS SAMPLE SYSTEM NEW INSTALL-OUTAGE NA NA NEW SAMPLE SYSTEM ATION 82-07 F.C. 45-81-4 MR-0265, MR-0266, 8 MR-1062 PRIMARY COOLANT SAMPLE NEW INSTALL-OUTAGE NA NA NEW SAMPLE SYSTEM SYSTEM ATION 82-07 F.C. 71-80-1 MR-0883 MAIN STEAM RELIEF PREVENTIVE OUTAGE NA NA COMPLETE P.M. AND VALVE NO. 1 MR-0354 82-07 RESET N0ZZLE AND GAUGE RIFS REACTOR HEAD AND CORE REFUELING OUTAGE NA NA REFUELING RESTORATION SPRAY PIPING REINSTALLED 82-07 MAIN AIR LOCK INNER 000R CORRECTIVE OUTAGE HORSING D00R SHEARED TWO REPLACED TWO KEYS MR-0399 82-07 OPENED AND KEYS CLOSED WITH HANDWHEEL WP6 MECHANICAL MAINTENANCE DEPARTMENT LER OR NATURE OF OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION RETENTION TANK VALVE CORRECTIVE LER-82-09 DIRTY LEAKED LAPPED SEAT AND DISC NO. 54-25-006 MR-0395 0UTAGE 82-07 CONTAINMENT BUILDING CORRECTIVE LER-82-10 TEFLON TRIM LEAKED INSTALLED NEW TYPE OF HEATING STEAM VALVE MR-0404 0UTAGE FULL OF TRIM NO. 73-25-021 82-07 SCRATCHES HPSW CONTAINMENT ISOLATION CORRECTIVE LER-82-11 DIRTY LEAKED LAPPED CLAPPER AND CLEANED VALVE NO. 75-26-003 MR-0403 CONTROL R0D DRIVE (CRD)

CORRECTIVE OUTAGE WORN WOULD NOT PUMP COMPLETELY OVERHAULED N02 B0OSTER PUMP MR-0412 82-07 UP TO PRESSURE EMERGENCY SERVICE WATER CORRECTIVE OUTAGE FLAT SPOTS ON WOULD NOT HOLD FILES OUT FLAT SPOTS ON SAFETY SYSTEM (ESWSS)

MR-0319 82-07 FITTINGS HYDR 0 FITTINGS AND REBANDED SEISMIC RESTRAINTS NEW INSTALL-OUTAGE NA NA INSTALLED SEISMIC ATION 82-07 RESTRAINTS FACILITY CHANGES 78-82-5, 74-82-12, 78-82-4, 78-81-7 &

74-81-9 TURBINE OIL FILTRATION NEW INSTALL-OUTAGE NA NA NEW FILTRATION SYSTEM SYSTEM ATION 82-07 MR-0357 1A SEAL INJECTION PUMP CORRECTIVE OUTAGE COATING FLAKED WATER LEAKAGE REPLACED ALL 3 OLUNGERS MR-0178 82-07 0FF AND REPACKED WP6 MAY 1982 MECHANICAL MAINTENANCE LER OR NATURE OF OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION 1B SHIELD COOLING PUMP CORRECTIVE OUTAGE WEAR WATER LEAKAGE REPLACED SEAL MR-0262 82-07 HIGH PRESSURE CORE SPRAY CORRECTIVE OUTAGE ORIGINAL INSUFFICIENT ADDED MATERIAL TO WELD (HPCS) LINE MR-0387 82-07 INSTALLATION MATERIAL IN FILLET WELD 1A FORCED CIRCULATION CORRECTIVE OUTAGE POSSIBLE TUBE WATER IN OIL INSPECTED FOR LEAKS; PUMP (FCP) OIL COOLER MR-0388 82-07 LEAKS NONE FOUND WP6 -

l

\\ '

'N AR5?ATI VE SUMMAR Y OF OPERATING EXPERIENCE t

MAY 1982 The refueling outage which commenced April 9, 1982 continued through the May reporting period.

Type B and C leakage tests were conducted during May 1982.

The leakage rate results of the tests which met the acceptance criteria are as follows:

LEAKAGE RATE TYPE TESI:

TEST (SCFH)

B Main Steam Penetration 0.036 B

Feedwater Penetrat on 0.054 B

Heating Steam and Condensate 0.10 Penetration B

Freight Door 0.01027 C

Containment Vacuum Relief Valve 0.03 No. 1 C

Containment Vacuum Relief Valve 0.015 No. 2 B

Electrical Penetrations:

10 0.0737 1E O

2A 0.006 2B 0.077 2C 0.015 20 0

2E O

3 0

4 0, 0.029, 0.0294 5

0.058 6

0.049 1B-1A 0.0005 IB-1B 0.0022 1B-1C 0.0038 1B-1D 0.0016 18-1E 0.0005 1B-2A 0

1B-2B 0

18-2C 0

1B-2D 0.0012 1B-2E 0

18-2F 0.0005 IB-1 0.0014 1B-2 0.0014 WP-6 1-

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE - (Cont'd)

LEAKAGE RATE TYPE TEST (SCFH)

B Electrical Penetrations:

IB-3 0.0025 IB-4 0.0037 1B-5 0.0012 1C-6 0

18-7 0.0016 IB-8 0.0005 1B-9 0

1B-10 0

1C-1 0.0017 1C-2 0.0045 1C-3 0.0017 1C-4 0.0023 1C-5 0

1C-6 0.0006 1C-7 0.0006 1C-8 0.0006 1C-9 0.0006 1C-10 0.0011 1C-11 0

1C-12 0.0023 1C-13 0.0028 1C-14 0.0023 1C-15 0.0023 1C-16 0.0028 1C-17 0.0017 1C-18 0.0214 1C-19 0.0023 1C-20 0.0006 1C-21 0

1C-22 0

1C-23 0

1C-24 0

1C-25 0

1A-3 0.0013 1A-4 0.0016 1A-5 0.0013 B

Containment Spray Handwheel O

C Ventilation Discharge Dampers 0.027 8

Outside Ventilation Dampers Pass Flanges C

Ventilation Inlet Dampers 0.0136 C

Reactor Vent Header 0.045 C

Containment Building Heating Steam 0

WP-6 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE - (Cont'd)

LEAKAGE RATE TYPE TEST TEST (SCFH)

C Containment Building Heating 0

Steam Condensate Return C

Station Air 0

C Main Steam Isolation and Bypass 7.56 Valve C

Feedwater Check Valve 0.00064 C

Decay Heat Blowdown and Steam 0

1 Traps Drain to Hotwell C

Shutdown Condenser Vent to 0

Offgas C

Primary Purification Resin Sluice 0

Line C

Alternate Core Spray Check Valves O

C Containment Building Suction

<0.04 Drain Line C

Demineralized Water Containment 0.223 Isolation Valve C

Condensate Demineralizer to Seal s

Injection Reservoir Makeup Line C

Control Air 0

C High Pressure Service Water (HPSW)

Containment Isolation Valve 0.178 C

Fuel Element Storage Well (FESW) 0 Ion Exchanger Resin Sluice Line C

Retention Tank Pump Discharge O

C Reactor Cavity Purge Air

<0.04 C

Containment Building Pressure 0

Switches C

Containment Atmosphere Post 0.0021 Accident Sampling System Suction WP-6 S.

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE - (Cont'd)

LEAKAGE RATE TYPE TEST TEST (SCFH) d C

Cc.it a i nme n t Steam Post Accident 0.01 8

Sampling System Discharge M

-u TOTAL LEAKAGE....

8.77

_m i

Signi ficant maintenance items performed during the reporting period a

are indicated on the attached Mechanical Maintenance and Instrument and Electrical Maintenance listings.

=

~

_I WP-6 '

y

_ _ _.....